020 7864 7245Request a fixed quote

Harrow, London

M&E drawings in Harrow

Most Harrow households live in a house rather than a flat. The services question is usually how much more the house can take: another bathroom, a loft, an outbuilding. We prepare M&E drawings for Harrow homes that show ventilation, circuits and alarms, and flag the borough's flood and drainage rules before they hold up a project. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on m&e drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Harrow's validation checklist and M&E drawings in Harrow

    Harrow's national and local validation checklist is short on energy for small schemes and firm on drainage. For energy, an assessment is required for each major development, and the council's list notes that major residential must reach Major: zero carbon. A householder project is outside that. Where a design and access statement is needed, the list says it should cover the energy hierarchy, drainage and water efficiency, and an M&E drawing is good evidence for the energy part.

    The drainage row is the one that reaches ordinary houses. A site-specific flood risk assessment is required in mapped flood zones and in any Critical Drainage Area, and a surface-water drainage strategy must be set out inside it for all new development, including a single dwelling. The target is 5 l/s/ha greenfield from impermeable areas, which is a tight figure for a house on a modest plot.

    In practice that means a rear extension or a new outbuilding in a drainage-sensitive street needs an attenuation or soakaway solution shown on the drawing. We draw the route and any pump or inspection chamber on the M&E sheet, and mark the electrical supply the pump needs.

    Two-storey rear extension under construction on a semi-detached house

    Local figures for Harrow

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Energy Assessment required for each major development (London Plan energy hierarchy, carbon reduction targets, on-site first then off-set); the list says major residential must achieve zero carbon since 1 October 2016. Design and Access Statement must cover the energy hierarchy, SuDS and water efficiency.Major: zero carbon—harrow.gov.uk, Harrow National and Local Validation Checklist of Planning Applications (1 February 2024), pdf pp.15-16, row 'Energy Assessment'; D&AS row p.7
    Site-specific FRA required in mapped flood zones 2 and 3, EA surface-water 1-in-30 and 1-in-100 extents, sites of 1 ha or more in flood zone 1, and any Critical Drainage Area. A surface water drainage strategy must be set out within the FRA for all new development including a single dwelling, with SuDS reducing discharge to a greenfield rate of 5 l/s/ha from impermeable areas.5 l/s/ha greenfield—harrow.gov.uk, Harrow National and Local Validation Checklist of Planning Applications (1 February 2024), pdf pp.17-18, row 'Flood Risk Assessment (FRA)'
    Conservation areas31 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries295 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Green Belt share of the council area22 % of council area covered by green-belt polygons—planning.data.gov.uk
    Households living in a house65.4 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted81.7 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Average price, semi-detached663,954 GBP2026-07publicdata.landregistry.gov.uk
    AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.1731 l/s—gov.uk
    AD S (2021) para 6.2, PDF p.357 kW—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Harrow
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Suburban houses, extensions and the services they carry

    65.4 per cent of Harrow's 89,642 households live in a house and 58.8 per cent own their home. Semi-detached houses average about £663,954, and detached ones about £1,206,272. Typical projects are a side return, a loft, a garage conversion, sometimes all three.

    Every added room changes the whole-dwelling ventilation rate. A three-bedroom house needs 31 l/s, and a four-bedroom one needs 37 l/s. Converting a garage and adding a bedroom therefore changes the target, and we recalculate it on the plan, not leave it to the fan supplier.

    Older semis often have a consumer unit with too few ways. We record what is there and show the new circuits for the extension, a possible charge point and any outside power. We also mark the smoke alarm positions on every floor, interlinked, so that a loft conversion does not leave the new top floor outside the alarm system.

    A garage conversion deserves its own line. The room loses its vehicle door, gains a habitable use and often needs a new consumer unit feed, a smoke alarm linked to the house and a ventilation route through a former garage wall. We draw those at the same time as the architectural plan, so the wall is built once and the duct sleeve is already in it.

    Heritage, Green Belt and where services can go

    Harrow has 31 conservation areas and 295 listed building entries. About 22 per cent of the borough is Green Belt, and an outbuilding with its own supply there raises a planning question as well as a services one. We check each address on the council's own map before quoting.

    External services in a conservation area need care. A flue or heat-pump unit on a visible elevation draws attention, and we place plant at the back or inside where the building allows. Our architectural drawings in Harrow page covers the elevations and the planning side.

    In its latest year the council decided 917 householder applications and granted 81.7 per cent. A drawing set that answers the drainage and energy questions at validation helps avoid delays.

    What we issue for a Harrow project

    The set includes a power and lighting plan for each floor, a ventilation plan with each fan's duty, a consumer unit schematic and an alarm layout. Bathrooms are set at 15 l/s and utility rooms at 30 l/s, shown beside each fan.

    The rest is coordination. We cross-check the M&E sheets against the structural layout, so no duct runs through a beam and no socket lands where a radiator is shown.

    Where a charge point is added, the nominal output is at least 7 kW for a new dwelling, and the cable route is on the sheet. The set goes to building control with our building regulations drawings. For heating and hot-water design behind the layouts, see MEP design.

    Send us your plans and the address. We run a free constraints check and give a fixed quote.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    House extension under construction with scaffolding, new glazed doors and building materials
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does Harrow need a flood risk assessment for a house extension?

    Only in mapped flood zones, surface-water extents and Critical Drainage Areas. We check your address against the council's maps before we quote.

    Do M&E drawings help with the Harrow design and access statement?

    They are useful evidence for the energy and services part, because they show where plant and ventilation go.

    How much are M&E drawings in Harrow?

    Fixed quote after a free constraints check, based on the rooms and systems.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.