Building regulations
M&E drawings in London
M&E drawings are the sheets that show where the mechanical and electrical parts of a building go: extract fans and ducts, consumer units, sockets, lighting, alarms and the routes between them. We draw them for London houses and extensions so that an electrician and a ventilation fitter price the same job. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

What an M&E drawing set shows
Builders sometimes fit services from a conversation and a sketch. That works until two trades want the same space, or until building control asks where the extract goes. An M&E set puts those answers on paper before work starts.
A residential set normally has a lighting and power layout per floor, a ventilation plan with each fan and its duty, a distribution schematic for the consumer unit and circuits, a smoke and heat alarm layout and a note of every notifiable item. Symbols follow a legend on the first sheet, and a schedule lists each fitting once, so quantity takeoffs match the plans.
We draw into the same Revit model that holds the walls and floors. A cable route that would cross a beam shows up as a clash. Our broader MEP design service covers the design behind these drawings, including heating and water.

Ventilation extract rates we draw to
Approved Document F sets the extract rates that fans must reach. In a kitchen with a hood venting outside the intermittent rate is 30 l/s, and where there is no hood or the air recirculates it is 60 l/s. Utility rooms need 30 l/s and bathrooms 15 l/s. A separate toilet needs only 6 l/s.
Where ventilation runs continuously, the high-rate figures are lower per room, such as 13 l/s in a kitchen and 8 l/s in a bathroom. The drawing states which system each room uses, because the two methods have different rates.
Whole-dwelling figures set the minimum for the house: a two-bedroom home needs 25 l/s and a four-bedroom one 37 l/s. We note every figure on the plan next to its fan.
Electrical work that must be notified
Part P of the Building Regulations covers electrical safety in dwellings, and the notifiable work is listed in the guidance: new circuit; consumer unit replacement; additions or alterations to circuits in a special location. The adopted edition is the 2013 edition; takes effect 6 Apr 2013.
Notification is normally handled by a registered electrician, who then has 30 days to certify the work. Our drawings do not replace that certificate. They give the electrician the circuit layout and the special locations in advance, which makes a notification quicker to prepare.
Lighting is regulated as well. Fixed lighting must reach 75 lumens per circuit watt under the current edition of Approved Document L, rising to 105 in the later edition. The schedule on our sheet names the fittings against that figure.
Carbon monoxide alarms and charge points
Approved Document J requires an alarm in the room where a new or replaced appliance is fitted. For solid fuel the trigger is new or replacement fixed solid fuel appliance in a dwelling (AD J para 2.34), and for gas it is new or replacement fixed gas appliance, excluding gas used solely for cooking (AD J para 3.43). The alarm standard is BS EN 50291-1:2018, and we mark each alarm position on the plan.
Parking brings a charge point duty for new dwellings: a nominal output of at least 7 kW. The M&E drawing shows its position, the cable route and the spare way in the consumer unit. More on the power side is on our electrical design drawings page.
Price, scope and what we do not draw
There is no published starting price for M&E drawings, because the number of rooms and the type of system change the work so much. We run a free constraints check, agree what is needed and give a fixed quote.
We draw layouts, schedules and schematics. We do not certify installations, and we do not replace the installer's design calculations where a specialist system needs them. If your project needs plant that sits beyond a domestic scope, we tell you at the quote stage and agree who covers it.
How M&E drawings fit the rest of the set
Existing buildings need a short survey of the services first. We record where the consumer unit, meter and any ducts or flues already are, because an M&E layout that ignores them will not work on site. Where something cannot be seen, the drawing says so, and the installer confirms it before pricing.
M&E sheets follow the architectural layout, so we issue them after the plans are frozen and before the construction package closes. Each sheet is checked by a second technologist, and the set is cross-checked against the architectural drawings so a socket never lands behind a cupboard door.
They then join the building regulations drawings that go to building control, and the same sheets help your contractor price. If you also need drainage and hot water layouts, our building services design page describes the full package.
M&E drawings by borough
The regulations are national, but the houses are local. A terraced house in a conservation area leaves little space for a visible duct, while a modern semi has more freedom. Our council pages show the local designations that restrict external services such as flues and vents. See architectural drawings in Camden, or all places under architectural drawings by area.
The national rules in figures
| Measure | Value | Period | Source |
|---|---|---|---|
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 30 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 60 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 30 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 15 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 6 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.2 continuous extract high rates, PDF p.18; 2026 edition Table 1.2 | 13 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.2 continuous extract high rates, PDF p.18; 2026 edition Table 1.2 | 8 l/s | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 25 l/s | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 37 l/s | — | gov.uk |
| Building Regulations 2010 reg.12(6A) and (9); AD P (2013) para 2.5, PDF p.14 | new circuit; consumer unit replacement; additions or alterations to circuits in a special location | — | legislation.gov.uk |
| AD P (2013), 'Main changes in the 2013 edition', PDF p.2 | 2013 edition; takes effect 6 Apr 2013 | — | gov.uk |
| AD P (2013) paras 3.4, 3.6 and 3.7 | 30 days | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) para 6.58, PDF p.60; AD L Vol 1 (2026) paras 5.57 and 5.59, PDF p.65 | 75 lm/W | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) para 6.58, PDF p.60; AD L Vol 1 (2026) paras 5.57 and 5.59, PDF p.65 | 105 lm/W | — | gov.uk |
| AD J (2010 incl 2022) requirement J3; paras 2.34-2.36, PDF p.43; para 3.43, PDF p.57 | new or replacement fixed solid fuel appliance in a dwelling (AD J para 2.34) | — | gov.uk |
| AD J (2010 incl 2022) requirement J3; paras 2.34-2.36, PDF p.43; para 3.43, PDF p.57 | new or replacement fixed gas appliance, excluding gas used solely for cooking (AD J para 3.43) | — | gov.uk |
| AD J (2010 incl 2022) requirement J3; paras 2.34-2.36, PDF p.43; para 3.43, PDF p.57 | BS EN 50291-1:2018 | — | gov.uk |
| AD S (2021) para 6.2, PDF p.35 | 7 kW | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
What you receive


Questions
What are M&E drawings?
They are drawings of the mechanical and electrical services in a building: ventilation, power, lighting, alarms and the routes between them. They tell the installers and building control what goes where.
How much do M&E drawings cost?
Fixed quote after a free constraints check. The price depends on the number of rooms and systems, so we quote once we have seen the plans.
Do I need M&E drawings for a house extension?
Not always, but ventilation and electrical work in an extension is still regulated. A simple layout avoids arguments between trades and gives building control the information it asks for.
What is Part P?
It is the part of the Building Regulations that covers electrical safety in homes. Certification is normally within 30 days of completing notifiable work.
What ventilation rate does a bathroom need?
The intermittent extract rate for a bathroom is 15 l/s under Approved Document F. We note the rate on the plan beside each fan.
Sources and dates
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.