A party wall notice is the written warning the Party Wall etc. Act 1996 requires you to give a neighbour before certain building work near a shared wall or boundary. We prepare and issue the notices, with drawings that show the work, from £45 per adjoining owner including VAT, so your start date is not lost to paperwork.

From £45 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    House extension under construction with scaffolding, new glazed doors and building materials

    When you must serve a party wall notice

    The Act is separate from planning permission and Building Regulations, and having one does not remove the need for the other. It applies when you build on or at a boundary, cut into a shared wall, or dig close to a neighbour's foundations. Typical London triggers are a loft conversion that bears on the party wall, a rear or side extension whose flank wall meets the boundary, and a basement or deep foundation.

    Three kinds of work are covered. A new wall built up to or astride the boundary needs a line-of-junction notice. Work to an existing shared wall or floor, such as inserting steel beams or raising the wall, needs a party structure notice. Excavation near a neighbour needs an adjacent excavation notice.

    A neighbour for this purpose means any adjoining owner, so a terrace of three can mean notices to both sides. In a block of flats the freeholder and sometimes other leaseholders count, which is why we ask for the title details before quoting.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    How much notice the Act requires

    The periods are fixed in the Act. A line-of-junction notice must reach the neighbour at least 1 month before the work. A party structure notice needs at least 2 months. An excavation notice needs 1 month.

    Excavation has its own geometry. A notice is needed where you dig within 3 metres of a neighbouring building and deeper than its foundations, or within 6 metres where the dig cuts a 45° line drawn down from the neighbour's foundations. Our drawings show those lines, because that is the only way to know whether the rule bites.

    Count back from the day you want to start, not forward from the day you decide. A neighbour's silence is not consent, and a builder booked for a date cannot move a statutory period.

    What happens after the neighbour receives it

    The neighbour has three choices. They can consent in writing and the work goes ahead. They can serve a counter-notice, which for a party structure notice must be done within 1 month, asking for additional works to protect their own property. Or they can do nothing.

    Doing nothing is treated as a dispute once 14 days have passed without consent. The Act then provides for surveyors to settle terms in a written award, and an award can be appealed to the county court within 14 days of service. If a neighbour does not name a surveyor within 10 days of being asked, the Act lets the building owner appoint one on their behalf.

    TODO (owner): confirm whether the practice recommends or appoints party wall surveyors, and the wording to use here

    Whichever route applies, a clear set of drawings and a method statement shortens the negotiation, which is why we always attach them.

    Timing, lapse and rights of entry

    A served notice does not last for ever: it lapses if the work has not begun within 12 months of service. If planning is slow, serve later rather than earlier, or you will be doing it twice.

    The Act also gives you a right to enter the neighbour's land where that is needed to do the work, on proper warning. The rule reads: At least 14 days' notice of entry for works (except emergencies). Plan the access with your builder so that the warning is given in good time.

    None of this replaces the other consents. Your planning drawings go to the council, and your building regulations drawings go to building control. Party wall notices go to neighbours. Run the three in parallel and the programme stays short.

    What our notice service includes and what it costs

    A notice costs £45 per adjoining owner, VAT included. We draft it to the format the Act expects, attach the drawings that show the work and its position against the boundary, and issue it. You tell us who the adjoining owners are, or we help trace them from the title.

    We keep a record of service dates, because the dates are what prove you started lawfully. If a neighbour responds, we log the reply and tell you what it means and what your options are. The fee covers the notices only. Surveyors' fees under an award, where there is a dispute, are separate and are set under the Act, not by us.

    Common mistakes we see

    A common mistake is assuming a friendly neighbour makes the notice unnecessary. Goodwill does not end a lawful obligation, and a future owner may not be as relaxed. The second is serving at the wrong address or on the wrong person, particularly with leasehold flats.

    A third is notice that does not describe the work, so the neighbour cannot judge the risk. We prevent that with sections and plans. The fourth is starting early: excavating a week before the period ends, because the builder arrived early. Treat the start date as fixed by the Act.

    If you are also adding a loft or an extension, see our loft conversion drawings page, since both can need a notice. The official explanation is the Party walls and building work (GOV.UK guide, updated 17 Oct 2024), which we are happy to talk through with you.

    Party wall advice for your borough

    The Act is the same across England, but the buildings are not. A Victorian terrace has shared chimney breasts and thin party walls, while an interwar semi has a single leaf. Our council pages describe the housing mix and conservation controls behind these differences. Start with Camden's planning facts, or see every borough under architectural drawings by area.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Party Wall etc. Act 1996 s1(2)Line-of-junction (new wall) notice at least 1 month before work—legislation.gov.uk
    Party Wall etc. Act 1996 s3(2)(a)Party structure notice at least 2 months before work—legislation.gov.uk
    Party Wall etc. Act 1996 s4(2)Adjoining owner may serve a counter-notice within 1 month of a party structure notice—legislation.gov.uk
    Party Wall etc. Act 1996 s6(1), s6(2), s6(5)Adjacent excavation notice at least 1 month before work: within 3 m and deeper than the neighbour's foundations, or within 6 m and cutting a 45° line from their foundations—legislation.gov.uk
    Party Wall etc. Act 1996 s5, s6(7)A dispute arises if the adjoining owner does not consent within 14 days of the notice days—legislation.gov.uk
    Party Wall etc. Act 1996 s3(2)(b), s6(8)Notice lapses if work has not begun within 12 months of service months—legislation.gov.uk
    Party Wall etc. Act 1996 s8(3)-(4)At least 14 days' notice of entry for works (except emergencies) days—legislation.gov.uk
    Party Wall etc. Act 1996 s10(17)Appeal to the county court within 14 days of service of an award days—legislation.gov.uk
    GOV.UKParty walls and building work (GOV.UK guide, updated 17 Oct 2024)—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Loft plan marked up by a second technologist during an independent review
    Sample drawing. Independent review: a loft plan marked up by the second technologist before submission.
    Two-storey rear extension under construction on a semi-detached house
    Under the loupe
    Drag the loupe across the sheet.

    Questions

    Do I need a party wall notice for a loft conversion?

    Often yes. Cutting into a shared wall, or putting steel beams in it, is work to a party structure and needs notice at least 2 months before it starts.

    How much does a party wall notice cost?

    Our notices cost £45 per adjoining owner, VAT included. Surveyors' fees, if a dispute needs an award, are separate.

    What if my neighbour does not reply?

    The Act treats it as a dispute after 14 days without consent. You cannot treat silence as agreement, and the process then moves to surveyors.

    How long is a notice valid?

    A notice lapses if work has not begun within 12 months of service, so time it with your building programme.

    Is a party wall notice the same as planning permission?

    No. Planning permission comes from the council, and the Act's notices go to your neighbours. One does not replace the other.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.