Structural calculations show that the beams, lintels, padstones and walls in your project are strong enough, and building control will ask for them. The fee opens at £295, VAT included, for London homes, with the figures matched to the drawings so the builder and the examiner read the same numbers.

From £295 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    What structural calculations cover

    Any opening you knock through a load-bearing wall needs a beam. Any loft conversion changes the loads on the floor below. Any extension adds a new foundation and roof. Structural calculations are the engineer's working that proves each element carries its load.

    The output is a set of calculations and a sketch layout, giving each beam's size and grade, the padstones under it and the temporary support to use while it goes in. Building control reads them alongside the drawings.

    They are not optional extras. The structure is the part of a building where an error costs most, and the Building Regulations require the design to be done by a competent person.

    Brick house being extended, with a wide new opening supported over the ground floor

    The rules behind the numbers

    The relevant guidance is Approved Document A, which covers structure. It gives simple rules for common cases. For masonry walls in residential buildings of not more than three storeys, its wall-thickness rules apply. For floors supported by a wall, the simple rules cover a span of up to 6 metres between bearing centres.

    Beyond the simple rules, calculation is the route. That means checking each member for bending, shear and deflection, and the bearing it sits on. The figures in the table show the scope and the limits we work to.

    The design also has to resist disproportionate collapse, which sets how much robustness is needed.

    The calculation also records the loads assumed for floors, roof and finishes, so a later change of roof covering can be tested against the original design.

    Where a calculation is most often needed

    Three jobs come up again and again: removing a chimney breast or a wall between rooms, forming a wide opening in a rear extension, and converting a loft. Each needs a beam or a new floor structure, and each needs the existing walls checked for the extra load.

    In a loft the floor joists are rarely big enough for habitable use, so new joists or steel are designed. In a rear extension the large glazed opening is carried by a beam, and its end bearings carry point loads down to the foundation.

    We pick these up in the survey, noting wall thicknesses and what is above and below each opening, so the calculation starts from facts instead of assumptions.

    Existing walls matter as much as the new beam. We record whether a wall is solid brick or cavity, its thickness and any chimney stack above, because those details decide the loads that reach each bearing.

    How our structural service works

    We prepare the architectural drawings, set out the structural intent and coordinate the calculations with a structural engineer, so the structure is designed alongside the building rather than added after. The beams on our sheets are the beams in the calculation.

    A change to an opening is made once in the Revit model and flows to every sheet. A technologist who did not draft it checks the set before it goes to building control, and the engineer's output is checked against it.

    Our building regulations drawings use the calculations directly, and the complete package covers planning, building regulations and structural together.

    Party walls and excavation near neighbours

    Structural work often touches the boundary. Under the Party Wall etc. Act 1996 you must serve an adjacent excavation notice at least one month before work if you dig within a set distance of a neighbour's building and deeper than their foundations. The exact tests are in the table.

    Our party wall notices service prepares the notices and the drawings that go with them. Serving them early avoids a dispute that stops the build.

    If your project needs more than calculations, such as engineered design for a basement or a complex frame, our structural engineering page describes that wider service.

    Price and what you receive

    Structural calculations start at £295 including VAT, as a fixed fee confirmed after the constraints check. Larger or more complex structures are quoted from the same price list.

    You receive the calculations, the beam and padstone schedule and a layout drawing. Expect the package roughly a week after the survey; if building control wants changes, we revise at no extra charge.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    AD A title pageApproved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments—gov.uk
    AD A para 2.1, Section 2CSection 2C wall-thickness rules cover residential buildings of not more than three storeys—gov.uk
    AD A para 2C23: max span of a floor supported by a wall, centre to centre of bearing6 m—gov.uk
    AD A Section 5, Table 11Houses not exceeding 4 storeys are Consequence Class 1 for disproportionate collapse—gov.uk
    Party Wall etc. Act 1996 s6(1), s6(2), s6(5)Adjacent excavation notice at least 1 month before work: within 3 m and deeper than the neighbour's foundations, or within 6 m and cutting a 45° line from their foundations—legislation.gov.uk
    Building Regulations 2010 reg 11FDesign work must be done by a competent person—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    House extension under construction with scaffolding, new glazed doors and building materials
    Load take-down
    Brush across the bars.

    Questions

    Do I need structural calculations for a beam?

    Yes. Building control normally asks for calculations for any new beam or opening in a load-bearing wall, and the design must be done by a competent person.

    How much do structural calculations cost?

    Pricing begins at £295 including VAT, set in advance.

    What does Approved Document A cover?

    It is the government's practical guidance on structure for the Building Regulations. It gives simple rules for common cases and points to calculation for the rest.

    Do I need a party wall notice for new foundations?

    Possibly. An adjacent excavation notice is needed at least one month before work if you dig close to a neighbour's building and deeper than their foundations. We check this on the survey.

    Who does the calculations?

    We coordinate them with a structural engineer and check them against our drawings, so one set of numbers runs through every sheet.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.