020 7864 7245Request a fixed quote

Newham, London

Building regulations drawings in Newham

Building regulations drawings in Newham start at £845 including VAT. Newham has a householder guide written for exactly the work most owners plan, and a council that decides householder applications quickly, so the technical drawings are usually the step that sets your start date.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    House extension under construction with scaffolding, new glazed doors and building materials

    Newham's householder guide and the drawings behind it

    The council's guidance for extending a home is the Altering and Extending your Home SPD, which supports the Newham Local Plan 2018. That plan dates from 2,018, so an extension designed today is being judged against guidance written some years ago. We check the status of both before we draw anything.

    The technical set is judged on different grounds. Building control reads it against the Approved Documents, looking at foundations, structure, fire separation, insulation, ventilation and drainage. The two documents meet at the shape of the building: a deeper rear extension that planning allows still needs a roof that drains, a beam that carries it and a wall that keeps its heat.

    We keep both sets consistent by drawing them from one Revit model. If planning asks for a lower eaves line or a changed roof, the technical sheets change with it, and the beam and build-up notes follow without being redrawn by hand.

    Brick house being extended, with a wide new opening supported over the ground floor

    Local figures for Newham

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Local planNewham Local Plan 2018—newham.gov.uk
    Local plan adopted2,018—newham.gov.uk
    Supplementary planning documentAltering and Extending your Home SPD2018newham.gov.uk
    Owner-occupied households30.8 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Households living in a house47.1 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Conservation areas9 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries125 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Householder applications granted86.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time97.2 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk
    Building Regulations 2010 reg 16(1)Give notice of intention to start; work may start 2 days after the notice—legislation.gov.uk
    Building Act 1984 s35(4), substituted by Building Safety Act 2022 s39Contravening building regulations: on indictment up to 2 years' imprisonment or a fine (or both)—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Newham
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Renters, owners and who commissions the drawings in Newham

    Only 30.8 per cent of Newham households own their home, and 47.1 per cent live in a house or bungalow. Most households are therefore not owner-occupiers, so the person commissioning the drawings may be a landlord improving a house to let rather than an owner extending a family home.

    That changes the brief. A landlord often needs fire separation, escape routes and sound insulation drawn clearly, since those are the points a tenant, a mortgage lender or a licensing officer will ask about. Newham also has an Article 4 direction for houses in multiple occupation, so dividing a house into shared accommodation needs a planning application before the technical work starts.

    If that is your project, tell us at the first call. A shared house raises fire and escape duties that a family house does not, and the drawings are scoped to match.

    Planning speed in Newham and what it means for the building control timetable

    Newham decided 388 householder applications in its latest published year. It granted 86.9 per cent and decided 97.2 per cent on time.

    Those figures cover every householder scheme and say nothing about your house, but the timing is a fair guide. Where planning is quick, the technical drawings become the longer job, so we start them as soon as the design is fixed and aim to have them ready when the decision arrives.

    The borough also holds 9 conservation areas and 125 list entries. We check every address against them at the start.

    Full plans, notices and the penalty for skipping them

    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Full plans give you a decided set before work begins, and it is the route we use for extensions and conversions.

    Building work without approval is an offence: Contravening building regulations: on indictment up to 2 years' imprisonment or a fine (or both). In practice councils work with owners, but unapproved work can block a sale or a remortgage, which matters to a landlord with a portfolio.

    Notices are part of compliance too. Give notice of intention to start; work may start 2 days after the notice, and at the end: Notify completion within 5 days of completing the work.

    What the Newham set includes and what it costs

    The set normally holds foundation and floor plans, sections, wall, floor and roof build-ups, drainage, fire and escape notes where they apply, and a materials specification. A second chartered technologist checks each sheet. Building regulations drawings start at £845 with VAT included, and revised sheets after a building control query carry no extra fee.

    We ask for the planning decision or certificate, any survey you already hold and the freehold details if the house has been converted. We say at the outset if a missing document will hold the set up.

    Earlier in the job see planning drawings in Newham. The engineer's figures come through structural calculations in Newham, and the SAP assessor is coordinated through SAP calculations in Newham.

    Nearby boroughs and the wider Newham service

    For the whole borough, start at architectural drawings in Newham. Across the boundary, see building regulations drawings in Tower Hamlets, in Redbridge or in Waltham Forest, each following its own council's planning guidance.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Which Newham guidance covers house extensions?

    The council's Altering and Extending your Home SPD, which supports the Newham Local Plan 2018. Building regulations drawings follow the Approved Documents, and we keep them consistent with the planning set.

    Does a shared house in Newham need different drawings?

    Often, yes. Newham has an Article 4 direction for houses in multiple occupation, so planning permission is needed first, and fire separation and escape routes are drawn in more detail.

    How much do building regulations drawings cost in Newham?

    From £845 including VAT, fixed up front. Building control charges are separate.

    What happens if work starts without building regulations approval?

    Contravening building regulations: on indictment up to 2 years' imprisonment or a fine (or both). It can also hold up a sale, so approval is worth getting first.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.