Bexley, London
Building regulations drawings in Bexley
Building regulations drawings for a Bexley home start at £845 including VAT. They show how an extension, loft or conversion meets the Building Regulations 2010, and they are what building control checks and your builder works from. In Bexley most of that work is on houses, and we draw it as a full plans set.
From £845 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How Bexley's housing and heritage shape the construction set
Bexley is a borough of houses. 75.3 per cent of its 95,300 households live in a house or bungalow, and 68.6 per cent own their home. With that mix, the typical project is a rear or side extension, a loft room or a garage conversion on a house, rather than a flat refurbishment.
Heritage is lighter here than in inner London but it is not absent. The council publishes 23 conservation areas, and Historic England lists 114 buildings in the borough: 6 at Grade I, 9 at Grade II* and 99 at Grade II. Building Regulations still apply to a listed or conservation-area house, but the energy and fabric guidance allows for the character of older buildings, so we note early whether yours is one.
On the planning side, Bexley's Design Guide SPD Part 2: Building Alterations and Extensions sets what the council expects of an extension. That guidance decides the shape. Our construction sheets begin where it stops: the structure behind the shape, the wall and roof build-ups, and the drainage.

Local figures for Bexley
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 23 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 114 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Households living in a house | 75.3 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder decisions | 877 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 94.6 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 99.4 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Building Regulations 2010 reg 14A(6) | Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing | — | legislation.gov.uk |
| Approved Document L Vol 1 2026, p.2 | AD L 2026 (Home Energy Model) takes effect 24 Mar 2027 for non-higher-risk work | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Building regulations drawings in Bexley: what the set contains
A typical Bexley set has foundation and ground-floor plans, first-floor and roof plans, sections through the new structure and a written specification. Junctions that go wrong on site, such as the new wall meeting the old, a level threshold or a flat-roof edge, are drawn at larger scale.
Beams, padstones and lintels on our sheets are coordinated with the structural engineer's figures, and our structural calculations in Bexley can supply those if you have no engineer. Drainage is drawn with falls and connections to the existing run, and each note names the Approved Document it answers to.
The sheets come from one Revit model, so plan, section and elevation agree with each other. That is what stops a builder pricing one thing while the examiner reads another.
From planning to building control
Planning and Building Regulations are separate applications. If your project needs planning permission, the design is settled first through planning drawings in Bexley, and the construction set then follows the approved scheme. Work that is permitted development still needs building control.
For decisions, the rule is plain: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. We submit full plans, because a checked and decided set gives your builder certainty before the first trench is dug. A building notice suits only small, familiar jobs.
Bexley decided 877 householder planning applications in its latest published year and granted 94.6 per cent, with 99.4 per cent decided in time. Those figures are about planning, not building control, and they describe the past, not your house. We quote them only to show that householder work here moves steadily.
The energy rules that apply to your date
Energy is the part of the regulations that is changing. AD L 2026 (Home Energy Model) takes effect 24 Mar 2027 for non-higher-risk work. Until that date applications are made against the current edition of Approved Document L.
We design to whichever edition governs your submission and say so on the cover sheet. If your project needs an energy calculation, our SAP calculations in Bexley service is coordinated with the drawings so the insulation shown is the insulation assessed.
Price, timing and what we need from you
Building regulations drawings start at £845 with VAT included, fixed before you commit. Sheets normally follow the survey by about a week. A second chartered technologist checks every sheet before it goes out, and if the examiner asks for changes we revise at no charge.
Send us the planning decision or certificate if you have one, the survey, any earlier building control papers and your engineer's details. For the wider picture of the borough, see architectural drawings in Bexley, the full list of building regulations drawings in London, and neighbouring Dartford and Greenwich.
What you receive


Related pages
Other services in Bexley
Questions
Do I need building regulations drawings for a Bexley extension?
Yes. Building Regulations are separate from planning, and an extension that is permitted development still needs them. We prepare the set for a full plans application.
How long does Bexley building control take to decide a full plans application?
Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Actual timing varies, so allow some slack before your builder starts.
Does Bexley's heritage affect building regulations drawings?
Only where the house is listed or in one of Bexley's 23 conservation areas. The regulations still apply, but the energy guidance allows for older buildings, and we check at the start.
How much do building regulations drawings cost in Bexley?
From £845 including VAT, fixed up front. Building control fees are separate.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- bexley.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.