020 7864 7245Request a fixed quote

Building regulations

Structural engineering in London

Structural engineering is the design that makes a building stand up: the beams, padstones, foundations and walls that carry loads safely when you open up a house or add to it. We provide it for London extensions, loft conversions and basements, coordinated with the architectural drawings. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on structural engineering

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    When a home project needs a structural engineer

    A project that changes how a house carries its weight needs structural design. Taking out a wall between kitchen and dining room, widening a rear opening for bifold doors, adding a floor or digging a basement all fall in this category. Even a simple loft conversion changes the loads on the floor and the walls below it.

    The Building Regulations leave a small gap for the very simplest cases. Approved Document A includes simplified rules for ordinary houses of up to 3 storeys, but they apply only inside its tables. The guidance itself says when you must go beyond them: Where the work falls outside the AD A Section 2 tables, or uses beams, steelwork, underpinning or removed load-bearing walls and chimney breasts.

    A useful rule of thumb: if the work removes support or adds load, someone has to calculate it. We would rather tell you at the first call than have a building control officer ask for it after the plans are submitted.

    House extension under construction with scaffolding, new glazed doors and building materials

    What the structural design includes

    A typical package has four parts. Calculations prove that each beam, lintel and foundation is strong enough. Drawings show them: beam positions, sizes, bearing details, padstones and temporary works notes. A specification names the steel grade and concrete mix. And a coordination check confirms that the structure fits in the ceiling depths, wall thicknesses and floor build-ups the architectural set shows.

    That last step is where separate firms can trip. A beam that works on paper but is deeper than the ceiling void has to be redesigned, often once a builder is standing under it. We model structure and architecture together, so the clash shows up on screen, not on site.

    Our structural calculations service covers the calculation package on its own, for cases where the drawings are already settled. The engineering page you are reading covers the wider design, including foundations, underpinning and larger alterations.

    The regulations behind it, in plain English

    Part A of Schedule 1 to the Building Regulations has three requirements. The first deals with loading: A1(1): the building shall be constructed so that the combined dead, imposed and wind loads are sustained and transmitted by it to the ground (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building. A1(2): regard shall be had to the imposed and wind loads to which it is likely to be subjected in the ordinary course of its use for the purpose for which it is intended.. The second deals with ground movement and the third with disproportionate collapse, so they are summarised in the guidance as A1 loading; A2 ground movement; A3 disproportionate collapse.

    The adopted guidance dates from the 2004 edition incorporating 2004, 2010 and 2013 amendments, and it points designers to the Eurocodes: AD A names BS EN 1990 to BS EN 1999 (Eurocodes 0 to 9, including EN 1991-1-7 on accidental actions) with their UK National Annexes, and PD 6688-1-7, PD 6687-1, PD 6693-1 and PD 6697, as the structural design standards; BS 8103-1, -2 and -3 cover low-rise housing foundations, masonry and timber floors and roofs. Calculations are done to those standards, which is why they cannot be copied from a neighbour's job.

    Roof work has a trigger of its own. The guidance sets a threshold of 15 per cent for an increase in roof load before the supporting structure must be checked. The simplified rules also cap the load on a wall at 70 kN/m, and a floor may span no more than 6 metres onto it.

    Lofts, extensions and basements: different structural problems

    A loft conversion usually means new steel across the house, with the floor joists strengthened and the roof structure altered. Permitted development limits the added volume: Class B loft enlargement: resulting roof space must not exceed the original by more than 40 m3 (terrace house) or 50 m3 (any other case); no part may exceed the height of the highest part of the existing roof or extend beyond the principal roof plane fronting a highway; original eaves maintained or reinstated and the enlargement, so far as practicable, at least 0.2 m from the eaves along the slope; no part beyond the outside face of any external wall of the original dwellinghouse (except hip-to-gable or joining to a rear or side extension). Our loft conversion drawings service pairs the design with the planning route.

    A rear or side extension is mainly about the opening in the old wall, the new foundation and where the roof loads end up. Soil, nearby trees and drains decide how deep the foundation goes, so the survey and trial pits come before the final design.

    A basement is the most demanding job. It involves underpinning or a new retained box, groundwater, temporary propping and neighbours. Check our basement impact assessment page, as some councils ask for one before they decide.

    Neighbours, party walls and building control

    Structural work often touches a shared wall, and that triggers the Party Wall etc. Act 1996. A party structure notice must be served at least 2 months ahead, and an excavation near a neighbour's foundations needs 1 month's notice. Our party wall notices service handles the paperwork, using the structural drawings as the attachment.

    Building control then checks the design. Full plans applications are decided within 5 weeks under the current regulations, and the regulations require notice 2 days before starting on site. A building notice route lapses after 3 years if not progressed. Structural drawings are the usual first thing an inspector asks to see.

