020 7864 7245Request a fixed quote

Bromley, London

Building regulations drawings in Bromley

Building regulations drawings for a Bromley house start at £845 including VAT. Some of the borough's houses are listed or stand in conservation areas. We draw the construction set for building control with those conditions in mind.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Older houses, listings and green belt in Bromley

    Bromley publishes 47 conservation areas and 108 Article 4 directions, and Historic England lists 412 buildings here: 8 at Grade I, 23 at Grade II* and 380 at Grade II. About 51 per cent of the borough is covered by green-belt land.

    None of that is a Building Regulations test, but it reaches the drawings. In an older house the existing structure is rarely what a standard detail assumes: solid walls, lime mortar, shallow or uneven foundations, timber floors of unknown span. The set has to be drawn from a measured survey, not from the house next door.

    Energy guidance also gives room for older buildings. For a listed house or one in a conservation area, the regulations allow a more careful approach to insulation and windows where full standards would harm character. We record that reasoning on the sheets so the examiner sees why a detail departs from the usual.

    Two-storey rear extension under construction on a semi-detached house

    Local figures for Bromley

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas47 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions108 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries412 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Green Belt share of the council area51 % of council area covered by green-belt polygons—planning.data.gov.uk
    Householder decisions1,609 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted78.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Approved Document L Vol 1 2026, p.2AD L 2026 (Home Energy Model) takes effect 24 Mar 2027 for non-higher-risk work—gov.uk
    Building Regulations 2010 reg 11F(1) (Part 2A, from 1 Oct 2023)Anyone carrying out design or building work must have the skills, knowledge, experience and behaviours (or organisational capability) to do it—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Bromley
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Building regulations drawings in Bromley: structure, fire and drains

    The set covers foundations and floor plans, roof and upper floors, sections, junction details and a specification. Where an extension joins an older building we draw the junction at large scale, with the cavity, the damp-proof course and the movement joint all shown.

    On a Bromley plot, drainage deserves attention. Extensions often sit over or beside an existing run, and the layout has to show the falls, the access points and any build-over agreement the sewer owner needs. Our structural calculations in Bromley cover the beams and padstones.

    Fire safety is drawn to Part B: escape from a loft or first floor, protection to the new stair, smoke alarms and the like. If you have not yet settled the design, a Lawful Development Certificate in Bromley or planning drawings in Bromley come first.

    Energy edition and competence

    AD L 2026 (Home Energy Model) takes effect 24 Mar 2027 for non-higher-risk work. Applications made before then are checked against the current edition. We note the governing edition on the cover sheet, and for a larger scheme we raise timing with you at the first call.

    Since Part 2A of the regulations took effect, Anyone carrying out design or building work must have the skills, knowledge, experience and behaviours (or organisational capability) to do it. In a Bromley job that means we say in writing what we are responsible for, and your builder knows the duties that pass to them.

    How Bromley has been deciding householder applications

    Bromley decided 1,609 householder applications in its latest published year and granted 78.6 per cent. 89.1 per cent were decided within the time allowed or an agreed extension.

    These figures relate to planning, and in a borough with this much protected land they vary a good deal by street. We quote them to set expectations on timing, not to predict an outcome.

    Surveying large and older Bromley plots

    If a Bromley house has been extended before, that earlier work is a risk: it may have shallow foundations, a lintel of unknown strength or a roof that was never tied back to the original. We open up accessible areas during the survey, record what we find and draw the new work against the real structure.

    Trees are the other recurring matter. A mature tree close to a new foundation can change its depth, and the sheets then show the depth and the method. Where a tree is protected, the planning side has its own rules, and the construction set simply follows the permitted layout.

    We also look at levels. A sloping garden changes the height of the damp-proof course, the step at the threshold and the fall of the drains. Part M expectations for level thresholds are drawn where they apply, and the surface water route is shown so the examiner can see where rainwater goes.

    All of this goes into the survey notes you receive with the drawings, so your builder can see what was assumed and what was measured.

    Price and next steps

    Building regulations drawings start at £845 with VAT included, fixed up front. Sheets usually follow the survey by about a week, and revisions after an examiner's comments carry no charge. See architectural drawings in Bromley for the borough as a whole, or compare Croydon and Bexley next door.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    House extension under construction with scaffolding, new glazed doors and building materials
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does a listed house in Bromley need different building regulations drawings?

    The same regulations apply, but the guidance allows a more sensitive approach to energy measures. We record the reasoning on the sheets for the examiner.

    Do I need a survey before the drawings?

    Yes. Older Bromley houses vary, and the construction set is only as good as the measurements it is based on. We survey first.

    Does the green belt affect Building Regulations?

    No, green belt is a planning control. It limits what you may build, and the construction set follows the design that is permitted.

    How much do building regulations drawings cost in Bromley?

    From £845 including VAT, fixed up front. Building control fees are separate.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.