Havering, London
M&E drawings in Havering
Most Havering households own the house they live in, and much of the borough is Green Belt. The services questions are practical ones: long cable runs, flood zones and the cost of getting a supply to a garden building. We draw M&E drawings for Havering homes that settle those before work starts. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on m&e drawings
Four steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
What Havering asks for, and how it shapes M&E drawings in Havering
Havering's householder checklist is brief, which is useful for owners. Two rows touch services. The sustainable design and construction statement is marked Retrofit only, which means a normal extension does not need one, but a project that retrofits an existing house to raise its environmental performance does. Where that happens, our M&E layout shows the heat pump, the ventilation unit and the new circuits that the statement describes.
The flood risk row is the one that catches people out. A flood risk assessment is needed for FZ2/FZ3, and where a basement is proposed it should include a basement impact assessment. The council's flood maps decide this, so an address check is the first thing we do.
If your property is in a flood zone, services design changes. Sockets and the consumer unit sit higher, circuits are split by floor so the ground floor can be isolated, and any pump has its own supply and alarm. We put those decisions on the drawing and mention them in the quote.

Local figures for Havering
| Measure | Value | Period | Source |
|---|---|---|---|
| Sustainable Design and Construction Statement required only where extensive retrofit works to improve a dwelling's environmental performance are proposed (Mayoral SD&C SPD; Local Plan Policy 34). | Retrofit only | — | havering.gov.uk, Havering Planning Application Checklist, Householder Applications (undated), pdf p.14, row 'Sustainable Design and Construction Statement' |
| Flood Risk Assessment required for all development in flood zones 2 and 3; where a basement is proposed the FRA should include a Basement Impact Assessment. | FZ2/FZ3 | — | havering.gov.uk, Havering Planning Application Checklist, Householder Applications (undated), pdf p.11, row 'Flood Risk Assessment' |
| Conservation areas | 11 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 146 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Green Belt share of the council area | 53 % of council area covered by green-belt polygons | — | planning.data.gov.uk |
| Households living in a house | 76.7 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder applications granted | 85.9 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Average price, detached | 841,116 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 30 l/s | — | gov.uk |
| AD J (2010 incl 2022) requirement J3; paras 2.34-2.36, PDF p.43; para 3.43, PDF p.57 | BS EN 50291-1:2018 | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Owner-occupied houses on big plots
76.7 per cent of Havering's 101,277 households live in a house and 69.5 per cent own their home, a combination that makes extensions, loft conversions and garden buildings common. Semi-detached homes average about £540,897 and detached ones about £841,116, and many owners extend.
Garden buildings are where the services work is heaviest. A garden room or garage conversion needs a separate supply, a protective device at each end and a buried route that avoids tree roots and drainage. We draw the trench, the cable type and the spare capacity at the main unit, and note whether a charge point can share the same route.
Inside the house, a rear extension brings a new kitchen. A hood venting outside needs 30 l/s and a utility room needs 30 l/s. We set both out on the plan beside the fan symbols.
Loft conversions are the other staple. A new bedroom in the roof needs a ventilated bathroom, interlinked smoke alarms on every floor and a circuit that the existing board can carry. We draw the route from the board to the roof, so the electrician is not cutting through finished plaster on the second visit.
Green Belt, heritage and the planning record
About 53 per cent of Havering is Green Belt. A services upgrade inside an existing house does not touch that policy, but a new outbuilding with its own supply usually does, so the planning route and the electrical design are agreed together. The borough has 11 conservation areas and 146 listed building entries.
Outside those areas, neighbours and noise are still the main concern for external plant. We position heat pumps and condensers away from boundaries and show the clearance on the site plan. Our architectural drawings in Havering page covers the wider planning drawings.
In its latest year the council decided 985 householder applications and granted 85.9 per cent. A coordinated drawing set takes the services off the list of things an officer might query.
What we issue for a Havering project
The set has a power and lighting plan per floor, a ventilation plan with each fan's duty, a consumer unit schematic and an alarm layout. A carbon monoxide alarm is added where a new fuel-burning appliance is fitted, to the standard BS EN 50291-1:2018. The electrician certifies notifiable work within 30 days.
We also add a short note on sequencing. First fix for the services follows the structure and precedes insulation and boarding, and the sheet marks which routes must be in before the ceiling is closed. A route missed before the ceiling is closed is expensive to fix.
We do not certify installations or replace specialist design for unusual plant. The set goes with our building regulations drawings to building control, and our MEP design service covers the heating and hot-water design behind it.
Send us your plans and the address. We run a free constraints check and give a fixed quote.
What you receive


Related pages
Other services in Havering
Questions
Does Havering need a flood risk assessment for an extension?
Only where the site is in flood zone two or three. We check the address first and tell you at quote stage.
Can I run power to a garden room in Havering?
Yes, with a protected cable route from the main unit. We draw the trench and the spare capacity, and the electrician certifies the work.
How much are M&E drawings in Havering?
Fixed quote after a free constraints check, based on the rooms and systems.
Sources and dates
- havering.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.