020 7864 7245Request a fixed quote

Building regulations

Electrical design drawings in London

Electrical design drawings show how power reaches every room of a house: the consumer unit, the circuits, the lighting, the charge point and any solar panels. We prepare them for London extensions, conversions and new builds, so your electrician quotes against a plan and not a guess. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Brick house being extended, with a wide new opening supported over the ground floor

    What electrical design drawings are for

    A builder can fit sockets without a drawing, but nobody can price a rewire, check a circuit load or plan a kitchen island without one. The drawing turns a wish list into a defined job.

    Ours show where each outlet, switch and light sits, which circuit feeds it, and how the circuits are grouped at the consumer unit. A schedule lists the fittings once, so quantities in the quote match the plan. Because we draw into the same model as the walls, a cable that would cross a beam is flagged before it is buried in plaster.

    The drawings are the electrical part of a wider package. Our M&E drawings add ventilation to the same sheets, while building services design looks at how every system fits the house.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Part P: the safety rules behind the layout

    Part P of the Building Regulations is the electrical safety requirement for dwellings, and Approved Document P (edition: 2013 edition; takes effect 6 Apr 2013) lists the work that has to be notified: new circuit; consumer unit replacement; additions or alterations to circuits in a special location.

    A certificate for notifiable work must be given within 30 days of completion, by the registered installer or the building control body. That is the electrician's duty, and our drawings do not stand in for the certificate.

    What we add is advance information. If the plan shows the new circuit, its protection and the special locations such as bathrooms, the installer can prepare the notification without redesigning on the day.

    Lighting, and the efficiency figure it must meet

    Fixed lighting has a minimum efficacy under Approved Document L. The current edition asks for 75 lumens per circuit watt, and the later edition raises it to 105.

    In practice that means LED fittings throughout, and the lighting schedule on our sheet names each type against the figure. Dimmers, scenes and feature lighting are drawn as separate circuits, so a fault in one does not darken the house.

    Charge points and solar panels

    A new dwelling with parking needs a charge point. Approved Document S defines it as a universal (untethered) socket, BS EN 61851 with a nominal output of at least 7 kW. We draw the position, the cable route from the consumer unit and the spare way reserved for it.

    The newest energy guidance adds a solar target for new homes. The calculation assumes panels covering 40 per cent of the ground floor area, rated at 0.22 kW peak per square metre, facing south-east to south-west at a pitch of 45 degrees.

    Those are assumptions for the notional calculation, not a design you must copy. We use them to size the inverter position, the isolator and the roof cable route, and we say plainly where a real roof differs.

    Price, scope and what we do not do

    There is no published starting price for electrical design drawings. A one-room extension and a whole-house rewire are far apart in scope, so we run a free constraints check, agree what you need and give a fixed quote.

    We draw and schedule the work. We do not install, test or certify, and we do not replace an installer's calculations for loads, cable sizing or fault levels. If a project needs an electrical specialist beyond a domestic scope, the quote names who covers it.

    Because the drawings stay in the model, later changes such as a moved kitchen are updated once and carried through every sheet.

    A good brief helps. Tell us how you cook, where the television goes, whether anyone works from home and what you plan to charge or run in the garden. Those answers decide how many circuits the house needs and where the spare ways should be, and they are cheap to settle now and expensive to chase after plastering.

    Where electrical drawings fit in the sequence

    Rewires and extensions behave differently. In an old house the first task is learning what exists, so we mark the existing consumer unit, the age of the wiring where it is known and anything that looks unsafe, and we say what we could not see. A new extension is simpler: the circuit is drawn from the unit to the room and the loads are added up.

    We start once the layout is stable, so sockets are not drawn twice. A second technologist checks each sheet, and the set is cross-checked against the architectural plans: no switch behind a door, no light centred on a beam.

    The sheets then join the technical set sent to building control and your contractor. The building regulations drawings page describes how that wider package is assembled. Where heating and hot water are also being redesigned, the MEP design service covers them in the same model.

    Electrical design drawings by borough

    Electrical work is national, but access to a house is local. Listed and conservation-area buildings restrict visible external items such as meter boxes, cameras and outdoor lighting, and Article 4 directions can bring small alterations under control. Our council pages list the designations that apply in each borough.

    Start with the borough where the house stands. Architectural drawings in Westminster shows the format, and architectural drawings by area lists every place we cover.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    AD P (2013), 'Main changes in the 2013 edition', PDF p.22013 edition; takes effect 6 Apr 2013—gov.uk
    Building Regulations 2010 reg.12(6A) and (9); AD P (2013) para 2.5, PDF p.14new circuit; consumer unit replacement; additions or alterations to circuits in a special location—legislation.gov.uk
    AD P (2013) paras 3.4, 3.6 and 3.730 days—gov.uk
    AD L Vol 1 (2021 incl 2023) para 6.58, PDF p.60; AD L Vol 1 (2026) paras 5.57 and 5.59, PDF p.6575 lm/W—gov.uk
    AD L Vol 1 (2021 incl 2023) para 6.58, PDF p.60; AD L Vol 1 (2026) paras 5.57 and 5.59, PDF p.65105 lm/W—gov.uk
    AD S (2021) para 6.2, PDF p.35universal (untethered) socket, BS EN 61851 kW—gov.uk
    AD S (2021) para 6.2, PDF p.357 kW—gov.uk
    AD L Vol 1 (2026) para 5.73(a) and equation 5.1, PDF p.6740—gov.uk
    AD L Vol 1 (2026) para 5.73(a) and equation 5.1, PDF p.670.22—gov.uk
    AD L Vol 1 (2026) para 5.73(a) and equation 5.1, PDF p.67south-east to south-west—gov.uk
    AD L Vol 1 (2026) para 5.73(a) and equation 5.1, PDF p.6745—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Two-storey rear extension under construction on a semi-detached house
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    What are electrical design drawings?

    They are plans showing the outlets, switches, lighting, circuits and consumer unit of a building, with a schedule of fittings. An electrician uses them to price and install the work.

    How much do electrical design drawings cost?

    Fixed quote after a free constraints check. The price depends on the size of the project and how much of the electrics is changing.

    How long does an electrician have to certify notifiable work?

    Approved Document P says 30 days from completion. The installer or building control body issues the certificate.

    Do new homes need an electric vehicle charge point?

    New dwellings with associated parking do. Approved Document S sets a nominal output of at least 7 kW.

    Do you install the electrics?

    No. We design and draw. A qualified electrician fits, tests and certifies the installation.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.