Plumbing and drainage drawings in London

Plumbing and drainage drawings show where water comes in, where it is heated and where waste and rainwater leave a house. We draw them for London extensions, conversions and small new builds, with the falls, pipe sizes and sewer connections that building control and the water company need to see. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    House extension under construction with scaffolding, new glazed doors and building materials

    What plumbing and drainage drawings show

    Two networks meet in every house. Supply pipes bring cold water in and carry hot water to taps, showers and baths. Drains take foul water from toilets, basins and kitchens, and surface water from roofs and paving, to a public sewer or a soakaway.

    Our set draws both on the plans: pipe routes, stopcock and cylinder positions, soil stacks, inspection chambers, gully positions and the run to the sewer, each labelled with size and fall. A drainage plan is often the sheet an extension needs most, because building over or near an existing drain is where projects stall.

    The drawings sit inside our building services design work and share the model with M&E drawings, so a soil pipe never ends up inside a wall that was drawn thinner.

    Brick house being extended, with a wide new opening supported over the ground floor

    Drain gradients: the numbers that make waste flow

    Approved Document H gives minimum falls for foul drains. A one-hundred-millimetre pipe carrying under one litre per second of peak flow can run at 1 in 40, and when peak flow is above that the guidance allows 1 in 80 (minimum 1 WC). A seventy-five-millimetre pipe allows 1 in 80 above one litre per second.

    Larger pipes are shallower still: a one-hundred-and-fifty-millimetre drain can be laid at 1 in 150 (minimum 5 WCs). Any minimum number of fittings stated is part of the rule, because a flat fall with too little flow leaves solids behind.

    We check each run against these figures on the section as well as the plan. In a London terrace with a shallow existing drain, the fall is often the limit on where a new bathroom can go.

    Building over or near a drain

    Many extension drainage questions start with one. The building-over requirement of Approved Document H covers building over or close to public sewers and lateral drains, and its distances are specific. The guidance looks at work within 3 metres of the centreline of a drain.

    A pipe passing under a building should not run more than 6 metres beneath it. Building over is not advised where the drain is deeper than 3 metres, or where the pipe is larger than 225 millimetres across.

    In a built-over case the water company usually has to agree, and the foundations are designed around the pipe. The drawing marks the drain, the offset to the new walls and the protection proposed. If the foundations are involved, our structural engineering service coordinates with the drainage layout.

    Connections, sewers and who owns what

    Since the transfer date of 2011-10-01 (year, month, day), many sewers that once belonged to groups of houses have been owned by the water company. That changes who you ask when a shared drain is affected, so we confirm ownership early.

    Under section 106 of the Water Industry Act 1991, the sewerage undertaker has 21 days to respond to a notice of a proposed connection. Section 185 of the same Act deals with moving pipes: Duty on the sewerage undertaker to move or alter its pipe or apparatus on notice from a person with an interest in the land.

    These are statutory periods and duties, not promises about any one water company. We prepare the connection plan, and you or your contractor submit the application.

    Hot and cold water: efficiency and safety limits

    Regulation 36 sets a calculated water use for new dwellings. The standard is 125 litres per person per day, and 110 where the optional requirement applies. We pick taps, showers and cisterns to hit the figure and record the calculation.

    Once the work is complete, the person carrying it out must tell the building control body the resulting consumption within 5 days.

    The bath outlet is limited to 48 degrees Celsius, and the schematic shows the control that achieves it.

    Party walls and excavation near neighbours

    New drains and foundations can trigger the Party Wall etc. Act 1996 when they dig close to a neighbour's building. Section 6 applies if excavation is within 3 metres of a neighbouring structure and deeper than its foundations, or within 6 metres where a line at 45 degrees from the foundation crosses the new work.

    Notice must be served at least 1 month before the work starts. Our party wall notices service covers the paperwork, and the drainage drawing gives the surveyor the depths and distances.

    Price, scope and how the sheets are checked

    We do not publish a starting price for plumbing and drainage drawings. A bathroom move and a new-build drainage layout are very different jobs, so we run a free constraints check and send a fixed quote.

    We design and draw. We do not install, pressure-test or certify, and we do not replace the plumber's or groundworker's sizing where a specialist system needs it.

    A second technologist checks the sheets, and a senior review signs them off before they join the construction drawings package.

    Plumbing and drainage drawings by borough

    Ground conditions, flood risk and sewer ownership vary across London, and so do the designations that limit external pipework such as soil stacks on a front elevation. Our council pages set out the local figures for each borough.

    Start with the borough where the house stands. Architectural drawings in Croydon shows the format, and architectural drawings by area lists every place we cover.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    AD H (2015) para 2.34 and Table 6, PDF p.18 (printed p.16)1 in 40—gov.uk
    AD H (2015) para 2.34 and Table 6, PDF p.18 (printed p.16)1 in 80 (minimum 1 WC)—gov.uk
    AD H (2015) para 2.34 and Table 6, PDF p.18 (printed p.16)1 in 80—gov.uk
    AD H (2015) para 2.34 and Table 6, PDF p.18 (printed p.16)1 in 150 (minimum 5 WCs)—gov.uk
    AD H (2015) Requirement H4 paras 0.1, 1.5 and 1.6, PDF pp.50-513 m—gov.uk
    AD H (2015) Requirement H4 paras 0.1, 1.5 and 1.6, PDF pp.50-516 m—gov.uk
    AD H (2015) Requirement H4 paras 0.1, 1.5 and 1.6, PDF pp.50-513 m—gov.uk
    AD H (2015) Requirement H4 paras 0.1, 1.5 and 1.6, PDF pp.50-51225 m—gov.uk
    Water Industry Act 1991 s.106(3)-(4); AD H (2015) para C.7, PDF p.2921 days—legislation.gov.uk
    Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011 (SI 2011/1566) reg.3(8)(a)2011-10-01—legislation.gov.uk
    Building Regulations 2010 reg.36(1)-(3); AD G (2015 incl 2016 and 2024 amendments) Requirement G2 and reg.36, PDF p.17125 litres per person per day—legislation.gov.uk
    Building Regulations 2010 reg.36(1)-(3); AD G (2015 incl 2016 and 2024 amendments) Requirement G2 and reg.36, PDF p.17110 litres per person per day—legislation.gov.uk
    Building Regulations 2010 reg.37(1) and (2)(b); AD G para 2.13, PDF p.195 days—legislation.gov.uk
    AD G (2015 incl 2016 and 2024) para 3.65, PDF p.2848 degC—gov.uk
    Party Wall etc. Act 1996 s.6(1)3 m—legislation.gov.uk
    Party Wall etc. Act 1996 s.6(2)6 m—legislation.gov.uk
    Party Wall etc. Act 1996 s.6(5)1 months—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    What are plumbing and drainage drawings?

    They are plans and schematics showing water supply pipes, hot water equipment, soil stacks, drains, chambers and the connection to the sewer, with sizes and falls.

    How much do plumbing and drainage drawings cost?

    Fixed quote after a free constraints check. The cost depends on how much of the plumbing and drainage is changing.

    Can I build an extension over a drain?

    Sometimes. Approved Document H sets limits on depth and pipe size, and the water company usually has to agree to building over a public sewer. The drawing shows the proposal for that discussion.

    What is the water efficiency standard for a new home?

    The standard is 125 litres per person per day, or 110 where the optional requirement applies.

    Do you do the plumbing work?

    No. We design and draw. A qualified plumber or drainage contractor installs and tests the system.

    Sources and dates