020 7864 7245Request a fixed quote

Hackney, London

Building regulations drawings in Hackney

Building regulations drawings in Hackney start at £845 including VAT and show building control how your extension, loft or conversion meets the Building Regulations 2010. Only 18.8 per cent of Hackney households live in a house, so most of this work is to flats and converted terraces, and our sets are drawn for exactly that.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Two-storey rear extension under construction on a semi-detached house

    Where Hackney's planning constraints stop and building control starts

    Hackney publishes 37 conservation areas and 77 Article 4 directions, mapped as 197 separate areas. Those layers decide whether you need planning permission and how far the street elevation may change. They do not decide whether the beams, insulation and escape routes comply. The Building Regulations apply to the same job whether or not the street is protected.

    The two approvals can still pull against each other. A terrace may have to keep its front elevation as it is, while the walls, windows and roof behind it must still meet the energy rules. Historic England lists 555 entries in the borough, and for a listed house Approved Document L allows special consideration of historic fabric. Insulation then becomes a judgement, not a formula, and we note the reasoning on the sheets so the examiner can see why a wall is built as it is.

    The council also publishes a Retrofit SPD for upgrading existing homes. It is a planning document, not a building control one, but the two meet at the build-up of the wall and roof. We draw those details so that they answer both.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for Hackney

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas37 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions77 Article 4 directions published by the council—planning.data.gov.uk
    Article 4 direction areas197 Article 4 direction area polygons published by the council—planning.data.gov.uk
    Listed building entries555 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Households living in a house18.8 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households24.6 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Householder decisions415 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted84.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time91.3 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Average price, terraced960,633 GBP2026-07publicdata.landregistry.gov.uk
    Mayoral CIL rate (indexed)72.73 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk
    Building Regulations 2010 reg 16(1)Give notice of intention to start; work may start 2 days after the notice—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hackney
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Flats and converted houses: what the set has to show

    Just 24.6 per cent of Hackney households own their home, and most live in flats. A typical brief is therefore a ground-floor flat with a rear extension, or a top-floor flat with a loft, inside a converted house.

    In a flat the structure is shared. A new beam bears on a wall that someone else relies on, and a floor you alter may be the ceiling of the neighbour below. The drawings show the bearings, the fire separation, the sound insulation under Part E and the route out through the shared hall, so the freeholder's surveyor and building control can read the same answer.

    For these jobs we prepare a full plans application. It lets the examiner raise questions about shared escape routes and party structure before anyone starts demolition, which is much cheaper than finding them with the ceiling open.

    Timings and notices for a Hackney project

    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Planning, where you need it, comes first: Hackney decided 415 householder applications in its latest year, granted 84.6 per cent and decided 91.3 per cent on time. Because the design can change at planning stage, we usually wait for that decision before finalising the technical set.

    Once the full plans application is decided, building control must be told before you start: Give notice of intention to start; work may start 2 days after the notice. Commencement and completion each have their own notice, and a missed one can hold up the completion certificate, which a buyer's solicitor will ask for later.

    Lofts, rear additions and retrofit on Hackney terraces

    A Hackney terraced house averages £960,633 in the latest index, and a flat £524,885. With that much value in the walls, the details matter: a loft over a two-storey house needs a protected stair and fire-resisting doors, a rear extension needs foundations that respect the old ones, and every new opening needs a lintel the engineer has checked.

    We work alongside your engineer so their structural calculations in Hackney and our sheets show the same sizes. Where a home energy rating is needed, the SAP calculations in Hackney are coordinated with the wall and roof build-ups we draw.

    What you receive and what it costs

    A Hackney set normally has foundation and floor plans, sections, junction details at larger scale, a drainage layout and a written specification. Building regulations drawings start at £845 with VAT included, fixed before you commit. A second chartered technologist checks every sheet before it leaves us, so your builder and your freeholder see one consistent set. If the examiner raises points we revise the sheets at no extra charge.

    The handover pack also flags the levy. Hackney sits in band 2 of the Mayor's scheme at £72.73 per square metre, and the borough's own Hackney CIL Charging Schedule adds a zoned rate on top. Our construction drawings in Hackney carry the same set on to site detail for your builder.

    Related services and neighbouring boroughs

    If the job needs permission first, start with planning drawings in Hackney, or read the borough overview at architectural drawings in Hackney. Over the border, the same service is described for Islington and Haringey.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need building regulations drawings for a flat in Hackney?

    Yes, for any structural alteration, extension, loft conversion or change to the layout that affects escape or drainage. In a flat the set also has to deal with shared structure and sound between homes.

    Does a Hackney conservation area change the Building Regulations?

    No. Conservation areas and Article 4 directions affect planning, not building control. They can affect the design, though, because the front of the house may have to stay as it is while the rest must still comply.

    How long does building control take to decide a full plans application?

    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Allow some slack for questions and revisions.

    How much do building regulations drawings cost in Hackney?

    From £845 including VAT, fixed up front. Building control charges are separate.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.