Building services design is the planning of everything that makes a house work once the walls are up: heating, hot water, fresh air, power, lighting and drainage. We do it for London houses, extensions and small new builds, so the plant has a home on the plans before anyone orders a boiler. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

What building services design covers in a home
Think of the services as the house's organs. A heat source, a hot water store, a way to move stale air out, a consumer unit, a set of circuits and a route for waste water to reach the sewer. Each needs floor space, wall space or a route through the structure, and each depends on the others.
Building services design is the job of deciding all of that together at the drawing stage. The output is a services strategy plus coordinated layouts, so the architectural design already has a cylinder cupboard, a plant space, riser routes and a position for every fan.
It is the umbrella over three narrower services we also offer: MEP design for the engineering behind the systems, M&E drawings for the layout sheets, and plumbing and drainage drawings for the wet side.

Fabric first: how insulation sets the size of the plant
A well-insulated house needs a smaller heating system, so the fabric figures come first. For a new dwelling, Approved Document L limits windows to 1.6 W/m²K, doors to 1.6 and rooflights to 2.2. Those are limiting values, so the design aims better than them.
Renovations follow different thresholds. When an existing roof is being replaced or substantially rebuilt, it must reach 0.16 W/m²K if it is currently worse than 0.35. Existing walls trigger an upgrade above 0.7 W/m²K when they are being altered.
We run the heat-loss figure from the model and use it to size the plant. A modest extension on a leaky Victorian house can change the answer for the whole building, which is why we look at the house and not only the new room.
Heat sources, hot water and the cylinder cupboard
The choice between a gas boiler, an air source heat pump or electric heating shapes the whole design. A heat pump asks for larger emitters and a cylinder, because the guidance caps its design flow temperature at 55 degrees Celsius. Fitting that into a London terrace is mostly a question of space, which is why we settle it on the plans.
Hot water has its own limit. Bath taps are to deliver no more than 48 degrees Celsius to prevent scalding, which in practice means a blending valve or similar control on the bathroom supply.
Water use is capped at design stage too. The calculated figure is 125 litres per person per day, falling to 110 where the optional requirement is imposed on the scheme. We choose the fittings from that budget and record the result for building control.
Air, power and connections
A sealed, insulated house must breathe on purpose. Approved Document F sets a whole-dwelling rate that rises with bedrooms, starting from 31 l/s for three and adding 6 l/s for each bedroom beyond five. Individual rooms have their own extract duty, such as 15 l/s for a bathroom.
On the electrical side, the later edition of Approved Document L raises the efficacy of fixed lighting to 105 lumens per circuit watt. A new dwelling with parking also needs a charge point of at least 7 kW, so the consumer unit and cable route are sized for it from the start.
Dates matter. The next editions of the energy and ventilation documents come into force on 2027-03-24, and we say in the design notes which edition each figure comes from.
What you receive and what it costs
The package is a services strategy note, a heat-loss summary, plant and riser locations drawn into the model, and coordination sheets showing services against structure. Where the project needs full layouts, the M&E and drainage sheets are added to the same set.
We do not publish a starting price. A single extension and a retrofit of a whole house are far apart, so we run a free constraints check, agree the scope with you and send a fixed quote. Specialist calculations outside our scope are named in the quote, with who covers them.
We design and draw. A qualified installer fits and certifies the systems, and the design gives them what they need to do it once.
Where the services stage sits in the project
We start when the plan layout is nearly agreed, because the services depend on it. A first coordination pass checks routes against beams and joists, and a short list of clashes goes back to the design team. Anything that needs a wall or ceiling to move is easier to change at this point than on site.
A second technologist then checks the services set, and a senior review signs it off before it joins the construction drawings issued to your builder. If the structure is being redesigned at the same time, our structural engineering work is coordinated against it in the same model.
Building services design across London councils
Local conditions decide how visible the plant can be. A flue or condenser on the front of a house in a conservation area meets more resistance than on a modern estate, and Article 4 directions can bring small external items under control. Our council pages show the designations that affect a house in each borough.
Start with the borough where the house stands. Architectural drawings in Hackney shows the format, and architectural drawings by area lists every place we cover.
The national rules in figures
| Measure | Value | Period | Source |
|---|---|---|---|
| AD L Vol 1 (2021 incl 2023) Table 4.1, PDF p.34; 2026 edition Table 3.1 | 1.6 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.1, PDF p.34; 2026 edition Table 3.1 | 1.6 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.1, PDF p.34; 2026 edition Table 3.1 | 2.2 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.3, PDF p.36; 2026 edition Table 3.3 | 0.35 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.3, PDF p.36; 2026 edition Table 3.3 | 0.16 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) Table 4.3, PDF p.36; 2026 edition Table 3.3 | 0.7 W/(m2.K) | — | gov.uk |
| AD L Vol 1 (2026) para 4.10, PDF p.51; 2021 edition para 5.10, PDF p.46 | 55 degC | — | gov.uk |
| AD G (2015 incl 2016 and 2024) para 3.65, PDF p.28 | 48 degC | — | gov.uk |
| Building Regulations 2010 reg.36(1)-(3); AD G (2015 incl 2016 and 2024 amendments) Requirement G2 and reg.36, PDF p.17 | 125 litres per person per day | — | legislation.gov.uk |
| Building Regulations 2010 reg.36(1)-(3); AD G (2015 incl 2016 and 2024 amendments) Requirement G2 and reg.36, PDF p.17 | 110 litres per person per day | — | legislation.gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 31 l/s | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 6 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 15 l/s | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) para 6.58, PDF p.60; AD L Vol 1 (2026) paras 5.57 and 5.59, PDF p.65 | 105 lm/W | — | gov.uk |
| AD S (2021) para 6.2, PDF p.35 | 7 kW | — | gov.uk |
| AD L Vol 1 (2026) front matter; SI 2026/335; Circular 01/2026 paras 15-17 | 2027-03-24 | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
What you receive


Questions
What is building services design?
It is the design of the systems that run a building: heating, hot water, ventilation, electrics and drainage. We plan them together with the architectural design so each has space and a route.
How much does building services design cost?
Fixed quote after a free constraints check. The cost depends on the size of the project and which systems are included.
Is building services design the same as MEP design?
They overlap. Building services is the whole-house strategy and coordination, while MEP design describes the mechanical, electrical and plumbing engineering that sits inside it.
What is the maximum hot water temperature at a bath?
Approved Document G sets 48 degrees Celsius at the bath outlet to reduce scalding risk.
Do I need a services design for a small extension?
Not always as a separate package, but the heating, ventilation and electrics must still comply. A short services check with the plans avoids surprises on site.
Sources and dates
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.