Planning
Change of use drawings in London
Whether a change of use needs planning permission, prior approval or nothing depends on the use class you start in and the one you want. We draw change of use applications for London buildings from £895 including VAT, and our first job is to tell you which route applies, before you spend on anything else.
From £895 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on change of use drawings
Seven steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
When a change of use needs permission
Planning law sorts uses into classes. Changing within a class generally needs no application, while changing between classes is development and may. So the opening question on every job is the same three-part one: what is the lawful use today, what do you want it to become, and which route links the two?
One conversion is always development, and it explains most house-to-flats projects. Using a single dwellinghouse as two or more dwellinghouses is a material change of use. That is why splitting a house cannot be done under permitted development and needs a full application.
The reverse trap catches landlords. Letting rooms to unrelated tenants can move a family home into another class, and the council's view of when that happened may differ from yours. We check this before drawing anything.

Houses and small HMOs: Class C3 against Class C4
The two classes are defined narrowly. Class C3 means: Dwellinghouse use by a single household, or up to six residents living together as a single household. Class C4 means: Small HMO: a dwellinghouse used by not more than six residents as an HMO (Housing Act 2004 s254).
Moving between them follows a simple rule with a catch: C3 to C4 (and back) is permitted development unless removed by an Article 4 direction. Because councils can make that direction for part or all of their area, the address decides your route, not the general law. Architectural drawings in Camden shows how a council page sets out its local position.
Anything bigger than a small HMO, and any conversion into self-contained flats, sits outside that permitted route and needs an application. Our HMO conversion drawings and flat conversion drawings pages deal with those schemes.
Shops and offices to homes under Class MA
Class MA is the route for turning commercial premises into homes without a full application. The rule is Class E to C3 by prior approval after 2 years' continuous Class E use. The council has 56 days to decide, and no date is ever promised to you.
Prior approval is narrow. The council can look only at the matters the Order lists, such as flood risk, transport and the effect on neighbouring uses, and it cannot reopen whether homes are acceptable in principle. Our prior approval drawings page walks through what a complete submission needs.
Check the building's history early. A shop that has stood empty or a unit split between uses can fail the continuous-use test even when it looks like a shop from the pavement.
Space and sound: the limits that shape the layout
Two standards limit what a building can become. For space: Homes created under PD must meet the nationally described space standard. That sets minimum floor areas by bedroom count, so the number of flats a building can hold is a design question long before it is a planning one.
For sound, Approved Document E sets the targets for homes formed by a change of use: Separating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use. Older buildings frequently need extra layers in party floors, which costs ceiling height.
We test every unit against both standards on the survey, before layouts are shown, so you do not choose an option that fails later.
What a change of use set includes
The contents follow the route. A full application needs location and block plans, existing and proposed layouts, elevations and sections, and the floor area of each unit marked against the space standard. Prior approval needs the particular details the Order lists.
Areas and dimensions are modelled once in Revit, so every sheet quotes the same figures. A second chartered technologist checks each unit against the space standard, and the set normally follows the survey within about a week. If the scheme also changes how a lease is drawn, our lease plans service supplies those plans.
What the council charges
To change a building to separate dwellinghouses the fee is £610 for each dwelling in a scheme of not more than ten. Other changes of use of a building or land carry a fee of £610. The council collects these sums itself, on top of our price.
The right figure depends on the route and the number of homes, so we confirm it from the fee table before you commit.
Why change of use applications fail
The commonest failure is lawful use. If the current class cannot be shown, the officer cannot say what is changing. We gather planning history and, where needed, evidence of established use before any drawing starts. Where use is uncertain, a lawful development certificate can settle it first.
Other avoidable problems include rooms under the space standard, no bin or cycle storage and poor outlook from ground-floor flats. We design these out from the first sketch, not at the validation stage.
The national rules in figures
| Measure | Value | Period | Source |
|---|---|---|---|
| Use Classes Order 1987 Sch 1 Pt C, Class C3 | Dwellinghouse use by a single household, or up to six residents living together as a single household | — | legislation.gov.uk |
| Use Classes Order 1987 Sch 1 Pt C, Class C4 | Small HMO: a dwellinghouse used by not more than six residents as an HMO (Housing Act 2004 s254) | — | legislation.gov.uk |
| TCPA 1990 s55(3)(a) | Using a single dwellinghouse as two or more dwellinghouses is a material change of use | — | legislation.gov.uk |
| GPDO Sch 2 Pt 3 Class L | C3 to C4 (and back) is permitted development unless removed by an Article 4 direction | — | legislation.gov.uk |
| Sch 2 Pt 3 Class MA, para MA.1(1)(b) | Class E to C3 by prior approval after 2 years' continuous Class E use | — | legislation.gov.uk |
| Sch 2 Pt 3 para W(11)(c) | 56 days | — | legislation.gov.uk |
| Change of use of a building to one or more separate dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026 | 610 GBP per dwelling | — | ribblevalley.gov.uk |
| Other changes of use of a building or land, from 1 Apr 2026 | 610 GBP | — | ribblevalley.gov.uk |
| GPDO 2015 art 3(9A) | Homes created under PD must meet the nationally described space standard | — | legislation.gov.uk |
| Approved Document E 2003 incl. 2015, Table 0.1a | Separating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
What you receive


Questions
Do I need planning permission to change use?
It depends on the use classes involved. Some changes need an application, some prior approval and some nothing. Splitting a house into flats is always a material change of use. We confirm the route in the constraints check.
Can I turn a family house into an HMO without planning permission?
Moving between Class C3 and Class C4 is permitted development unless an Article 4 direction removes the right. The address decides.
How long does a Class MA decision take?
The council has 56 days. We cannot promise a decision date.
How much does the council charge for converting to homes?
£610 per dwelling for schemes of not more than ten homes, paid to the council. Our drawings start at £895 including VAT.
Do new homes have to meet a space standard?
Yes. Homes created under PD must meet the nationally described space standard. We test each unit before showing you layouts.
Sources and dates
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.