020 7864 7245Request a fixed quote

Building regulations

Private building control in London

You can choose who checks your building work: your council's building control team or a private firm. Private firms must now be registered with the Building Safety Regulator. We prepare the drawings and coordinate the application with whichever you choose. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    House extension under construction with scaffolding, new glazed doors and building materials

    Council or private building control: the choice

    Building control is the independent check that building work meets the Building Regulations. Two kinds of body can do it. Your local authority has a building control team for its area. A private firm can do the same job anywhere it is registered to work.

    The legal tests are identical, so neither is a soft option. What differs is service: how quickly they visit, how they communicate, how they charge and how flexible they are about inspection times. Some owners also like to keep a single firm across several projects.

    We do not act as a building control body ourselves. We coordinate the application, so the drawings and notices go to whichever body you appoint.

    Ask each body what it will inspect and when. Visits normally follow the stages of the work: foundations, drains, structure, insulation and completion. Agreeing the sequence early stops a trench being backfilled before it is seen.

    Brick house being extended, with a wide new opening supported over the ground floor

    The registration rule that now applies

    Private building control firms must be registered building control approvers with the Building Safety Regulator. That requirement is in force now. Before it, the equivalent was an approved inspector.

    The rule has teeth. Operating as an approved inspector without registering is a criminal offence. For you, the practical point is simple: before you appoint a private firm, check that it is on the regulator's register of approvers.

    We will point you to the register and check the firm's status when we coordinate your application.

    Ask for the firm's registration details and look them up yourself; the regulator keeps the register of approvers.

    How charges work

    Local authority charges are set by each council's own charging scheme, which is designed to recover the cost of the service. They differ from borough to borough, and the council publishes its scheme.

    Private firms set their own fees. Compare like with like: ask what is included, how many inspections, and whether a completion certificate is part of the price. A low quote that leaves out visits can end up costing more.

    The building control fee is separate from ours. We can describe what the examiner will need to see, but we do not set or take their fee.

    Check what happens if the project changes. A change of scope, such as adding a loft to an extension, can alter the fee, so ask how a revised design is charged before you sign.

    Timing and the full plans decision

    Whichever body you choose, the same rule applies to a full plans application: the building control body must decide within a set statutory period, or longer if agreed in writing. The figure is in the table.

    Speed in practice depends on how complete your drawings are. An examiner who finds gaps will issue queries, and each round adds time. That is why we prepare a set that already carries structure, insulation, fire and drainage information. See our building regulations drawings page for what the set contains.

    Do not treat the statutory period as a promise of approval. It is the time allowed to give an answer.

    What happens if rules are broken

    Contravening the Building Regulations is an offence. Under the Building Act 1984, as changed by the Building Safety Act 2022, a conviction on indictment can bring a fine or up to two years' imprisonment. Work that ignores the regulations carries that risk.

    The more common consequence is practical. Without a completion certificate, a buyer's solicitor will raise it, and a lender may hold back. Choosing a registered body and keeping to the notice sequence avoids all of that.

    How we coordinate the application

    We prepare the technical drawings, submit the application to your chosen body and respond to the examiner's questions. We also prepare the commencement and completion notices, so the sequence of visits is not missed.

    Where the work needs engineering, we coordinate with structural calculations. Where the design needs detailed specification, our construction drawings page describes the full set. A reviewer who is not the drafter checks the submission, and we amend the drawings free of charge if the examiner raises queries.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    GOV.UK Registered building control approversPrivate building control firms must be registered building control approvers (RBCAs) with the Building Safety Regulator from 6 Apr 2024—gov.uk
    GOV.UK Registered building control approversOperating as an approved inspector after 6 Apr 2024 without registering is a criminal offence—gov.uk
    Building (Local Authority Charges) Regulations 2010 reg 7Local authority building control charges are set by each council's charging scheme to recover the cost of the service—legislation.gov.uk
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk
    Building Act 1984 s35(4), substituted by Building Safety Act 2022 s39Contravening building regulations: on indictment up to 2 years' imprisonment or a fine (or both)—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Can I use a private firm instead of the council?

    Yes. You can appoint either your local authority's building control team or a registered private firm. The legal tests are the same.

    Do private building control firms have to be registered?

    Yes. They must be registered building control approvers with the Building Safety Regulator, and operating without registration is a criminal offence.

    How are council building control charges set?

    Each council sets them in its own charging scheme, designed to recover the cost of the service.

    Are you a building control body?

    No. We prepare the drawings and coordinate the application with whichever body you appoint.

    How long does a full plans decision take?

    The building control body must decide within a statutory period, or longer if agreed in writing. No date can be promised.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.