If more than one contractor will work on your project, the law expects you to name a Principal Designer in writing before building starts. We take that role for London homeowners, as MCIAT chartered architectural technologists who already hold the design, on a fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on principal designer

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    What a Principal Designer does

    A Principal Designer plans, manages and monitors the design work and coordinates the other designers, so that the building, if built to the design, meets the Building Regulations. The role comes from Part 2A of the Building Regulations 2010, which came into force on 1 October 2023.

    It is not the same as the health and safety role of the same name under the Construction (Design and Management) Regulations 2015. A domestic project can carry both appointments, which is why a homeowner may be asked to name a Principal Designer twice.

    You do not have to learn the schedules. You do need to know who holds the role, in writing, before the first contractor arrives.

    Two-storey rear extension under construction on a semi-detached house

    When you have to appoint one

    The trigger is the number of contractors. In the words of the regulations: Where there is more than one contractor, or it is reasonably foreseeable that more than one will work on the project, the client must appoint in writing a principal designer and a principal contractor. The appointment must be made before the construction phase begins.

    A kitchen extension with a builder, a separate electrician and a groundworker would meet that test. One firm doing everything under one contract follows a different route, covered below.

    Skipping the appointment does not remove the duty. Where nobody has been appointed, the designer in control of the design phase is treated as the Principal Designer. That is how a homeowner can inherit an obligation by accident, and it is why we raise the appointment when we quote.

    One contractor, a lead designer, and the shortcuts

    The rule for a single contractor is this: A sole contractor is treated as principal contractor; a sole designer, or an agreed lead designer, fulfils the principal designer duties. The lead-designer agreement must be in writing, and you should hold a copy.

    A second shortcut lets the client certify in writing that the person already appointed under the CDM rules is also treated as the Part 2A appointment. And some work is outside the system altogether: Part 2A does not apply where the building work or design work consists only of work described in Schedule 4. Before we quote the role, we check whether your project falls inside that list.

    What the duties cover on a house

    The duty is stated plainly: Plan, manage and monitor the design work and coordinate it so the building work, if built to the design, complies with all relevant requirements. On a house that means keeping the structural engineer's calculations, the drainage layout, the energy compliance and our own drawings consistent with one another, so an error found on site was not designed in.

    When the appointment ends, the Principal Designer hands you a document describing the arrangements that were made, in the period the regulations set. Keep it with the house papers, because a future buyer's solicitor may ask for it.

    We model each house once in 3D and issue every sheet from that model, so much of the coordination happens as the drawings are produced. Our building regulations drawings and the structural engineering input are checked against each other before issue.

    Competence and changes of duty holder

    Whoever you appoint needs the right capability. The regulations call for this: Skills, knowledge, experience and behaviours (individual) or organisational capability (organisation) to fulfil the principal designer duties; an organisation must designate an individual to manage the role. Someone still in training cannot be appointed, so ask any candidate how they meet the test.

    If the Principal Designer or the principal contractor changes mid-project, the building control body must be told within 14 calendar days. We would raise the notice with you on the day a handover is agreed. Starting late is harder to put right than starting correctly, which is the practical reason to settle the appointment at the beginning.

    The CDM side, briefly

    Under the CDM Regulations a client appoints a Principal Designer and a principal contractor where more than one contractor is involved. For a householder the position is softer: Domestic client duties pass to the contractor (one contractor), the principal contractor (more than one), or the principal designer under a written agreement.

    A project must also be notified to the Health and Safety Executive once it is big enough. The test is: Notifiable if construction work is scheduled to last longer than 30 working days with more than 20 workers simultaneously at any point, or to exceed 500 person days. We compare your programme and labour with those thresholds at quote stage, since most domestic jobs fall below them.

    Price, process and who does the work

    There is no published price, because the effort depends on the project's duration and the number of trades. You receive a fixed quote after a free constraints check, with no hourly surprises.

    Most clients take the role together with the drawings, since the person holding the design is best placed to coordinate it. If another firm is drawing your project, we can quote for the role on its own.

    If the scheme also needs a planning strategy, add a planning consultant. If you are at the very start, begin with planning drawings.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    SI 2023/911 reg 1(2): in force 1 October 2023; inserts Part 2A (regs 11A-11Q) into the Building Regulations 20101 October 2023—legislation.gov.uk
    Building Regulations 2010 reg 11D(1)Where there is more than one contractor, or it is reasonably foreseeable that more than one will work on the project, the client must appoint in writing a principal designer and a principal contractor—legislation.gov.uk
    Building Regulations 2010 reg 11D(6)-(7)A sole contractor is treated as principal contractor; a sole designer, or an agreed lead designer, fulfils the principal designer duties—legislation.gov.uk
    Building Regulations 2010 reg 11M(1)-(2)Plan, manage and monitor the design work and coordinate it so the building work, if built to the design, complies with all relevant requirements—legislation.gov.uk
    Building Regulations 2010 reg 11G(1)-(3); general competence reg 11F; client checks reg 11ESkills, knowledge, experience and behaviours (individual) or organisational capability (organisation) to fulfil the principal designer duties; an organisation must designate an individual to manage the role—legislation.gov.uk
    Building Regulations 2010 reg 11O(7): notice to the relevant (building control) authority within 14 calendar days of appointment or change of client; not higher-risk building work (reg 11O(8))14 calendar days—legislation.gov.uk
    Building Regulations 2010 reg 11PPart 2A does not apply where the building work or design work consists only of work described in Schedule 4—legislation.gov.uk
    CDM 2015 reg 7(1)-(3)Domestic client duties pass to the contractor (one contractor), the principal contractor (more than one), or the principal designer under a written agreement—legislation.gov.uk
    CDM 2015 reg 6(1)(a)-(b)Notifiable if construction work is scheduled to last longer than 30 working days with more than 20 workers simultaneously at any point, or to exceed 500 person days—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    House extension under construction with scaffolding, new glazed doors and building materials
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need a Principal Designer for a house extension?

    If more than one contractor will work on it, or it is reasonably foreseeable that they will, yes: the client must appoint one in writing before the construction phase begins. A single contractor on one contract changes the position.

    What happens if I do not appoint one?

    The designer in control of the design phase is treated as the Principal Designer. The simplest fix is to appoint in writing before work starts.

    How much does a Principal Designer cost?

    We give a fixed quote after a free constraints check. It depends on the project's duration and the number of trades involved.

    When did these Building Regulations duties start?

    Part 2A came into force on 1 October 2023. The older CDM role has applied for longer, and a project can carry both.

    Can I change the Principal Designer part-way?

    Yes, but the building control body must be told within 14 calendar days of the change.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.