020 7864 7245Request a fixed quote

Kensington and Chelsea, London

M&E drawings in Kensington and Chelsea

M&E drawings in Kensington and Chelsea cover the ventilation, power, alarm and drainage layouts for stuccoed terraces, mansion flats and the basements beneath them. Only 17 per cent of households live in a house, so a typical job is a flat or a tall townhouse with limited outside space for plant. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on m&e drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    Royal Borough rules that shape M&E drawings in Kensington and Chelsea

    Three Royal Borough documents reach services design. The submission requirements list asks for an energy strategy at the scope Majors only, so a house refurbishment is not asked for one, although a larger scheme is. We design every home as though the question might come.

    The adopted Local Plan is stricter on summer heat. The overheating policy applies to All developments: each scheme must reduce overheating risk and reliance on air conditioning by following the cooling hierarchy, using the GLA early-stage overheating risk tool, and meeting Part O for new homes. In a mansion flat with large south glazing, we therefore show shading, a night purge fan and a mechanical supply route before any condenser is placed on a rear elevation.

    The Basements Supplementary Planning Document is the third piece, and it is specific. Its drainage section says SuDS must be provided in all basements, and the test is 1 m soil; minors 50% run-off cut. A basement in the borough is usually dug under a house with a small garden, so the sheet shows the soil strip, the pump chamber, the non-return valve and the electrical supply to both.

    The result is a services sheet that doubles as the reference for the sustainability statement. The fans, the cooling choices, the pump and the soil strip are each placed once, and the same drawing then goes to the consultant, the installer and building control.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Kensington and Chelsea

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Validation list: Energy Strategy required for major applications (London Plan SI2/SI3, Local Plan CE1; the 2024 Local Plan numbers energy policy GB4); Sustainability Statement for majors; BREEAM certified assessment for non-residential majors.Majors only—rbkc.gov.uk, RBKC Submission Requirements for Planning Applications (10 March 2023), p.13 (row Energy Strategy); Note 33, p.43
    Local Plan Policy GB5: all developments must minimise overheating risk and reduce reliance on air conditioning following the London Plan cooling hierarchy, demonstrated in an energy strategy/assessment; applicants to use the GLA early-stage overheating risk tool and follow the Mayor's Energy Assessment Guidance (June 2022); Part O of the Building Regulations applies to new homes.All developments—rbkc.gov.uk, RBKC Local Plan 2024 (adopted July 2024), Policy GB5 A (printed p.138); paras 4.52-4.60 (pp.138-139)
    Basements SPD section 9: SuDS must be provided in all basements; 1 m of permeable soil connected to the unaffected garden satisfies it, otherwise show SuDS location and dimensions on drawings and submit a report on type, run-off mitigated and maintenance, while still providing the 1 m of soil. Validation list: SuDS details under CE2; major schemes greenfield rates, minor schemes 50% reduction of existing run-off; SuDS pro-forma for majors.1 m soil; minors 50% run-off cut—rbkc.gov.uk, RBKC Basements Supplementary Planning Document (April 2016), Section 9, paras 9.1-9.3 (p.49); validation list Note 32 (p.42 of the list)
    Households living in a house17 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Average price, terraced2,429,086 GBP2026-07publicdata.landregistry.gov.uk
    Average price change over 12 months-14.1 %12 months to 2026-07publicdata.landregistry.gov.uk
    Owner-occupied households31.7 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Conservation areas39 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries1,350 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Grade II* listed entries116 list entries—planning.data.gov.uk
    Article 4 directions84 Article 4 directions published by the council—planning.data.gov.uk
    Registered parks and gardens16 registered parks and gardens intersecting the LPA boundary (Historic England)—planning.data.gov.uk
    Tree preservation orders4,560 tree preservation orders published by the council—planning.data.gov.uk
    Householder decisions664 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted93.7 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time91.9 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Lawful development certificate applications (PS1)25 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.130 l/s—gov.uk
    AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.115 l/s—gov.uk
    AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.1743 l/s—gov.uk
    AD J (2010 incl 2022) requirement J3; paras 2.34-2.36, PDF p.43; para 3.43, PDF p.57BS EN 50291-1:2018—gov.uk
    AD J (2010 incl 2022) requirement J3; paras 2.34-2.36, PDF p.43; para 3.43, PDF p.57300—gov.uk
    Building Regulations 2010 reg.12(6A) and (9); AD P (2013) para 2.5, PDF p.14new circuit; consumer unit replacement; additions or alterations to circuits in a special location—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Kensington and Chelsea
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Townhouses, mansion flats and what they cost to rework

