Hounslow, London
Building regulations drawings in Hounslow
Building regulations drawings in Hounslow start at £845 including VAT. They show building control how an extension, loft or conversion meets the Building Regulations 2010, and where a home is affected by aircraft noise they pay particular attention to how a home is ventilated and glazed when the windows cannot always stay open.
From £845 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

Aircraft noise, heritage and the technical set in Hounslow
Hounslow has 33 conservation areas, Historic England lists 519 entries and 1 World Heritage Site touches its boundary. Planning looks at the heritage side. Building control looks at what happens inside the walls, and for a home affected by aircraft noise that is where noise comes in.
Noise is not a Building Regulations test for an ordinary extension, but it shapes the choices that are. If a new bedroom is subject to aircraft noise, the occupant will want the windows shut at night, and the room then relies on its ventilation system to stay fresh. Part F sets the minimum rates. Part O deals with overheating, which closed windows make more likely on a warm night. Acoustic glazing and a quiet ventilation route can solve both, and we specify them in the technical set when the site calls for it.
Closed windows change the ventilation and overheating design. We ask where the house sits and what the room is for before we draw the window and the vent.

Local figures for Hounslow
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 33 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 519 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Article 4 directions | 3 Article 4 directions published by the council | — | planning.data.gov.uk |
| worldHeritageSites | 1 World Heritage Sites intersecting the LPA boundary | — | planning.data.gov.uk |
| Households living in a house | 54 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder decisions | 689 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 78.5 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 97.8 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Borough CIL residential rate | £200/m² (CIL Zone 1, East); £110/m² (CIL Zone 2, Central); £70/m² (CIL Zone 3, West) | schedule rate (2015); the council states the 2026 index figure is 400 but publishes no indexed rates on its CIL page | pfm.exacom.co.uk |
| Mayoral CIL rate (indexed) | 72.73 £/m² (indexed, permissions granted in 2026) | — | london.gov.uk |
| Building Regulations 2010 reg 14A(6) | Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing | — | legislation.gov.uk |
| Building Regulations 2010 reg 13: building notice ceases after 3 years unless work has started | 3 years | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Character codes and older Hounslow houses
The council's Character, Sustainability and Design Codes SPD sets expectations for how new work fits the local street. It is a design guide for planning decisions, and it does not cover construction. Hounslow also has 3 Article 4 directions mapped as 3 areas, so some homes lose permitted rights, though most do not.
Older houses in the borough may have solid or thin cavity walls, original timber floors and shallow foundations. When we extend them, the new structure must be tied to the old without overloading it, and the existing wall must be checked where we open it up. The technical set shows each of these junctions in detail, and your engineer's structural calculations in Hounslow supply the sizes that we draw.
Lofts and extensions in a mixed borough
54 per cent of Hounslow households live in a house, and 45.7 per cent own their home, so the borough has plenty of both homeowners and flat dwellers. A loft over a two-storey house needs a protected stair, fire-resisting doors and a floor that carries bedrooms. A rear extension needs foundations, drains and a roof that can be built without disturbing the neighbours.
Where a flat or a converted house is involved, the drawings also show fire separation and the sound insulation under Part E. Aircraft noise is outside, but footsteps and voices between flats are inside, and the regulations treat them separately. We show each with its own detail.
If you are adding a bathroom or kitchen, we show the waste and water routes, because pipes on an external wall can freeze and pipes through the floor can leak into the ceiling below. These are small points that building control expects to see resolved on the drawing.
Planning outcomes, timings and notices
Hounslow decided 689 householder applications in its latest year and granted 78.5 per cent, with 97.8 per cent decided within eight weeks or an agreed extension. With that grant rate, it pays to settle the design at planning stage before the technical set is finished.
Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Once approved, the rule is: Give notice of intention to start; work may start 2 days after the notice. A building notice lapses after 3 years if work has not started, which is a good reason to match the notice to a realistic programme.
Price, checking and levy
Building regulations drawings start at £845 with VAT included, fixed up front. A second chartered technologist checks every sheet and, if the examiner raises points, we revise at no extra charge.
Hounslow charges a zoned borough levy of £200/m² (CIL Zone 1, East); £110/m² (CIL Zone 2, Central); £70/m² (CIL Zone 3, West) under its London Borough of Hounslow CIL Charging Schedule, plus the Mayor's scheme at £72.73 per square metre in band 2. A terraced house averages £611,320. We flag any levy in the handover pack.
Related services and neighbouring boroughs
To carry the design into construction detail, see construction drawings in Hounslow, and for permission first start at planning drawings in Hounslow or architectural drawings in Hounslow. If the house needs electrical design as part of the project, see electrical design drawings in Hounslow. Next door, the same service is described for Richmond upon Thames, Ealing and Hammersmith and Fulham.
What you receive


Related pages
Other services in Hounslow
Questions
Does aircraft noise affect Building Regulations drawings in Hounslow?
Not as a formal test for most extensions, but it affects the ventilation and glazing we choose. A room that must keep its windows shut still needs adequate ventilation and protection against overheating.
Do I need Building Regulations approval for a loft conversion in Hounslow?
Yes. A loft conversion needs approval for the stair, fire escape, floor strength and insulation, whether or not planning permission is required.
What happens if my building notice lapses?
A building notice lapses after 3 years if work has not started, and you would need to give notice again.
How much do building regulations drawings cost in Hounslow?
From £845 including VAT, fixed up front. Building control charges are separate.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- pfm.exacom.co.uk, retrieved
- london.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- hounslow.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- legislation.gov.uk, retrieved
- hounslow.gov.uk, retrieved
- london.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.