020 7864 7245Request a fixed quote

Barnet, London

Building regulations drawings in Barnet

Building regulations drawings for a Barnet home start at £845 including VAT. Barnet has 718 tree preservation orders and 651 listed entries, and both reach the construction details long before building control sees them.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    House extension under construction with scaffolding, new glazed doors and building materials

    Building regulations drawings in Barnet: how the council's guidance feeds them

    We found no Barnet rule aimed at building regulations drawings, because Building Regulations are national. What Barnet does publish is planning guidance, and the Sustainable Design and Development Guidance SPD, Part 4: Guidance on residential extensions and alterations is the document that fixes the outside of a typical home extension before our drawings begin.

    Our work starts once that outline is agreed. The planning drawings settle the footprint, the roof and the materials. The building regulations drawings take those decisions and show how they are built: the foundation depth, the beam over the opening, the insulation in the wall and the fall of the drain. The council's local plan, the Barnet Local Plan 2021-2036, sets the wider policy, but your set is judged against the regulations, not the plan.

    Where the planning approval carries conditions, we carry them into the specification word for word. A materials condition, for example, becomes a line in the schedule, so the builder works to what was approved.

    Brick house being extended, with a wide new opening supported over the ground floor

    Local figures for Barnet

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas16 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions15 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries651 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Tree preservation orders718 tree preservation orders published by the council—planning.data.gov.uk
    Tree preservation zones3,219 tree preservation zone polygons published by the council—planning.data.gov.uk
    Householder decisions1,361 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk
    Building Regulations 2010 reg 16(1)Give notice of intention to start; work may start 2 days after the notice—legislation.gov.uk
    Building Regulations 2010 reg 16(3C)Notify commencement within 5 days after work is regarded as commenced days—legislation.gov.uk
    Building Regulations 2010 reg 16(4)Notify completion within 5 days of completing the work days—legislation.gov.uk
    Building Regulations 2010 reg 46A(3)-(4)Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Barnet
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Trees, roots and foundations in Barnet

    The council records 718 tree preservation orders and 3,219 tree preservation zones. A tree near a new extension affects the foundation, since roots take water from clay soil and the depth of the foundation has to allow for that. It affects the planning side too, because protected trees limit what may be cut or dug.

    So we ask early about trees on or beside your plot, ours and the neighbour's. The engineer sizes the foundations with them in mind, and the drawings show the depth, the compressible fill where needed and the trench position against the root zone. It is a small question at survey stage and an expensive one if it surfaces on site.

    Listed houses and conservation areas in Barnet

    Barnet has 16 conservation areas and 15 Article 4 directions, and Historic England lists 651 entries inside the borough. A listed house needs listed building consent for most changes, and that consent is separate from both planning permission and Building Regulations.

    For these houses we draft the regulations package with the least intrusive solutions in view: insulation that does not hide original features, structural openings that keep original walls where possible, and fire protection that avoids new partitions across historic rooms. Building control can sometimes accept a reasoned alternative where the standard fix would harm the building, and we record the reasoning in the drawing notes.

    Notices and timings once the drawings are in

    A full plans application is decided within a set period: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Before work starts, Give notice of intention to start; work may start 2 days after the notice.

    During the job, Notify commencement within 5 days after work is regarded as commenced. At the end, Notify completion within 5 days of completing the work. We list each of these in the handover pack, so your builder has the dates in one place.

    How Barnet decides householder applications

    Barnet decided 1,361 householder applications in its latest published year and granted 80.2 per cent. 95.1 per cent were decided within eight weeks or an agreed extension.

    These are planning figures for a busy borough, and they do not measure building control. We note them because the planning decision starts the regulations work, so the timing record helps us plan, without promising any date.

    The drawing set and its price

    A Barnet set has foundation and ground-floor plans, upper floor and roof plans, structural and construction sections, drainage and a full specification, coordinated with the engineer. Building regulations drawings start at £845, VAT included, fixed before you commit.

    A second chartered technologist checks every sheet before submission. If the council asks for changes, we redraw at no charge until approval. Approval lapses if work does not commence, and for an extension the rule is that Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application.

    Where a project combines a ground-floor extension with a loft, we draw both in one coordinated set when you ask. The steel that carries the new loft floor then lines up with the beams below it, and the stair, the fire protection and the insulation are shown once, in one place, instead of being repeated in two packages that can drift apart.

    Other services in Barnet and neighbouring boroughs

    Before this stage you may need planning drawings in Barnet or a Lawful Development Certificate in Barnet. For the next stage, see construction drawings in Barnet and SAP calculations in Barnet.

    The whole borough is covered at architectural drawings in Barnet. Neighbouring councils with the same service include Hertsmere, Enfield and Camden.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does Barnet have its own building regulations rules?

    No, Building Regulations are national. Barnet's published guidance is about planning. Our drawings follow the planning approval and then show the construction behind it.

    Do protected trees affect building regulations drawings in Barnet?

    They can. A tree near an extension changes the foundation depth the engineer specifies, and protected trees limit what may be cut or dug. Tell us about trees on and beside the plot.

    How long does building control take to decide a full plans application?

    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing.

    How much do building regulations drawings cost in Barnet?

    From £845 including VAT, fixed up front. Building control charges are separate.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.