020 7864 7245Request a fixed quote

Planning

Change of use drawings in London

Whether a change of use needs planning permission, prior approval or nothing depends on the use class you start in and the one you want. We draw change of use applications for London buildings from £895 including VAT, and our first job is to tell you which route applies, before you spend on anything else.

From £895 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on change of use drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    When a change of use needs permission

    Planning law sorts uses into classes. Changing within a class generally needs no application, while changing between classes is development and may. So the opening question on every job is the same three-part one: what is the lawful use today, what do you want it to become, and which route links the two?

    One conversion is always development, and it explains most house-to-flats projects. Using a single dwellinghouse as two or more dwellinghouses is a material change of use. That is why splitting a house cannot be done under permitted development and needs a full application.

    The reverse trap catches landlords. Letting rooms to unrelated tenants can move a family home into another class, and the council's view of when that happened may differ from yours. We check this before drawing anything.

    Brick cottage with a tiled roof, chimneys and a front dormer window

    Houses and small HMOs: Class C3 against Class C4

    The two classes are defined narrowly. Class C3 means: Dwellinghouse use by a single household, or up to six residents living together as a single household. Class C4 means: Small HMO: a dwellinghouse used by not more than six residents as an HMO (Housing Act 2004 s254).

    Moving between them follows a simple rule with a catch: C3 to C4 (and back) is permitted development unless removed by an Article 4 direction. Because councils can make that direction for part or all of their area, the address decides your route, not the general law. Architectural drawings in Camden shows how a council page sets out its local position.

    Anything bigger than a small HMO, and any conversion into self-contained flats, sits outside that permitted route and needs an application. Our HMO conversion drawings and flat conversion drawings pages deal with those schemes.

    Shops and offices to homes under Class MA

    Class MA is the route for turning commercial premises into homes without a full application. The rule is Class E to C3 by prior approval after 2 years' continuous Class E use. The council has 56 days to decide, and no date is ever promised to you.

    Prior approval is narrow. The council can look only at the matters the Order lists, such as flood risk, transport and the effect on neighbouring uses, and it cannot reopen whether homes are acceptable in principle. Our prior approval drawings page walks through what a complete submission needs.

    Check the building's history early. A shop that has stood empty or a unit split between uses can fail the continuous-use test even when it looks like a shop from the pavement.

    Space and sound: the limits that shape the layout

    Two standards limit what a building can become. For space: Homes created under PD must meet the nationally described space standard. That sets minimum floor areas by bedroom count, so the number of flats a building can hold is a design question long before it is a planning one.

    For sound, Approved Document E sets the targets for homes formed by a change of use: Separating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use. Older buildings frequently need extra layers in party floors, which costs ceiling height.

    We test every unit against both standards on the survey, before layouts are shown, so you do not choose an option that fails later.

    What a change of use set includes

    The contents follow the route. A full application needs location and block plans, existing and proposed layouts, elevations and sections, and the floor area of each unit marked against the space standard. Prior approval needs the particular details the Order lists.

    Areas and dimensions are modelled once in Revit, so every sheet quotes the same figures. A second chartered technologist checks each unit against the space standard, and the set normally follows the survey within about a week. If the scheme also changes how a lease is drawn, our lease plans service supplies those plans.

    What the council charges

    To change a building to separate dwellinghouses the fee is £610 for each dwelling in a scheme of not more than ten. Other changes of use of a building or land carry a fee of £610. The council collects these sums itself, on top of our price.

    The right figure depends on the route and the number of homes, so we confirm it from the fee table before you commit.

    Why change of use applications fail

    The commonest failure is lawful use. If the current class cannot be shown, the officer cannot say what is changing. We gather planning history and, where needed, evidence of established use before any drawing starts. Where use is uncertain, a lawful development certificate can settle it first.

    Other avoidable problems include rooms under the space standard, no bin or cycle storage and poor outlook from ground-floor flats. We design these out from the first sketch, not at the validation stage.

    The national rules in figures

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Use Classes Order 1987 Sch 1 Pt C, Class C3Dwellinghouse use by a single household, or up to six residents living together as a single household—legislation.gov.uk
    Use Classes Order 1987 Sch 1 Pt C, Class C4Small HMO: a dwellinghouse used by not more than six residents as an HMO (Housing Act 2004 s254)—legislation.gov.uk
    TCPA 1990 s55(3)(a)Using a single dwellinghouse as two or more dwellinghouses is a material change of use—legislation.gov.uk
    GPDO Sch 2 Pt 3 Class LC3 to C4 (and back) is permitted development unless removed by an Article 4 direction—legislation.gov.uk
    Sch 2 Pt 3 Class MA, para MA.1(1)(b)Class E to C3 by prior approval after 2 years' continuous Class E use—legislation.gov.uk
    Sch 2 Pt 3 para W(11)(c)56 days—legislation.gov.uk
    Change of use of a building to one or more separate dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026610 GBP per dwelling—ribblevalley.gov.uk
    Other changes of use of a building or land, from 1 Apr 2026610 GBP—ribblevalley.gov.uk
    GPDO 2015 art 3(9A)Homes created under PD must meet the nationally described space standard—legislation.gov.uk
    Approved Document E 2003 incl. 2015, Table 0.1aSeparating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    Do I need planning permission to change use?

    It depends on the use classes involved. Some changes need an application, some prior approval and some nothing. Splitting a house into flats is always a material change of use. We confirm the route in the constraints check.

    Can I turn a family house into an HMO without planning permission?

    Moving between Class C3 and Class C4 is permitted development unless an Article 4 direction removes the right. The address decides.

    How long does a Class MA decision take?

    The council has 56 days. We cannot promise a decision date.

    How much does the council charge for converting to homes?

    £610 per dwelling for schemes of not more than ten homes, paid to the council. Our drawings start at £895 including VAT.

    Do new homes have to meet a space standard?

    Yes. Homes created under PD must meet the nationally described space standard. We test each unit before showing you layouts.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.