Hillingdon, London
Building regulations drawings in Hillingdon
Building regulations drawings in Hillingdon start at £845 including VAT. In a borough where 731 tree preservation orders the drawings often have to show foundations, drains and structure that suit a plot full of roots.
From £845 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

Trees, Article 4 and what the drawings add in Hillingdon
Hillingdon records 731 tree preservation orders, 150 Article 4 directions and 33 conservation areas, and Historic England lists 436 entries. Each of these is a planning layer. A protected tree can limit where an extension goes. An Article 4 area can remove permitted rights. Neither one tells you how deep the foundation must be.
That is the Building Regulations question, and in Hillingdon the trees are often the answer. Where the ground is clay, roots draw water from it, and the soil shrinks in dry summers and swells in wet winters. A foundation too shallow beside a mature tree can move with the soil and crack the wall above. The depth depends on the tree species, its distance and the soil, and your engineer sets it. We draw it, label it and carry it through the sections.
Where a tree is protected, the technical set has to respect its roots as well as the building line. Tell us about every tree within the garden, and we record it on the survey.

Local figures for Hillingdon
| Measure | Value | Period | Source |
|---|---|---|---|
| Tree preservation orders | 731 tree preservation orders published by the council | — | planning.data.gov.uk |
| Article 4 directions | 150 Article 4 directions published by the council | — | planning.data.gov.uk |
| Conservation areas | 33 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 436 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Households living in a house | 68.9 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder decisions | 1,147 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 90.2 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 94.3 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Borough CIL residential rate | £160.43/m² (Residential dwelling houses C3, borough-wide) | 2026 indexed rate as printed; schedule rate £95/m² (index 237 to 400) | pre.hillingdon.gov.uk |
| Mayoral CIL rate (indexed) | 72.73 £/m² (indexed, permissions granted in 2026) | — | london.gov.uk |
| Building Regulations 2010 reg 14A(6) | Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing | — | legislation.gov.uk |
| Building Regulations 2010 reg 16(1) | Give notice of intention to start; work may start 2 days after the notice | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Foundations, drains and the order of work
Deep foundations affect more than the wall. Drains that run through shrinkable ground need flexible joints and falls that allow for movement. New trenches must avoid the protected root zone, which can mean moving a soakaway or a manhole. We draw the drainage on the plan with connections, falls and cover levels, so the builder does not have to guess on site.
Because a protected tree can restrict how the trenches are dug, we recommend settling the foundation and drainage design before the builder is chosen. Two quotes for the same drawing are comparable. Two quotes for a vague plan are not.
A short note on boundaries: a drain or foundation placed close to a neighbour's tree can affect their property, not only yours. Where that is likely, we say so on the drawing and flag the need for a conversation with the neighbour before digging starts.
Large houses, large extensions
Hillingdon is a borough of houses: 68.9 per cent of households live in one, and 56.6 per cent own their home. Where the plot allows, owners add a long rear extension, a side addition or a detached outbuilding with a bedroom.
Any of these can pass through the usual checks: structure, fire safety, ventilation, energy and drainage. A detached outbuilding used as a bedroom or office sits in a different category, because its distance from the boundary affects fire rules for the wall and roof. We confirm which category your build falls into before drawing, then show the right construction. Where the work needs an engineer, our structural engineering in Hillingdon service coordinates the two.
Energy is the other thing a big house changes. A larger extension has more glazing, more roof and a bigger heated volume, and the energy rules ask for a wall, floor and roof that perform together. We show the insulation in each element, the junctions where cold bridges form and the glazing type, and where a home energy rating is needed, the SAP assessor checks that the whole design passes.
Timings and notices
Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. On the planning side, Hillingdon decided 1,147 householder applications in its latest year, granted 90.2 per cent and decided 94.3 per cent on time.
After approval, the rule is: Give notice of intention to start; work may start 2 days after the notice. Notify completion within 5 days of completing the work. We list both on the handover sheet, with the commencement rule for an extension, so the approval does not lapse because of a start that never quite counted.
Prices, checking and levy
Building regulations drawings start at £845 with VAT included. A second chartered technologist checks every sheet, and if the examiner raises points we revise at no extra charge.
Hillingdon's levy is a single borough-wide residential rate of £160.43/m² (Residential dwelling houses C3, borough-wide) under its London Borough of Hillingdon CIL Charging Schedule (adopted 10 July 2014), together with the Mayor's scheme at £72.73 per square metre in band 2. A terraced house averages £457,686 here. We flag the levy in the handover pack so it is never a surprise after the build.
Related services and neighbouring boroughs
Sheets for site use are covered in construction drawings in Hillingdon, and the home's energy rating is handled by SAP calculations in Hillingdon. If you need consent first, start at planning drawings in Hillingdon, or read architectural drawings in Hillingdon. Nearby, the service is also described for Hounslow, Harrow and Slough.
What you receive


Related pages
Other services in Hillingdon
Building regulations drawings nearby
Questions
Does a tree preservation order change the Building Regulations?
Not directly, but the tree affects foundation depth and drain routes, which are Building Regulations matters. A protected tree can also limit where you may dig.
Do I need approval for a detached garden room in Hillingdon?
It depends on its size and use. A sleeping room or a larger building usually needs approval, and its distance from the boundary affects fire rules.
How long does building control take to decide?
Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Build in some slack.
How much do building regulations drawings cost in Hillingdon?
From £845 including VAT, fixed up front. Building control charges are separate.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- pre.hillingdon.gov.uk, retrieved
- london.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- pre.hillingdon.gov.uk, retrieved
- london.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.