Building regulations
MEP design in London
MEP design covers the mechanical, electrical and plumbing systems of a building: heating, ventilation, power, lighting, hot and cold water and drainage, worked out as one design instead of five. We provide it for London houses, extensions and small new builds, drawn into the same model as the architecture. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

What MEP design means for a house
In a large building, MEP is a specialist consultancy. In a home it is the set of decisions that decide whether the finished house is comfortable, quiet and cheap to run: where the boiler or heat pump sits, how air moves through a sealed extension, which circuits feed the kitchen and where the pipes go under a new floor.
Left until late, those decisions collide with the structure. A duct meets a beam, a soil pipe runs through a bedroom wall, a cylinder has no cupboard to live in. Designing the services alongside the plans means each of those is solved on screen, while changing a line costs nothing.
The work sits between our building regulations drawings and the installer. We produce the design and drawings, and a qualified installer fits and certifies the systems.

The energy rules that shape the services
Approved Document L sets the fabric standards that decide how big the heating system needs to be. For a new dwelling the limiting U-values are 0.26 W/m²K for walls, 0.16 for roofs and 0.18 for floors. Extensions are held to tighter values on some elements, with 0.15 for the roof.
Heat pumps have a design condition written into the guidance: the maximum flow temperature is 55 degrees Celsius. Radiators, underfloor loops and the cylinder are sized to work at that figure, not at the higher temperatures a gas boiler allows.
Newer dwellings also have a renewable electricity target. The Approved Document L (2026) calculation assumes panels covering 40 per cent of ground floor area. The next editions of Approved Documents L and F take effect on 2027-03-24 (year, month, day), so a scheme starting after that date may be judged under them.
Ventilation, overheating and water
Airtight homes need planned ventilation. Approved Document F sets a whole-dwelling rate that depends on bedrooms: 19 l/s for one bedroom, 31 l/s for three, and 6 l/s more for each bedroom after five. A minimum of 0.3 l/s per square metre of floor also applies. The design picks fans and ducts to achieve those flows quietly.
Overheating is a separate duty, covered by Approved Document O, and it applies narrowly: new residential buildings only (dwellings, institutional and other residential). Extensions are not in scope, though good design still limits solar gain.
Water efficiency is set by regulation. The standard is 125, and 110 where the optional requirement is imposed. Taps, showers and cisterns are chosen from that budget. For the drainage side, see our plumbing and drainage drawings page.
Electrical and charging provisions
Approved Document S requires a charge point for new dwellings with parking, and defines it: a nominal output of at least 7 kW. The consumer unit, cable route and load assessment need to allow for it from day one.
That connects to the wider electrical design, which our electrical design drawings page covers in detail, and to the sheets that show everything in one place: our M&E drawings service.
What we produce and what it costs
A typical MEP package has a heating strategy and heat-loss summary, a ventilation layout with flow rates, power and lighting layouts, a water and drainage schematic, plant and cylinder locations, and the notes the installer needs to certify the work. Everything is drawn into the model, so builders see one coordinated set.
We do not publish a starting price, because a one-room extension and a whole-house retrofit are far apart in scope. We run a free constraints check, ask what systems you want, and give a fixed quote. If the design needs a specialist calculation beyond our scope, we say so and agree it with you before any work starts.
How the design runs alongside the drawings
Early decisions carry the most weight. Whether the house heats by gas or by heat pump, whether it has a basement plant room, and how many bathrooms stack above one another all change the layout. We list those choices at the start and cost them in plain terms, so the decision is yours and made on paper.
Services design starts when the layout is nearly settled and finishes before construction drawings. We take the architectural model, add systems in rough, and test them against the structure. A short list of conflicts comes back, which we resolve with the architectural design.
An independent check follows: a second technologist reviews the services set against the regulations, and a senior review signs it off. Then it joins the construction set, and our construction drawings page shows what that final package looks like.
MEP design by borough
Boroughs differ in what they ask for, from air quality zones to local energy policies. Our council pages list the local designations and decision statistics that affect a home project. Start with Camden's planning facts, or see all places under architectural drawings by area.
The national rules in figures
| Measure | Value | Period | Source |
|---|---|---|---|
| AD L Vol 1 (2021 incl 2023) Table 4.1, PDF p.34; 2026 edition Table 3.1 | 0.26 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.1, PDF p.34; 2026 edition Table 3.1 | 0.16 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.1, PDF p.34; 2026 edition Table 3.1 | 0.18 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.2, PDF p.35; 2026 edition Table 3.2 | 0.15 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2026) para 4.10, PDF p.51; 2021 edition para 5.10, PDF p.46 | 55 degC | — | gov.uk |
| AD L Vol 1 (2026) para 5.73(a) and equation 5.1, PDF p.67 | 40 | — | gov.uk |
| AD L Vol 1 (2026) front matter; SI 2026/335; Circular 01/2026 paras 15-17 | 2027-03-24 | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 19 l/s | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 31 l/s | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 6 l/s | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 0.3 l/s | — | gov.uk |
| AD O (2021) para 0.3 and Table 0.1, PDF p.9 | new residential buildings only (dwellings, institutional and other residential) | — | gov.uk |
| Building Regulations 2010 reg.36(1)-(3); AD G (2015 incl 2016 and 2024 amendments) Requirement G2 and reg.36, PDF p.17 | 125 litres per person per day | — | legislation.gov.uk |
| Building Regulations 2010 reg.36(1)-(3); AD G (2015 incl 2016 and 2024 amendments) Requirement G2 and reg.36, PDF p.17 | 110 litres per person per day | — | legislation.gov.uk |
| AD S (2021) para 6.2, PDF p.35 | 7 kW | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
What you receive


Questions
What does MEP stand for?
Mechanical, electrical and plumbing. In a house that means heating, ventilation, power, lighting, hot and cold water and drainage, designed together.
How much does MEP design cost?
Fixed quote after a free constraints check. The price depends on the size of the project and the systems you want, from a single extension to a whole-house design.
Do I need MEP design for an extension?
Not as a separate service for a small one, but the heating, ventilation and electrics still have to comply. Designing them with the plans avoids clashes with the structure.
What is the maximum flow temperature for a heat pump?
The guidance sets 55 degrees Celsius for design. Emitters are sized to work at or below that figure.
Do new homes need an electric vehicle charge point?
New dwellings with associated parking need a charge point of at least 7 kW nominal output under Approved Document S.
Sources and dates
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.