020 7864 7245Request a fixed quote

Tower Hamlets, London

Building regulations drawings in Tower Hamlets

Building regulations drawings in Tower Hamlets start at £845 including VAT. Most households here live in a flat, so the technical set is usually about fire separation, structure and neighbours rather than a garden extension.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    House extension under construction with scaffolding, new glazed doors and building materials

    Tower Hamlets' plan and guidance for dense housing

    The borough's plan is the Tower Hamlets Local Plan 2031: Managing Growth and Sharing the Benefits, adopted in 2,020. Two supplementary documents describe how the council wants dense development to work: the Central Area Good Growth SPD and the High Density Living SPD.

    Both are about dense development in general, and they set the tone. The council expects careful design where homes sit close together, and an alteration that affects neighbours' light, privacy or noise will be read in that spirit. We keep our drawings consistent with the documents that apply to your address.

    Building regulations drawings serve a different purpose. They show building control how a project meets the Approved Documents: the structure, the fire protection between homes, the sound insulation, the ventilation and the drains. In a dense building, each of those is a shared matter, since the floor you change is somebody else's ceiling.

    Brick house being extended, with a wide new opening supported over the ground floor

    Local figures for Tower Hamlets

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Local planTower Hamlets Local Plan 2031: Managing Growth and Sharing the Benefits—towerhamlets.gov.uk
    Supplementary planning documentCentral Area Good Growth SPD2021towerhamlets.gov.uk
    Households living in a house12 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households23.1 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Conservation areas59 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions64 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries916 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Householder decisions191 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time95.8 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk
    Building Regulations 2010 reg 16(3C)Notify commencement within 5 days after work is regarded as commenced days—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Tower Hamlets
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    A borough of flats

    Only 12 per cent of Tower Hamlets households live in a house or bungalow, and just 23.1 per cent own their home. That leaves a borough of tenants and leaseholders, where nearly every alteration needs a freeholder's or landlord's agreement alongside the council's.

    A freeholder or managing agent will usually ask for the technical drawings before consent, particularly for anything that touches the structure, the fire compartments or the services. We prepare a clean set that can go straight to them.

    For a house, the work is often a loft, a rear addition or a conversion of a terrace, and the same discipline applies. Shared party walls and shared drains are where building control focuses, so we show each junction in detail.

    Heritage in Tower Hamlets: conservation areas, listings and World Heritage Sites

    The council publishes 59 conservation areas and 64 Article 4 directions. Historic England lists 916 entries and 10 scheduled monuments, and the borough has 2 World Heritage Sites inside its boundary.

    None of this alters the Building Regulations, which apply to every building. It changes how you can meet them. In a conservation area or on a listed building, upgrading windows, adding insulation or altering a roof can need planning or listed building consent as well, and the consent decides what the technical set is allowed to show.

    The borough also holds 72 tree preservation orders. We check the address against all of these before pricing.

    What the council's householder record shows

    Tower Hamlets decided 191 householder applications in its latest published year, a small number beside its planning decisions across all types, which came to 972. It granted 92.7 per cent of householder applications and decided 95.8 per cent on time.

    The small householder total follows from the housing: flats are not covered by householder permitted development, and most schemes here are not householder schemes at all. We therefore ask first whether your home is a house or a flat, since that decides the route and the paperwork.

    Whichever route applies, the full plans rule is the same: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing.

    Competence, fire and the dutyholder rules

    The dutyholder rules set a competence duty: Anyone carrying out design or building work must have the skills, knowledge, experience and behaviours (or organisational capability) to do it. Those apply to designers and builders alike, and our handover note records who is responsible for what.

    Compliance does not end at approval. Building control must be told when work starts and finishes. The commencement rule reads: Notify commencement within 5 days after work is regarded as commenced. A missed notice can delay the completion certificate, which a lender or a buyer will ask for later.

    What the Tower Hamlets set includes

    Sound and fire separation need particular care in flats. We specify the floor and wall build-ups by name, so that a contractor cannot swap them for something thinner, and so building control can check the sheet against what is delivered.

    A typical set holds floor plans, sections, build-ups for walls, floors and roofs, a drainage layout, fire and sound notes and a materials specification. A second chartered technologist checks every sheet and revisions after a building control query are included in the fee. We ask for the planning decision or certificate and any survey you hold.

    Earlier in the job, see planning drawings in Tower Hamlets. The engineer's figures come through structural calculations in Tower Hamlets, and services layouts through M&E drawings in Tower Hamlets.

    Nearby boroughs and the wider Tower Hamlets service

    For the whole borough, see architectural drawings in Tower Hamlets. Close by, building regulations drawings in Newham, in Southwark and in Lewisham follow each council's own guidance.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need building regulations drawings for a flat in Tower Hamlets?

    Yes, for any work that touches structure, fire protection, drainage, ventilation or insulation. A freeholder will normally want the set before agreeing.

    Which Tower Hamlets guidance applies to my project?

    It depends on the address and scheme. The Tower Hamlets Local Plan 2031: Managing Growth and Sharing the Benefits is the plan, and we check which supplementary documents apply.

    How much do building regulations drawings cost in Tower Hamlets?

    From £845 including VAT, fixed up front. Building control charges are separate.

    Does a conservation area change the Building Regulations?

    No. It changes what planning will accept, so insulation, windows and roofs may need a different detail to meet both.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.