020 7864 7245Request a fixed quote

Islington, London

Building regulations drawings in Islington

Building regulations drawings in Islington start at £845 including VAT. In a borough where most homes are flats and most streets are Georgian or Victorian, the technical set is mainly about three things: tying new structure into old brick, keeping fire and sound apart between households, and getting a basement or loft past an examiner who has seen the same problems on the next street.

From £845 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on building regulations drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    Georgian terraces, basements and the Islington technical set

    Islington has 41 conservation areas and 1,050 listed entries, of which 1,002 are Grade II. Planning decides what may change on the outside. Building control decides whether the inside works, and in a listed terrace the two meet at the party wall, the chimney breast and the original floor structure.

    The council publishes a Basement Development SPD and an Islington Urban Design Guide SPD, and the Local Plan adopted in 2,023 sets the overall policy. Those documents govern permission. For construction we turn them into sheets: the retaining wall and tanking detail, the sump or pump for water that finds its way in, the light-well guarding and the escape from a lowered floor. A basement set has to show how water, fire and structure are each handled, and we draw all three as separate sections rather than one crowded cut.

    Old London stock brick laid in lime mortar behaves differently from modern masonry. We specify breathable repairs where the wall is exposed, show where the new beam bears on an existing pier, and note that the structural calculation, not the drawing, sets the beam size. Our structural calculations in Islington page describes that side.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Islington

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas41 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries1,050 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Grade II listed entries1,002 list entries—planning.data.gov.uk
    Local plan adopted2,023—islington.gov.uk
    Households living in a house16.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households26.7 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Householder decisions337 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted92.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time98.8 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Borough CIL residential rate£300/m² (Zone A); £250/m² (Zone B) — residential dwellings, Use Classes C3 and C4schedule rate (approved 26 June 2014, effective 1 September 2014)islington.gov.uk
    Average price, terraced1,151,398 GBP2026-07publicdata.landregistry.gov.uk
    Building Regulations 2010 reg 14A(6)Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Islington
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Flats, shared stairs and party structure

    Only about 16.3 per cent of Islington households live in a house or bungalow, and just 26.7 per cent own the home outright or with a mortgage. Many of our clients are therefore upper-floor owners, freeholders of converted buildings or landlords. That changes the technical emphasis. Part B asks how a fire in the flat below reaches the common stair, Part E asks how footsteps and speech cross the floor, and an internal alteration may involve a lease that needs the freeholder's consent.

    We draw the fire-resisting construction, door ratings and smoke detection route in plain symbols and a short schedule, and we mark each sound-insulation floor build-up with its layers. If you are splitting a house into flats, see flat conversion drawings in Islington for the planning side as well.

    For a small kitchen or bathroom move, the drainage plan is the item that most often causes delay, because a stack in an old building may not sit where a new appliance wants it. We show falls, access and ventilation of every soil pipe.

    What the clock allows

    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing. Notices follow the same pattern for every borough: Notify commencement within 5 days after work is regarded as commenced, and Notify completion within 5 days of completing the work. Because a Georgian house may have a surprise behind each wall, we recommend full plans, so that opening-up findings can be absorbed through a revised sheet and not an argument on site.

    How Islington decides, and what it charges

    Islington decided 337 householder applications in its latest recorded year, granting 92.6 per cent, with 98.8 per cent decided in time. A high grant rate does not mean a light touch: officers read the rear elevation and the roof closely, and our technical set has to match the drawing that was approved.

    The borough's London Borough of Islington Community Infrastructure Levy (CIL) Charging Schedule charges £300/m² (Zone A); £250/m² (Zone B) — residential dwellings, Use Classes C3 and C4 for new residential floor area, plus the Mayor's £96.97 per square metre in band 1. An average terraced home sells for about £1,151,398, so a technical error on a loft or rear extension is expensive to unwind.

    Our fee starts at £845 with VAT included. A second chartered technologist reviews each sheet, and any revision requested by the examiner is free.

    Linked services and nearby boroughs

    If permission is still to be sought, start with planning drawings in Islington. When the builder wants every junction in detail, the next step is construction drawings in Islington. The same technical service is described for Camden, Hackney and Haringey, and our overview of architectural drawings in Islington lists everything else we draw here.

    Loft and rear additions on a terrace

    A rear addition or a loft on an Islington terrace is usually a modest floor area built into a tight plot. The technical set therefore concentrates on the small things that an examiner checks on cramped sites: where the new drain meets the shared run, how the flat roof edge is finished against a neighbour's wall, and how the new stair is lit and ventilated when there is no outside wall to borrow.

    We draw the roof as a layered section with the insulation, vapour control and ventilation shown at each layer, and we give the thermal values in a table the examiner can tick off. Most delays come from a missing detail, not a wrong design, and the checklist at the foot of each sheet is how we avoid them.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Two-storey rear extension under construction on a semi-detached house
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need building regulations drawings for a basement in Islington?

    Yes. Excavation and underpinning need approval for structure, waterproofing, fire escape and ventilation, and the council's basement guidance sits alongside that.

    Can a leaseholder submit building regulations drawings for a flat?

    Yes, if the work is within the flat, but the lease may require the freeholder's written consent first. We ask for the lease early.

    Who checks fire separation between flats?

    Building control checks it on the drawings and on site. We show each fire-resisting floor and door on a schedule.

    What do building regulations drawings cost in Islington?

    From £845 including VAT, with the price fixed before we start.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.