Greenwich, London
Building regulations drawings in Greenwich
Building regulations drawings for a Greenwich home start at £845 including VAT. The borough has listed houses, conservation areas and a World Heritage Site alongside newer homes, and the construction set has to suit yours.
From £845 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

Heritage in Royal Greenwich and what it means for the sheets
Historic England lists 540 buildings in Greenwich: 28 at Grade I, 45 at Grade II* and 466 at Grade II. The council publishes 23 conservation areas, and the borough contains 1 World Heritage Site.
Building Regulations apply in all of them. The energy guidance, however, allows a reasoned approach where full standards would damage the character of an older building, and a listed or protected house is the case it was written for. We set out our reasoning on the sheets, so the building control officer sees why a window, floor or wall departs from the standard specification.
The borough's development plan is the Royal Greenwich Local Plan: Core Strategy with Detailed Policies, adopted in 2,014. That plan governs permission, and the construction set follows the design that is permitted.

Local figures for Greenwich
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 23 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 540 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| worldHeritageSites | 1 World Heritage Sites intersecting the LPA boundary | — | planning.data.gov.uk |
| Households living in a house | 48.4 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder applications granted | 77.1 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Building Regulations 2010 reg 16(3C) | Notify commencement within 5 days after work is regarded as commenced days | — | legislation.gov.uk |
| Building Regulations 2010 reg 11F(1) (Part 2A, from 1 Oct 2023) | Anyone carrying out design or building work must have the skills, knowledge, experience and behaviours (or organisational capability) to do it | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Building regulations drawings in Greenwich: houses and flats
48.4 per cent of Greenwich's 114,052 households live in a house or bungalow, and 41.1 per cent own their home. The rest rent or live in flats, so many of our Greenwich jobs are refurbishments or conversions of an older house rather than a conventional extension.
For those, the drawings concentrate on the points that matter in a divided house: sound and fire separation between floors, a protected escape route, ventilation to new bathrooms and kitchens, and the drainage that serves them. For a classic extension, the weight shifts to foundations, the beam over the opening and the junction with the old wall.
Our construction drawings in Greenwich can add a builder-ready package from the same model.
Keeping the approval and the paperwork alive
Once work starts, a notice follows: Notify commencement within 5 days after work is regarded as commenced. Building control also expects you to say when work is finished. We hand your builder a short list so that nothing is missed.
Responsibility is also written down. Anyone carrying out design or building work must have the skills, knowledge, experience and behaviours (or organisational capability) to do it. We state our own role on the cover sheet, and your builder sees the duties that fall to them.
If the design needs consent first, see planning drawings in Greenwich, or confirm permitted development through a Lawful Development Certificate in Greenwich.
Greenwich's planning record
Greenwich decided 624 householder applications in its latest published year and granted 77.1 per cent, with 94.2 per cent decided in time. Those are planning figures. They help with scheduling the step before the construction set, and they say nothing about a single address.
Older houses, conversions and energy in Greenwich
Where a Greenwich house is older, the energy rules treat old buildings carefully. Part L accepts that a house with solid walls, original sash windows or a historic roof may not reach the thermal values required of new work. The sheets show the improvement that is practical and the reason for any shortfall.
Typical measures are insulation to the roof or loft floor, draught-proofing to windows, secondary glazing where the original windows must stay and insulation to ground floors when they are renewed. We draw each, and record the reason for choosing it.
Conversions bring different issues. When a larger house is divided into flats, Part E needs sound-resisting floors, Part B needs enclosed escape and Part F needs ventilation to every room. The sheets deal with each in turn, and where a floor cannot take extra build-up, they show an alternative.
We also draw damp. Older houses with solid walls need walls that can breathe, and the wrong insulation can trap moisture. The sheets name materials that suit the building, and the specification warns your builder against products that do not.
Price and next steps
Building regulations drawings start at £845 with VAT included, fixed before you commit. A second chartered technologist checks every sheet, and revisions after an examiner's comments carry no charge. Energy calculations come through SAP calculations in Greenwich. For the borough as a whole, see architectural drawings in Greenwich, or compare Lewisham and Bexley.
What you receive


Related pages
Other services in Greenwich
Questions
Does the World Heritage Site change building regulations drawings?
Not directly. It affects planning and consents. The construction set follows whatever design is permitted.
Can a listed Greenwich house meet Building Regulations?
Yes. The regulations apply, and the guidance allows a reasoned approach to energy measures where full standards would harm the building.
What does my builder have to notify?
Notify commencement within 5 days after work is regarded as commenced. We give your builder a list at handover.
How much do building regulations drawings cost in Greenwich?
From £845 including VAT, fixed up front. Building control fees are separate.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- royalgreenwich.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.