020 7864 7245Request a fixed quote

Brent, London

Building regulations drawings in Brent

Building regulations drawings for a Brent home start at £845 including VAT. They are the construction sheets that building control checks and your builder follows. Brent is a borough of terraces, flats and converted houses, so we draw for structure, fire safety and drainage with that mix in mind.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Brick house being extended, with a wide new opening supported over the ground floor

    What Brent's planning layers mean for the construction set

    Brent has 39 Article 4 directions covering 162 separate areas, plus 23 conservation areas and 1,229 tree preservation orders. Those are planning controls, and they decide what you may build. They also reach the construction drawings, because a protected tree near an extension changes foundation depth, and a retained front elevation changes how the structure is propped and tied.

    The council's planning guidance sits alongside. The Residential Extensions and Alterations Supplementary Planning Document governs the design of extensions, and the Basement Supplementary Planning Document applies if you dig down. A basement scheme adds a second layer of construction detail: retaining walls, waterproofing and a means of escape. We draw those against the Approved Documents, whatever the planning guidance says about the visible shape.

    Brent also has a Houses in Multiple Occupation SPD. If your plan is to let rooms to several tenants, the fire-safety and means-of-escape detail on the sheets becomes a larger part of the set than in a family extension.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Brent

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Article 4 directions39 Article 4 directions published by the council—planning.data.gov.uk
    Article 4 direction areas162 Article 4 direction area polygons published by the council—planning.data.gov.uk
    Conservation areas23 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries93 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Households living in a house43.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted86.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Building Regulations 2010 reg 46A(3)-(4)Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application—legislation.gov.uk
    Building Regulations 2010 reg 16(4)Notify completion within 5 days of completing the work days—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Brent
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Building regulations drawings in Brent for flats and houses

    Only 43.3 per cent of Brent's 118,612 households live in a house or bungalow, and 38.4 per cent own their home. Many projects are therefore flat refurbishments, conversions, or extensions to terraces that were split long ago.

    In a flat, the drawings concentrate on what the neighbours will notice and what the freeholder will ask about: new openings through structural walls, sound insulation between floors, fire separation and ventilation. In a house, the weight is on foundations, beams and the junction between old and new.

    Either way, the sheets come from one Revit model and are checked by a second chartered technologist. Where a construction drawings set in Brent is wanted for a builder's pricing, we draw it from the same model.

    Starting on site without losing the approval

    Approval can lapse. Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application. Brent building control or an approved inspector will look for that evidence, so we tell your builder what has to be in the ground before the clock stops mattering.

    Once work has started you also owe notice at the end: Notify completion within 5 days of completing the work. A missed notice can hold up the completion certificate, which a buyer's solicitor will later ask for.

    If the project needs planning permission first, the sequence is simple: planning drawings in Brent to settle the design, then the construction set. If you are unsure whether you need consent at all, a Lawful Development Certificate in Brent answers it in writing.

    How Brent decides householder applications

    In its latest published year Brent decided 879 householder applications and granted 86.6 per cent, with 97.2 per cent decided in time. Those are planning figures. They tell you how the council has behaved, not how building control will treat your sheets, and they say nothing about one address.

    We use them for one thing: setting realistic timing for the planning step that comes before the construction set.

    Fire safety and conversions in Brent

    Fire is the part of the regulations that Brent's mix of homes brings forward most often. Part B asks for a protected route out, smoke detection that suits the layout, and fire-resisting construction between dwellings. In a converted house the lines are drawn floor by floor: which doors are fire doors, where the stair is enclosed and how a bedroom on an upper floor reaches the street.

    Where a house is being let to several households, building control will also look at heating, ventilation and kitchen provision for each room, and the sheets cover those as well. The licensing side is separate from Building Regulations, but the drawings that support one are normally the drawings that support the other, so we prepare them once.

    Sound is the quieter issue. Part E applies when new flats are formed, and a conversion of a terrace into self-contained units needs floors and party walls that meet the sound standard. We specify the build-ups on the sections so the builder does not have to guess, and we mark where a pre-completion test may be needed.

    Cost, engineers and next steps

    Building regulations drawings start at £845 with VAT included. If you need beam sizes, our structural calculations in Brent are coordinated with the sheets, and an energy assessment comes through SAP calculations in Brent.

    For the wider view, see architectural drawings in Brent and the borough's neighbours: Ealing, Camden and Westminster.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Two-storey rear extension under construction on a semi-detached house
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do Brent's Article 4 directions change what building control needs?

    Not directly, because they are planning controls. They can change the design, though, and the construction sheets follow whatever design is permitted.

    Do I need building regulations drawings for a flat refurbishment in Brent?

    Yes, for structural changes, new openings, altered layouts that affect fire escape, and some changes to drainage or ventilation. We tell you after a short review which of these apply.

    Does a Brent basement need extra construction drawings?

    Yes. Retaining walls, waterproofing, drainage and escape are all drawn, in addition to anything the council's Basement SPD asks for on the planning side.

    How much do building regulations drawings cost in Brent?

    From £845 including VAT, fixed before you commit. Building control fees are paid separately.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.