020 7131 9703Request a fixed quote
Two-storey rear extension under construction on a semi-detached house

Neighbours and checks

Existing drawings verification for London homes

Existing drawings verification checks old or inherited plans of your building against the evidence before anyone designs on top of them. The desk check is £189; a version with a site visit is listed in our fees. A chartered architectural technologist (MCIAT) does the work. It tells you how far the drawings can be trusted; it is not a full survey.

From £189, no VAT to add

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    The fixed fee for existing drawings verification

    Fixed fee
    from £189
    Total you pay
    from £189

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • Desk check of your existing drawings against the evidence you hold
    • Checks for scale, north point, internal consistency and map date
    • Findings sorted into agrees, conflicts and could not be checked
    • Written report with a recommendation on the next step
    • Done by an MCIAT chartered architectural technologist
    • A site visit version is listed in our fees
    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on existing drawings verification

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote

    Why a drawing you were handed may be wrong

    Plans that come with a purchase, from a previous owner or from an old project show the building as someone intended it, or as it was years ago. Walls move, extensions are added and dimensions are copied wrongly. Every later drawing inherits those errors, and they show up as clashes on site.

    Checking the base drawing first costs little compared with redesigning after the problem is found.

    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    What the desk check does

    We read the drawings against the evidence you hold: photographs, estate agent plans, earlier planning drawings, the council's online records you point us to, and any survey. We look for internal contradictions, such as dimensions that do not add up or a stair that does not fit the floor-to-floor height.

    We report which parts agree with the evidence, which conflict, and which have nothing to check them against. No part is declared accurate without evidence.

    What a council expects of a plan

    Whatever the drawing's history, a plan sent to the council has to meet the basics. The Order says plans "Plans and drawings must be drawn to an identified scale and, in the case of plans, must show the direction of North." Guidance repeats that "Any plans or drawings must be drawn to an identified scale, and in the case of plans, must show the direction of north." Old plans often have a stated scale but no north point, or a scale that no longer matches the print.

    Guidance also says that "Additional plans and drawings will in most cases be necessary to describe the proposed development" and that "A location plan should be based on an up-to-date map." We note where an inherited location plan is based on a map that is out of date.

    When to add a site visit

    A desk check can only compare documents with documents. A version with a site visit adds spot measurements on site, so key dimensions are tested against the building. Its fee is listed in our fees.

    If the drawings are too uncertain to repair, or you need dimensions to build from, a measured building survey is the sounder base. Where the only problem is that the plans exist as a scan, CAD conversion rebuilds them as editable drawings.

    What you get and what happens next

    You get a short written report: what was checked, what agreed, what conflicts, what could not be tested, and our recommendation on the next step. We tell you plainly if we think the drawings should not be used as a base.

    Councils can ask for more than the national minimum, and guidance says that "Requests must be reasonable having regard, in particular, to the nature and scale of the proposed development." If you intend to submit, the next step is usually a planning drawings review of the finished set.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Development Management Procedure Order 2015, article 7(2): scale and north pointPlans and drawings must be drawn to an identified scale and, in the case of plans, must show the direction of North—legislation.gov.uk
    Planning practice guidance, making an application, paragraph 023: scale and northAny plans or drawings must be drawn to an identified scale, and in the case of plans, must show the direction of north—gov.uk
    Planning practice guidance, making an application, paragraph 023: additional plansAdditional plans and drawings will in most cases be necessary to describe the proposed development—gov.uk
    Planning practice guidance, making an application, paragraph 024: location plan baseA location plan should be based on an up-to-date map—gov.uk
    Development Management Procedure Order 2015, article 7(1): other plansAny other plans, drawings and information necessary to describe the development which is the subject of the application—legislation.gov.uk
    Planning practice guidance, making an application, paragraph 040: reasonable requirementsRequests must be reasonable having regard, in particular, to the nature and scale of the proposed development—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Existing drawings verification: the fee in writing before you commit

    From £189, no VAT to add. Send the address and anything you already hold, and we confirm the fixed fee in writing before any work starts.

    Request a fixed quote
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Loft plan marked up by a second technologist during an independent review
    Sample drawing. Independent review: a loft plan marked up by the second technologist before submission.
    House extension under construction with scaffolding, new glazed doors and building materials
    Under the loupe
    Drag the loupe across the sheet.

    Questions

    Does a desk check prove the drawings are accurate?

    No. It shows where they agree with the evidence supplied and where they do not. Only measurement on site can test dimensions.

    What should I send?

    The drawings, plus any photographs, earlier plans, survey or paperwork about the building. The more evidence, the more we can check.

    Can you correct the drawings afterwards?

    Yes, as separate drawing work, quoted in writing first. Where the base is unreliable we will say a survey is the better route.

    Is it enough to apply to the council with?

    It tells you whether the drawings are a safe base. Submitting also needs a complete set that meets your council's list.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.