020 7864 7245Request a fixed quote

Conversions

Licence to alter drawings in London

If your lease says you need the landlord's consent before altering your flat, a licence to alter is how you get it, and the landlord will want proper drawings first. We prepare licence to alter drawings for London leaseholders as MCIAT chartered architectural technologists, on a fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Pencil resting on a dimensioned technical drawing beside a scale rule

    What licence to alter drawings contain

    The landlord, the managing agent and their surveyor each need to see what will change. The drawings therefore show the flat before and after: floor plans with walls to be removed or added, sections where floors or ceilings are touched, and notes on materials, finishes and services.

    Where work affects structure, the set marks the beams and openings so the landlord's surveyor can see what is proposed. It also shows the routes for pipes and ducts, which often slow consent when they cross a neighbour's space.

    Because we model the flat in Revit, every sheet matches. The landlord's reviewer is not left to find contradictions between plan and section.

    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    What the law says about consent

    Leases often bar alterations without consent. The statute softens that in one respect: A lease covenant requiring consent for improvements is subject to consent not being unreasonably withheld. A landlord who delays or refuses without grounds is therefore on weak footing.

    Landlords can still attach terms. The Act records this: Landlord may require a reasonable sum for damage or loss of value plus costs, and a reinstatement undertaking where reasonable. Good drawings make those terms easy to agree, because the extent of the work is precise.

    We are technologists, not solicitors. Your solicitor drafts and negotiates the licence itself, and our drawings are attached to it as the agreed scope.

    Planning and permitted development for flats

    A landlord's licence is separate from planning permission. The national position is firm: Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats. Many external changes to a flat therefore need a full application.

    For alterations to a single flat the council's fee is £548 from the current fee table, paid to the council. Internal work often needs no planning permission, which our constraints check confirms.

    When an application is needed, it is built on our planning drawings, and the lease terms are checked against it so the two never conflict.

    Neighbours, sound and the Party Wall Act

    Flats share floors and walls, so alterations are also a matter for the people next door. Where the work touches a party structure, the Act sets the timing: Party structure notice at least 2 months before work. We can prepare the party wall notices alongside the licence drawings.

    If walls or floors between homes are altered, Approved Document E sets the sound targets in conversions: Separating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use. Landlords often ask how new floor finishes will perform, and a clear build-up on the drawing answers that.

    Larger works, such as a new bathroom stack or a removed chimney breast, are likely to need technical drawings as well. Our building regulations drawings service covers them.

    Licence to alter drawing fees

    No fee is published for this service, and we never infer one. Send the flat's address and a short description. After the free constraints check you receive a fixed quote, VAT included, before you commit.

    A single-room refit costs far less to draw than a full reconfiguration, and the quote reflects that. Landlord legal fees and any survey charge made by the landlord are separate from ours.

    How we prepare the set

    We ask for your lease first, since the clause wording shapes the drawings. A measured survey of the flat follows, covering walls, levels and services.

    We draft the proposals in 3D and plan. You choose one in writing, a second chartered technologist checks every sheet, and then the set goes to you for your solicitor to send. Our measured building survey page explains what the survey records.

    Sets are normally ready about a week after the survey.

    What landlords and managing agents ask for

    Every landlord has its own checklist, and the lease sets the baseline. Typical requests include existing and proposed layouts, a method statement where walls change, and proof of insurance. Ask the managing agent for their application form first so we draw to it.

    Structural work is where consent is slowest. Removing a wall or cutting into a floor affects the whole building, so the landlord may want an engineer's input before agreeing. We coordinate the drawings with structural calculations so the two documents agree.

    Timing is the last point. Consent is usually needed before work begins, not after, and some leases then require a formal deed. Send us the lease, or the relevant clause, with your enquiry so the scope is right.

    Licence to alter drawings by council

    The landlord decides the licence, but planning and heritage rules still depend on the borough. Each council page sets out its conservation areas and listed buildings. See architectural drawings in Camden, a borough where most people live in flats.

    Choose your borough from architectural drawings by area.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Landlord and Tenant Act 1927 s19(2)A lease covenant requiring consent for improvements is subject to consent not being unreasonably withheld—legislation.gov.uk
    Landlord and Tenant Act 1927 s19(2)Landlord may require a reasonable sum for damage or loss of value plus costs, and a reinstatement undertaking where reasonable—legislation.gov.uk
    GPDO 2015 art 2(1), definition of "dwellinghouse"Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats—legislation.gov.uk
    Alterations/extensions: single dwellinghouse (or single flat)548 GBP—ribblevalley.gov.uk
    Approved Document E 2003 incl. 2015, Table 0.1aSeparating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use—gov.uk
    Party Wall etc. Act 1996 s3(2)(a)Party structure notice at least 2 months before work—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Upper floors of a large yellow-brick Victorian house in London with chimney pots
    Unit by unit
    Move up and down — the nearest units slide out.

    Questions

    What is a licence to alter?

    It is the landlord's written consent for a leaseholder to make alterations the lease would otherwise forbid. It normally refers to drawings that show exactly what will be done.

    How much do licence to alter drawings cost?

    We give a fixed quote after a free constraints check, VAT included. No fee is published for this service.

    Can a landlord refuse consent?

    Where the lease requires consent for improvements, the law generally says it must not be unreasonably withheld. Your solicitor can advise on a specific refusal.

    Do I also need planning permission?

    Sometimes. Flats have no householder permitted development, so external changes usually need an application. Internal work often does not.

    Do you handle the legal licence itself?

    No. Your solicitor drafts the licence. We supply the drawings it refers to.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.