Extensions and lofts
Wraparound extension drawings in London
A wraparound extension joins a rear extension to a side return, so the new room turns the corner of the house. We prepare wraparound extension drawings for London homes from £1,195 including VAT. The planning test is seldom about either arm on its own. It is about the two added together.
From £1,195 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on wraparound extension drawings
Nine steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Why the two arms are judged together
Drawn on a plan, a wraparound looks like a side extension plus a rear extension. Under the permitted development rules it is a single enlargement, and the national position reads: Limits apply to the total enlargement (new part plus any existing enlargement it joins).
That one rule is why so many wraparounds cannot go ahead as permitted development. A side arm that passes alone can tip the combined enlargement over the line once the rear arm is added.
We draw both on one model and test the total before recommending a route. You learn early whether you are heading for a certificate or a full application, before any money goes into detailed design.

The limits on each arm
The side arm has its own test: Side extension: single storey, max 4 m high, max half the width of the original house. The rear arm has another: 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey.
Both are measured from the original house, as first built or as it stood on the appointed day, so an earlier conservatory or outrigger uses up part of the allowance. Owners are often surprised how little is left, which is why we measure the original footprint ourselves instead of trusting a sales plan.
When the sums fail, a householder application is the normal answer; our planning drawings page explains how that works. If the design fits within the limits and you want proof, a Lawful Development Certificate confirms it.
Conservation areas and wraparounds
Conservation areas bite hardest on this type of extension. The national rule: On article 2(3) land (conservation areas etc.): no side extensions, no cladding, no rear extension of more than one storey under Class A.
A wraparound contains a side arm by definition, so permitted development cannot deliver one on that land. The route is a planning application, where officers read the design against the character of the street.
That is not a closed door. Matching brick, a considered roof form and glazing set back from the street frontage all help a case. Before drawing, we look at the address and the decisions already made on your road.
Glass, rooflights and the energy check
Glazing is where wraparounds most often come unstuck on the building regulations side. The simple route is capped: Windows, roof windows, rooflights and doors in an extension should not exceed 25% of the extension floor area plus the area of openings removed or covered. A kitchen opening onto two sides of the garden can reach that ceiling without much effort.
Where the design wants more glass, a calculation can justify it. That route sits under SAP calculations, and it is far better settled at drawing stage because it alters the wall and roof build-up and the size of the doors.
The finished specification carries through into our building regulations drawings.
Layout, light and the existing house
The shape of the room matters as much as its size. A wraparound lets the kitchen, dining and seating areas share one open space with glass on two sides, but the corner where the arms meet is where the structure is busiest: a steel frame, a change in roof level and often a drain run below the slab.
We therefore draw the roof early. A flat roof with a lantern, a pitched roof tucked under the first-floor windows and a monopitch against the side wall each change the ceiling height inside and the look from the street. Seeing them in section before you commit avoids a costly change once the steel is ordered.
Daylight to the existing rooms is the other point. Closing in a side passage can darken a window serving the old kitchen or hall, so we show where light is lost and how a rooflight or an internal opening can restore it.
Party wall notices on more than one boundary
A wraparound meets the neighbour at the side and frequently at the rear too, so expect more than one notice. For a new wall on the boundary, the requirement is: Line-of-junction (new wall) notice at least 1 month before work.
Foundations can add another. The excavation rule: Adjacent excavation notice at least 1 month before work: within 3 m and deeper than the neighbour's foundations, or within 6 m and cutting a 45° line from their foundations. Wraparounds often go deeper than a simple rear room because the footprint is bigger and the steel heavier.
We prepare the drawings that go with the notices through party wall notices, and we suggest a word with each neighbour before anything arrives on their doormat.
Wraparound extension drawings in London: price and package
Wraparound extension drawings start at £1,195, VAT included, fixed and published before you commit. A householder application also carries a council fee of £548, which you pay to the council.
The package holds existing and proposed plans, elevations and sections, location and block plans, and submission if you want us to handle it. Because a wraparound is more involved than a single-direction extension, the second chartered technologist reads the two arms against each other.
If the council raises points, we redraw at no extra charge until the application is decided. Drawings are normally ready around a week after the survey.
Comparing options and boroughs
Boroughs differ on how much garden they will let you cover and how they treat infill on terraces. Pick yours through architectural drawings by area to see local conservation area and Article 4 figures.
