Wandsworth, London
Building regulations drawings in Wandsworth
Building regulations drawings for a Wandsworth home start at £845 including VAT. The Building Regulations are national, so the rules for your beams, insulation and fire safety are the same here as anywhere in England. What is local is the planning and heritage setting around the set, and in Wandsworth that setting is dense.
From £845 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

What is local about building regulations in Wandsworth
No council writes its own version of the Building Regulations, and Wandsworth has no local rule that changes a beam size or a U-value. What the borough does supply is the planning context the technical set has to sit inside: the Housing SPD (covers rear extensions, basements, roof extensions and loft conversions) and the Basement extensions guidance (non-statutory).
The technical drawings have to match whatever planning approved. If the planning drawings show a loft dormer of a given depth, the building regulations sheets must show the same roof, with the structure and insulation inside it. We draw both sets from one model, so they cannot drift apart between the two submissions.
That is the work we do in Wandsworth that a generic technical set does not: reading the planning decision, and its conditions, before we detail anything, and carrying them into the notes.

Local figures for Wandsworth
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 46 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 312 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Grade II listed entries | 267 list entries | — | planning.data.gov.uk |
| Householder decisions | 977 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 91.9 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 92.4 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Building Regulations 2010 reg 14A(6) | Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing | — | legislation.gov.uk |
| Building Regulations 2010 reg 16(1) | Give notice of intention to start; work may start 2 days after the notice | — | legislation.gov.uk |
| Building Regulations 2010 reg 16(3C) | Notify commencement within 5 days after work is regarded as commenced days | — | legislation.gov.uk |
| Building Regulations 2010 reg 16(4) | Notify completion within 5 days of completing the work days | — | legislation.gov.uk |
| Building Regulations 2010 reg 13: building notice ceases after 3 years unless work has started | 3 years | — | legislation.gov.uk |
| Approved Document L Vol 1 2026, p.2 | AD L 2026 (Home Energy Model) takes effect 24 Mar 2027 for non-higher-risk work | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Conservation areas and listed buildings change the detail
Wandsworth publishes 46 conservation areas, and Historic England lists 312 entries in the borough, including 267 at Grade II. Planning decides what you may build in those places. Building Regulations still apply to what you build, and the two meet at the details: window replacements, insulation to old walls and roof-lights in a protected slope.
In an older house the energy-saving work has to be balanced against the historic fabric, so we draw the insulation build-up and the ventilation of the old walls and roof with care, and discuss anything unusual with building control before submission. For a listed house, listed building consent is a separate approval from the technical set.
Timings and notices for a Wandsworth project
The national timings apply in full. For a full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Before starting: Give notice of intention to start; work may start 2 days after the notice.
Once on site, you must notify commencement and completion. The first rule is: Notify commencement within 5 days after work is regarded as commenced. The second is: Notify completion within 5 days of completing the work. We list both on the handover sheet so your builder has the dates in one place.
If you are submitting a building notice instead of full plans, it ceases after 3 years unless work has started. For a basement or loft in an older Wandsworth terrace we recommend full plans, so there is a decision before the first excavation.
Energy rules and the coming change to Approved Document L
Approved Document L is changing. The current position is: AD L 2026 (Home Energy Model) takes effect 24 Mar 2027 for non-higher-risk work. Transitional arrangements can decide which edition applies to your work, so we check the dates when we quote.
We design to whichever edition governs your submission and tell you if timing could help or hurt. Where the project also needs an energy rating, our SAP calculations in Wandsworth are coordinated with the same set.
Planning context: how Wandsworth decides applications
Wandsworth decided 977 householder applications in its latest published year and granted 91.9 per cent, with 92.4 per cent decided in time. Those figures belong to planning, not to building control, and they describe all household projects in the borough rather than yours.
We mention them because a planning decision usually arrives before the technical set is submitted, and its conditions pass down to the drawings. A condition on materials or on a window detail is a technical matter by the time it reaches site.
What you receive and related services in Wandsworth
A Wandsworth set normally includes foundation and floor plans, sections, structural details agreed with the engineer, drainage, insulation and ventilation notes, and a specification. It starts at £845 with VAT included, fixed before you commit, and sheets are normally ready about a week after the survey. A second chartered technologist checks every sheet.
The set is coordinated with structural engineering in Wandsworth and drawn from the same model as your construction drawings in Wandsworth. For the borough overview, see architectural drawings in Wandsworth.
Next door, compare Lambeth, Merton and Richmond upon Thames, or read the overview of building regulations drawings.
What you receive


Related pages
Other services in Wandsworth
Building regulations drawings nearby
Questions
Does Wandsworth have its own building regulations?
No. The Building Regulations are national. Wandsworth's planning guidance and heritage designations shape the design the technical drawings must follow.
Do building regulations drawings need to match the planning drawings?
Yes. The technical set must show the same design that planning decided, so we draw both from one model and carry any condition into the notes.
How much do building regulations drawings cost in Wandsworth?
From £845 including VAT, fixed up front. Building control fees are paid to the building control body separately.
Does a conservation area change the technical drawings?
Not the regulations, but the detail. Wandsworth has 46 conservation areas, and in older houses insulation and ventilation need careful design around historic fabric.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- wandsworth.gov.uk, retrieved
- wandsworth.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.