Harrow, London
Building regulations drawings in Harrow
Building regulations drawings in Harrow start at £845 including VAT. Harrow is mostly suburban, with 65.4 per cent of households in a house, so the usual jobs are side and rear extensions, garage conversions and lofts on semi-detached homes, and each needs a set that building control can check before the builder starts.
From £845 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

Harrow's design guide and the technical set behind it
Harrow's planning rules for house alterations sit in its Residential Design Guide SPD, which supports the Harrow Local Plan 2021-2041, adopted in 2,026. The guide tells you how a side extension should relate to the boundary and how a roof should look from the street. It does not tell you how the wall is built.
That is the job of the building regulations set. A side extension on a semi needs foundations that clear the neighbour's, a cavity wall or equivalent that meets the energy rules, a roof tied to the existing one and a drain run that does not cross the neighbour's land. We draw each of these, with the specification written so your builder can price what is actually required.
Harrow has 31 conservation areas and Historic England lists 295 entries, so a minority of homes face extra planning limits. For everyone else, the technical drawings are the larger part of the paperwork, and they are what your builder prices from.

Local figures for Harrow
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 31 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 295 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Households living in a house | 65.4 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder decisions | 917 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 81.7 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 93.7 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Average price, terraced | 536,748 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Borough CIL residential rate | £196.43/m² (Residential, Use Class C3, borough-wide) | 2026 indexed rate; schedule rate £110/m² (index 224 to 400) | harrow.gov.uk |
| Mayoral CIL rate (indexed) | 72.73 £/m² (indexed, permissions granted in 2026) | — | london.gov.uk |
| Building Regulations 2010 reg 14A(6) | Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing | — | legislation.gov.uk |
| Building Regulations 2010 reg 46A(3)-(4) | Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Garage conversions and side extensions on Harrow semis
A frequent Harrow brief is to turn an integral garage into a room, or to build over and beside it. Building control looks hard at a few specific points. The old garage floor has to be insulated and damp-proofed. The up-and-over door opening is infilled with a wall that matches the rest of the house. The new room needs a proper ventilation route, and a window large enough to escape through where it opens off a hall that serves the stairs.
A first-floor side extension adds structure above the garage, so the existing walls and foundations have to be checked by your engineer. We draw their sizes into the plans and sections, so the numbers on our sheets match theirs. If you have not yet appointed one, see our structural calculations in Harrow service.
Fire is the point most often missed. Opening a garage into the house removes a fire-resisting separation that the original design relied on. Building control will want to see that the new wall, door or ceiling restores it where it is needed, and that smoke alarms are linked and powered from the mains. We show these on the plans, and note the standard each element must reach.
Shared homes and the extra checks
Harrow has an Article 4 direction for turning houses into small shared homes, and that matters for building control as much as planning. Where a house is already in shared use, or where an owner intends to let rooms, fire detection, escape routes and sound separation between rooms all affect the technical set.
We ask early whether a project could ever be let that way. It costs little to build the right fire doors in at the start, and a great deal to cut them in later.
Timings, notices and decisions in Harrow
Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Harrow decided 917 householder planning applications in its latest year and granted 81.7 per cent, with 93.7 per cent decided on time. If your plan needs permission, we normally wait for it before finishing the technical sheets.
After approval, you must tell building control before you start and again at commencement and completion. Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application. For a side extension that means the foundations and ground-floor structure, so start the clock deliberately.
Cost, levy and what you receive
Building regulations drawings start at £845 with VAT included. The price is fixed up front, a second chartered technologist checks every sheet and we revise the sheets at no charge if the examiner raises points.
Harrow charges its own levy of £196.43/m² (Residential, Use Class C3, borough-wide) under the London Borough of Harrow CIL Charging Schedule, as well as the Mayor's scheme at £72.73 per square metre in band 2. A terraced house averages £536,748 and a flat £317,917, so we flag any liability in the handover pack before you commit to the build.
Next steps and neighbouring services
To take the sheets on to site, see construction drawings in Harrow. If you still need consent, start at planning drawings in Harrow, check permitted development with a lawful development certificate in Harrow, or read the overview at architectural drawings in Harrow. The same service is also described for Brent, Hillingdon and Ealing.
What you receive


Related pages
Other services in Harrow
Questions
Do I need building regulations approval to convert a garage in Harrow?
Yes. A garage conversion needs approval for insulation, damp-proofing, ventilation and escape, even when no planning permission is needed.
Does the Harrow Residential Design Guide cover the Building Regulations?
No. It guides planning decisions on design. Construction standards are assessed by building control from your technical drawings.
When does Building Regulations approval lapse?
Approval lapses unless work commences; for an extension, commencement means foundations, any basement and ground floor structure complete; other work, 15% of the work stated in the application.
How much do building regulations drawings cost in Harrow?
From £845 including VAT, fixed up front. Building control charges are separate.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- harrow.gov.uk, retrieved
- london.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- harrow.gov.uk, retrieved
- harrow.gov.uk, retrieved
- harrow.gov.uk, retrieved
- london.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.