020 7864 7245Request a fixed quote

Building regulations

Building regulations drawings in London

Building regulations drawings are the technical sheets that show how an extension, loft or conversion meets the Building Regulations 2010: structure, insulation, fire safety, drainage and ventilation. Prices begin at £845 including VAT for London homes, and the set is coordinated with the structural engineer and ready for building control.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on building regulations drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    House extension under construction with scaffolding, new glazed doors and building materials

    What building regulations drawings are for

    Planning permission decides whether you may build. Building Regulations decide whether what you build is safe, warm and sound. They are separate approvals, with separate drawings, separate officers and separate fees.

    Planning drawings show shape and appearance. Building regulations drawings show construction: the depth of foundations, the beam sizes, the insulation in the walls, the stair geometry and where the drains run. Builders take their prices and their instructions from them, and building control inspects against them.

    Even work that needs no planning application, such as a rear extension under permitted development, needs Building Regulations approval.

    Brick house being extended, with a wide new opening supported over the ground floor

    Full plans, building notice and the timings that apply

    There are two usual routes. A full plans application is checked and decided before work starts. A building notice lets work begin after notice is given, and the checking happens on site as you build.

    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. For a building notice, the notice lapses after 3 years unless work has started.

    We prepare drawings for full plans, because a decided set gives your builder certainty before the first trench is dug. A building notice suits small, well-understood jobs, and we will say so if yours is one.

    What our drawings show

    A typical extension set has a foundation and ground-floor plan, a first-floor and roof plan, sections through the new structure, and a specification of materials. Details are drawn at larger scale where junctions are tricky: the wall-to-roof junction, a threshold, a flat-roof edge.

    We coordinate the set with the structural engineer's calculations, so beams and padstones on our sheets match theirs. Drainage is shown with falls and connections to the existing system. Where the design touches the Approved Documents, the notes cite the relevant part.

    Plans, sections and elevations are all cut from a single Revit model, so they cannot contradict one another. Our structural calculations and construction drawings pages explain the neighbouring services.

    The specification lists products and workmanship standards by name, so your builder's choices can be checked against the design rather than argued about on site.

    Approved Documents and the energy rules

    The Approved Documents give practical guidance on meeting the regulations. The ones that shape most home projects are Part A for structure, Part B for fire safety, Part F for ventilation, Part L for energy and Part K for stairs.

    Energy rules are changing. A new edition of Approved Document L brings in a revised way of calculating a home's energy use, and the date it takes effect is in the table. Until then the current edition applies to new applications. We design to whichever edition governs your submission date and tell you if timing matters.

    Where a project also needs an energy rating, our SAP calculations team coordinates the assessor.

    Notices, commencement and the rules on competence

    Building control must be told when work starts and when it finishes. The notice periods are set in regulation 16 and are in the table. A missed notice can delay the completion certificate.

    Approval also lapses if work does not commence. For an extension, commencement is defined: foundations, any basement and the ground-floor structure must be complete. Other work is judged on how much of the application has been done. Start the clock deliberately, not by accident.

    Since the dutyholder rules in Part 2A, anyone carrying out design or building work must have the skills, knowledge, experience and behaviours to do it. For a domestic client the duties pass in large part to the contractor. Our handover notes record this, so your builder knows what is expected.

    What happens if work starts without approval

    Breaking the Building Regulations is a criminal offence, and the table gives the penalty on indictment. In practice councils work with owners, but unapproved work can block a sale and force opening-up of finished structure for inspection.

    If work has already been built, our retrospective planning applications page covers the planning side and we can prepare evidence for a regularisation route on the building control side.

    Choosing building control and moving to site

    You may use the local authority or a private firm on the approvers' register. Our private building control page sets out the difference, and we coordinate whichever you pick.

    We submit the full plans application, deal with any examiner questions and, once approved, send a handover pack covering commencement, party wall timing and CIL. Sheets usually follow the survey by about a week, and should the examiner raise points, revised sheets carry no extra fee.

    Send us the planning approval or certificate, the survey and any earlier building control paperwork for the house. If you already have an engineer, tell us, and we will work with them.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk
    Building Regulations 2010 reg 16(1)Give notice of intention to start; work may start 2 days after the notice—legislation.gov.uk
    Building Regulations 2010 reg 16(3C)Notify commencement within 5 days after work is regarded as commenced days—legislation.gov.uk
    Building Regulations 2010 reg 16(4)Notify completion within 5 days of completing the work days—legislation.gov.uk
    Building Regulations 2010 reg 13: building notice ceases after 3 years unless work has started3 years—legislation.gov.uk
    Building Regulations 2010 reg 46A(3)-(4)Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application—legislation.gov.uk
    Building Act 1984 s35(4), substituted by Building Safety Act 2022 s39Contravening building regulations: on indictment up to 2 years' imprisonment or a fine (or both)—legislation.gov.uk
    Building Regulations 2010 reg 11F(1) (Part 2A, from 1 Oct 2023)Anyone carrying out design or building work must have the skills, knowledge, experience and behaviours (or organisational capability) to do it—legislation.gov.uk
    Approved Document L Vol 1 2026, p.2AD L 2026 (Home Energy Model) takes effect 24 Mar 2027 for non-higher-risk work—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need building regulations drawings if I have planning permission?

    Yes. Building Regulations are a separate approval from planning. Work under permitted development needs them too.

    What is the difference between full plans and a building notice?

    Full plans are checked and decided before work starts. A building notice lets work begin after notice is given, with checks on site. We normally prepare full plans.

    How long does building control take to decide?

    The regulations set a statutory period for deciding a full plans application, which can be extended by agreement in writing. Actual timing varies, so plan with some slack.

    How much do building regulations drawings cost?

    They start at £845 including VAT, fixed and published up front. Building control charges are separate.

    Does approval ever lapse?

    Yes, if work does not commence. For an extension, commencement means foundations, any basement and the ground-floor structure are complete.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.