Unsure a wraparound is the right shape? Set it beside rear extension drawings or side return extension drawings, or browse the whole range under house extension drawings.
The national rules in figures
| Measure | Value | Period | Source |
|---|---|---|---|
| Class A, para A.1(ja) | Limits apply to the total enlargement (new part plus any existing enlargement it joins) | — | legislation.gov.uk |
| Class A, para A.1(j) | Side extension: single storey, max 4 m high, max half the width of the original house | — | legislation.gov.uk |
| GPDO 2015 Sch 2 Pt 1 Class A, para A.1(f)(i) | 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey | — | legislation.gov.uk |
| Class A, para A.2 | On article 2(3) land (conservation areas etc.): no side extensions, no cladding, no rear extension of more than one storey under Class A | — | legislation.gov.uk |
| Householder: alterations/extensions to a single dwellinghouse, from 1 Apr 2026 | 548 GBP | — | ribblevalley.gov.uk |
| Approved Document L Vol 1 2021, para 10.7(d) | Windows, roof windows, rooflights and doors in an extension should not exceed 25% of the extension floor area plus the area of openings removed or covered | — | gov.uk |
| Party Wall etc. Act 1996 s1(2) | Line-of-junction (new wall) notice at least 1 month before work | — | legislation.gov.uk |
| Party Wall etc. Act 1996 s6(1), s6(2), s6(5) | Adjacent excavation notice at least 1 month before work: within 3 m and deeper than the neighbour's foundations, or within 6 m and cutting a 45° line from their foundations | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Single-storey rear extension: the permitted development limits
The house in section with a rear extension; the dashed lines mark the zone near the boundary.
- A · Depth beyond the original rear wall
- 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey
- B · Maximum height
- 4 m
- C · Within the zone near the boundary
- Eaves no higher than 3 m where within 2 m of the curtilage boundary
- D · Larger extension under prior approval
- 6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSI
What you receive


Where we prepare wraparound extension drawings
London
- Wraparound extension drawings in Barking and Dagenham
- Wraparound extension drawings in Barnet
- Wraparound extension drawings in Bexley
- Wraparound extension drawings in Brent
- Wraparound extension drawings in Bromley
- Wraparound extension drawings in Camden
- Wraparound extension drawings in City of London
- Wraparound extension drawings in Westminster
- Wraparound extension drawings in Croydon
- Wraparound extension drawings in Ealing
- Wraparound extension drawings in Enfield
- Wraparound extension drawings in Greenwich
- Wraparound extension drawings in Hackney
- Wraparound extension drawings in Hammersmith & Fulham
- Wraparound extension drawings in Haringey
- Wraparound extension drawings in Harrow
- Wraparound extension drawings in Havering
- Wraparound extension drawings in Hillingdon
- Wraparound extension drawings in Hounslow
- Wraparound extension drawings in Islington
- Wraparound extension drawings in Kensington and Chelsea
- Wraparound extension drawings in Kingston upon Thames
- Wraparound extension drawings in Lambeth
- Wraparound extension drawings in Lewisham
- Wraparound extension drawings in Merton
- Wraparound extension drawings in Newham
- Wraparound extension drawings in Redbridge
- Wraparound extension drawings in Richmond upon Thames
- Wraparound extension drawings in Southwark
- Wraparound extension drawings in Sutton
- Wraparound extension drawings in Tower Hamlets
- Wraparound extension drawings in Waltham Forest
- Wraparound extension drawings in Wandsworth
Questions
What is a wraparound extension?
It is usually a single-storey extension combining a side infill with a rear extension, so the new space runs around the corner of the house.
Can I build a wraparound under permitted development?
Sometimes, if the combined enlargement stays inside the limits. The test is: Limits apply to the total enlargement (new part plus any existing enlargement it joins). It cannot be used in a conservation area.
How much do wraparound extension drawings cost?
They start at £1,195 including VAT, fixed and published up front. The council's householder fee is £548, paid separately.
What is the rule in a conservation area?
On article 2(3) land (conservation areas etc.): no side extensions, no cladding, no rear extension of more than one storey under Class A. A planning application is the usual route.
How many party wall notices will I need?
It depends on the boundaries touched. A new wall on the line needs this: Line-of-junction (new wall) notice at least 1 month before work. And deep foundations can add a second kind.
Sources and dates
- legislation.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.