    Designers also have personal duties: Reg 11F: any person carrying out design work must have the skills, knowledge, experience and behaviours (or organisational capability) to carry out the design work so that the building work, if built, would accord with all relevant requirements. Reg 11K(2): a designer must take all reasonable steps to ensure the design, if built, would comply with all relevant requirements.. That is a further reason to use a competent firm for structural design and not a builder's guess.

    How the quote works

    We do not publish a starting price for structural engineering, because a single steel beam and a basement are not the same job. We run a free constraints check first, ask for photographs and any existing drawings, and then give a fixed quote.

    TODO (owner): confirm the engineer's credentials (for example CEng, MIStructE) and whether structural design is delivered in-house or through a partner

    The words structural engineer are not a legally protected title, according to the Engineering Council, so it is reasonable to ask anyone you instruct what qualification they hold.

    Structural engineering by borough

    Ground, housing stock and conservation rules vary a great deal across London. London clay under a terrace in one borough is a different problem from a sloping site in another. Our council pages set out the local designations that decide how structural work can be seen from the street. Start with Camden's planning facts, or browse architectural drawings by area.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    AD A 'Main changes' and p.52004 edition incorporating 2004, 2010 and 2013 amendments—gov.uk
    AD A Requirements A1-A3, PDF pp.7 and 43A1 loading; A2 ground movement; A3 disproportionate collapse—gov.uk
    AD A para 2C1(a), PDF p.153 storeys—gov.uk
    AD A paras 4.3-4.4, PDF p.4215 %—gov.uk
    AD A para 2C24(c)70 kN/m—gov.uk
    AD A para 2C236 m—gov.uk
    AD A paras 0.1-0.2, PDF p.8, and 2C3, PDF p.15Where the work falls outside the AD A Section 2 tables, or uses beams, steelwork, underpinning or removed load-bearing walls and chimney breasts—gov.uk
    GPDO 2015 Sch 2 Part 1 Class B, paras B.1(b)-(d), B.2(b)Class B loft enlargement: resulting roof space must not exceed the original by more than 40 m3 (terrace house) or 50 m3 (any other case); no part may exceed the height of the highest part of the existing roof or extend beyond the principal roof plane fronting a highway; original eaves maintained or reinstated and the enlargement, so far as practicable, at least 0.2 m from the eaves along the slope; no part beyond the outside face of any external wall of the original dwellinghouse (except hip-to-gable or joining to a rear or side extension)—legislation.gov.uk
    Party Wall etc. Act 1996 s.3(2)(a) (party structure notice for s.2 work)2 months—legislation.gov.uk
    Party Wall etc. Act 1996 s.6(5)1 months—legislation.gov.uk
    Building Regulations 2010 reg 14A(6), in force in England from 1 Oct 2023 (SI 2023/911)5 weeks—legislation.gov.uk
    Building Regulations 2010 reg 16(1) and (3C)2 days—legislation.gov.uk
    Building Regulations 2010 reg 13(5)3 years—legislation.gov.uk
    AD A 'Standards referred to' list and para 5.2AD A names BS EN 1990 to BS EN 1999 (Eurocodes 0 to 9, including EN 1991-1-7 on accidental actions) with their UK National Annexes, and PD 6688-1-7, PD 6687-1, PD 6693-1 and PD 6697, as the structural design standards; BS 8103-1, -2 and -3 cover low-rise housing foundations, masonry and timber floors and roofs—gov.uk
    Building Regulations 2010 Part 2A regs 11F(1)-(2) and 11K(2)-(4)Reg 11F: any person carrying out design work must have the skills, knowledge, experience and behaviours (or organisational capability) to carry out the design work so that the building work, if built, would accord with all relevant requirements. Reg 11K(2): a designer must take all reasonable steps to ensure the design, if built, would comply with all relevant requirements.—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Load take-down
    Brush across the bars.

    Questions

    Do I need a structural engineer to remove a wall?

    If the wall carries load, yes. Someone must design the beam and its supports, and building control will ask for the calculations. We check whether the wall is load-bearing as part of the first survey.

    How much does structural engineering cost?

    Fixed quote after a free constraints check. A single beam is far less work than a basement, so we price the job after seeing the house and the plans.

    What is the difference between structural calculations and structural engineering?

    Calculations are the proof that each member is strong enough. Structural engineering is the wider design: foundations, details, specification and coordination with the architecture. Our calculations page covers the first on its own.

    Do I need a party wall notice for structural work?

    Often yes. Work to a shared wall needs a party structure notice at least 2 months before it starts.

    Are the simplified rules enough for a house extension?

    Sometimes, for small alterations that stay inside the guidance tables. The rule is: Where the work falls outside the AD A Section 2 tables, or uses beams, steelwork, underpinning or removed load-bearing walls and chimney breasts.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.