Garage conversion plans in London

Turning an integral or attached garage into a bedroom, office or kitchen is a common way to add floor space, and the plans decide whether it needs permission. We draw garage conversion plans for London homes from £695 including VAT, with a second chartered technologist checking every sheet.

From £695 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Two-storey rear extension under construction on a semi-detached house

    What garage conversion plans include

    The set shows the garage as built and as converted: floor plans, elevations, a wall and floor section, and a block plan. The section is the key sheet. It shows how the cold concrete floor, the thin garage wall and the old door opening become a warm, dry, ventilated room.

    Where the up-and-over door is replaced with a wall and a window, the change alters the front elevation, so the elevation drawing and the choice of brick or render count as much as the room layout.

    We also draw the link to the house, any new drainage and the position of radiators, so builders can price a single set. For wider technical detail, see our building regulations drawings.

    House extension under construction with scaffolding, new glazed doors and building materials

    Do you need planning permission to convert a garage?

    Frequently not. The law treats internal changes this way: Works affecting only the interior, or not materially affecting external appearance, are not development. If you keep the front looking like a garage, the project may need no application at all.

    Where you replace the door with a wall, the exterior matters. The rule on materials is: Exterior materials must be of similar appearance to the existing house (conservatories excepted). That is why the choice of brick bond and colour is on our drawings from the start.

    A previous planning condition can still block a conversion: some estates were approved on the basis that garages stay as parking. We check the planning history for exactly that during the free constraints check, and a Lawful Development Certificate can confirm the position in writing when it is clear.

    When a householder application is the route

    A householder application is needed where a condition removes the freedom, where the house is a flat, or where the conversion adds an extension. The council fee for altering a single dwellinghouse is £548 from the current fee table, paid to the council on top of our fixed fee.

    Conservation areas and Article 4 directions can also restrict external changes to a front elevation. Our planning drawings set then carries the application, drawn to the council's design guidance.

    We give the route before you pay: after the constraints check you know whether you are building under no application, with a certificate or with a householder permission.

    Building Regulations for a converted garage

    Even when planning is not needed, a garage conversion always needs Building Regulations approval, because a store becomes a habitable room. The heat-loss rules are the first test: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4.

    Safety comes next. For a bedroom the escape window rule says: Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor. Ventilation is in Approved Document F: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s.

    Alarms complete the picture: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. These are drawn onto the technical set so building control can approve it first time.

    Garage conversion plan prices

    Garage conversion plans start at £695, VAT included. The price is published and fixed, and we confirm it after the free constraints check.

    If a householder application is needed, the council fee is paid separately to the council. If the council asks for changes, we redraw at no charge until approval, which commits our fees and not the council's decision.

    Planning a home office instead? A garden room may be simpler. Adding a self-contained unit is a larger project, covered under flat conversion drawings.

    From survey to submission

    We survey the garage and the neighbouring walls on one datum, including the floor level against the house and the drain runs. Then we model it in 3D and show you options for the front and the room layout.

    You choose in writing and the design is frozen. A second chartered technologist, not the drawer, checks each sheet and a senior review signs it off.

    Drawings are normally ready about a week after the survey. We then handle the certificate or application and any officer questions, with amendments inside five working days.

    Things to settle before the drawings start

    The first question is where the car goes. An original planning condition may require the garage to stay as a garage, and some councils expect parking to be kept. Read the decision notice for the house if you have it. If not, we find it in the planning history during our constraints check.

    The second is the front. Replacing a garage door with a window and wall changes the street view, so we draw the new brickwork and window on the elevation and section drawings, matching bond and materials to the house.

    The third is the floor and the walls. Old garage slabs are often thin and uninsulated, and the walls may be single skin, so the thermal and damp details need care. They go on your building regulations drawings, so a builder prices an insulated floor rather than guessing.

    Garage conversion plans by council

    Councils differ on front elevations, parking and conservation areas. Their pages give the local figures. Start with architectural drawings in Camden to see the kind of constraints that can apply.

    Pick your borough from architectural drawings by area.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    TCPA 1990 s55(2)(a)Works affecting only the interior, or not materially affecting external appearance, are not development—legislation.gov.uk
    Class A, condition A.3(a)Exterior materials must be of similar appearance to the existing house (conservatories excepted)—legislation.gov.uk
    Householder: alterations/extensions to a single dwellinghouse, from 1 Apr 2026548 GBP—ribblevalley.gov.uk
    Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4—gov.uk
    Approved Document B Vol 1, 2019 ed. incl. 2026 amendments, para 2.10Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor—gov.uk
    Approved Document F Vol 1 2021, Table 1.1Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s—gov.uk
    Approved Document B Vol 1, paras 1.1-1.2All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Upper floors of a large yellow-brick Victorian house in London with chimney pots
    Unit by unit
    Move up and down — the nearest units slide out.

    Questions

    How much do garage conversion plans cost?

    They start at £695 including VAT, fixed and published up front. A council fee of £548 applies if a householder application is needed.

    Do I need planning permission to convert my garage?

    Not always. Internal works are not development, but a planning condition, a flat, a conservation area or a changed front can bring an application in. The free constraints check settles it.

    Does a garage conversion need Building Regulations approval?

    Yes. Turning a garage into a habitable room triggers insulation, ventilation, escape and alarm requirements, which we draw in the technical set.

    What happens to the garage door opening?

    It is normally replaced with a wall and a window in materials similar to the house. We show the new front elevation so you can approve it before building.

    What if the council wants changes?

    We redraw at no charge until approval, though we cannot promise any decision.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.