Building regulations drawings in Southwark

Building regulations drawings in Southwark start at £845 including VAT. Southwark is mostly flats, under a very large number of Article 4 directions, so the drawings often have to fit a design that planning has tightly controlled.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Southwark's householder guidance and the technical drawings

    Southwark's plan is the Southwark Plan 2022, and its guidance for householders is the Householder development SPD. That is the document a planning officer uses to judge an extension, a roof alteration or a change to the front of a house.

    Building regulations drawings answer a different set of questions. They show what the wall is built from, how the floor is supported, where the escape route runs and how the drains connect. They are checked by building control against the Approved Documents, not against the planning guidance.

    The two have to agree where they touch. If planning has agreed a low parapet, the technical set must show how the roof behind it is insulated, drained and supported without growing taller. We draw the planning and technical sets from the same model, so one cannot drift from the other.

    In a borough where so many streets are controlled, an approved design is often precise, and the builder has little room to improvise. That makes clear technical sheets worth having before work starts.

    Two-storey rear extension under construction on a semi-detached house

    Local figures for Southwark

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Local planSouthwark Plan 2022—southwark.gov.uk
    Supplementary planning documentHouseholder development SPD2025southwark.gov.uk
    Article 4 directions480 Article 4 directions published by the council—planning.data.gov.uk
    Article 4 direction areas480 Article 4 direction area polygons published by the council—planning.data.gov.uk
    Conservation areas53 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries919 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Households living in a house21.8 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted94.8 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time95.3 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk
    Building Regulations 2010 reg 16(4)Notify completion within 5 days of completing the work days—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Southwark
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Article 4 directions across Southwark

    The council publishes 480 Article 4 directions, covering 480 mapped areas. It also has 53 conservation areas, and Historic England lists 919 entries in the borough.

    Article 4 directions remove permitted development rights, so an ordinary change such as a new window or a front alteration may need a planning application. The Building Regulations are not affected, but the sequence is: planning decides the design, then the technical set follows it.

    Because so many streets are covered, we check the address against the council's maps before we quote. A house that looks like it can be extended under permitted development may sit under a direction, and finding that out early saves a rework of the drawings.

    Flats, leaseholds and building control in Southwark

    Only 21.8 per cent of Southwark households live in a house or bungalow, and 28.9 per cent own their home. Much of the work here is therefore in flats and maisonettes, where a freeholder or managing agent must consent to structural changes.

    That consent usually depends on the technical drawings. A freeholder wants to see the structure, the fire protection between flats and the effect on neighbours' ceilings. We produce a clean set that can be sent to a managing agent as it is.

    Fire separation needs particular care in a flat alteration. Floors and walls between homes must resist fire for a set period, and any new opening, pipe or beam that passes through them has to be sealed and detailed. We draw each one, so the building control officer can check it from the sheet and the contractor can price it before starting.

    Southwark also has an Article 4 direction covering houses in multiple occupation, so turning a house into shared accommodation needs planning permission first.

    How Southwark decides, and the building control route

    Southwark decided 558 householder applications in its latest published year, granted 94.8 per cent and decided 95.3 per cent on time. Those figures cover all schemes and say nothing about one house, but they show a council that keeps to its timetable.

    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. We submit full plans for flats and terraces, where an unexpected finding on site is expensive and slow to resolve next to neighbours.

    At the end of the job: Notify completion within 5 days of completing the work. Building control then issues a completion certificate that a buyer's solicitor will ask for.

    What the Southwark set includes

    Expect floor plans, sections, build-ups for walls, floors and roofs, a drainage layout, fire and escape notes and a materials specification. A second chartered technologist checks every sheet, and revisions after a building control query are included. We ask for the planning decision or certificate and any survey you hold.

    Southwark conversions often involve old floors and party walls whose make-up is unknown. We note where the existing structure must be opened up and checked, so that the engineer sizes new steelwork from what is really there, not from an assumption.

    Beam sizes come from structural calculations in Southwark, the earlier design stage from planning drawings in Southwark, and services layouts from M&E drawings in Southwark.

    The wider Southwark service and nearby boroughs

    For the whole borough, see architectural drawings in Southwark. Next door, building regulations drawings in Lambeth, in Lewisham and in Tower Hamlets follow each council's own guidance.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    House extension under construction with scaffolding, new glazed doors and building materials
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does an Article 4 direction in Southwark change my building regulations drawings?

    No, Article 4 directions are planning rules. They can mean you need planning permission first, and the technical set then follows the approved design.

    Which Southwark guidance covers house extensions?

    The Householder development SPD, under the Southwark Plan 2022. The technical drawings follow the Building Regulations and are kept consistent with the planning set.

    How much do building regulations drawings cost in Southwark?

    From £845 including VAT, fixed up front. Building control charges are separate.

    Does my freeholder need to see the drawings for a flat in Southwark?

    Usually, for any structural or fire-related change. A clear technical set speeds up the consent.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.