    The average terraced house in the borough sold for £2,429,086. After finishes, a rework is a very expensive mistake at that value. Prices moved by -14.1 per cent over twelve months, but owners are improving homes they intend to keep.

    With owner-occupiers at 31.7 per cent of households, many projects involve a freeholder, a managing agent or a Residents' Association. We keep the M&E set tidy enough to attach to a licence application: each penetration, riser and plant location is labelled.

    Mansion blocks bring a different problem: shared flues, shared risers and lease clauses that limit what an owner may drill. Before any layout we read the lease plan and the building services history if the managing agent has them, and we draw a riser schedule that states which route each new duct or cable takes and whether it uses an existing opening.

    Listed homes, Article 4 areas and trees

    The borough has 39 conservation areas, 1,350 listed building entries and 116 at Grade II*. There are 84 Article 4 directions, 16 registered parks and gardens and 4,560 tree preservation orders. External plant, flue terminals and louvres on a front or garden elevation are the items most likely to be refused, so the drawings put them in lightwells, closets and rear returns.

    Inside a listed building, chasing a cable or cutting an extract through a plaster ceiling touches historic fabric. We mark every penetration on the plan so the heritage statement can describe it and the officer can see it was thought through.

    Trees complicate cable routes in garden squares and rear gardens. A drain or duct trench cut through a root zone can damage a protected tree, so the layout keeps to existing hard surfaces where it can and shows root protection areas when the arboricultural report supplies them.

    Planning figures in context

    The council decided 664 householder applications in its latest year, granted 93.7 per cent and decided 91.9 per cent in time. It handled 25 lawful development certificate applications. We use the figures for planning a programme and never as a forecast of any result.

    Timing on site is the practical concern. Streets here often have parking restrictions, working-hours conditions and neighbours who live inches from the wall, so a trade that has to return because a duct was missed costs more than the same trade elsewhere. A services set that every installer has seen before work starts removes most of that waste, and it gives the project manager one document to check against each delivery.

    The figures on every sheet

    A kitchen with a hood extracting outside needs 30 l/s, and a bathroom 15 l/s. A five-bedroom townhouse needs 43 l/s for the whole dwelling under Approved Document F.

    Alarm positions follow BS EN 50291-1:2018, with the alarm at least 300 mm from the wall when ceiling mounted. Electrical work is notifiable for new circuit; consumer unit replacement; additions or alterations to circuits in a special location.

    Scope, fee and where to go next

    A Kensington and Chelsea set normally holds power and lighting plans, ventilation with fan duties, alarms, a consumer unit schematic and basement drainage and pump detail. There is no published starting price. We run a free constraints check, agree the scope and fix the fee.

    Read architectural drawings in Kensington and Chelsea for the borough picture, the national guide at M&E drawings, or the broader service at MEP design. Basements are also covered by plumbing and drainage drawings.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Two-storey rear extension under construction on a semi-detached house
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does the Royal Borough require SuDS in a basement?

    The Basements SPD says so for all basements. The test is 1 m soil; minors 50% run-off cut, and the drawings show how it is met.

    Can I fit air conditioning in a Kensington flat?

    The Local Plan expects schemes to reduce reliance on it, following the cooling hierarchy. We draw passive options first and show any unit last.

    Do I need an energy strategy for a house refurbishment?

    The submission list gives the scope as Majors only, so a house refurbishment does not.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.