020 7864 7245Request a fixed quote

Newham, London

M&E drawings in Newham

M&E drawings in Newham show where every fan, circuit, alarm and drain goes in a house, a conversion or a new home, so the installer and building control read the same plan. With 376,542 residents and only 30.8 per cent of households owning their home, the borough is a place of tenants, landlords and conversions, and our sets are written for all three. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on m&e drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Two-storey rear extension under construction on a semi-detached house

    Newham's application requirements and M&E drawings in Newham

    Newham's planning application requirements, in the December edition, have an energy assessment entry that bears on services. The assessment must show compliance with the Local Plan and the London Plan carbon targets and consider connection to a heat network, and the carbon rule is On-site first; offset otherwise: reductions are made on site as far as possible, and any shortfall is offset. For a house extension the assessment is not asked for, but a conversion into several flats or a new build brings the question closer.

    The surface water entry is wider. The council asks for a drainage strategy at the scope Majors, CDAs, new-build, which includes every new-build and any development in a local Critical Drainage Area. A new house on a garden plot is therefore caught, and the strategy needs a drawn layout of pipes, gullies and attenuation to describe.

    We draw that layout on the same set as the electrical and ventilation sheets. It gives whoever writes the strategy a plan to follow, and it makes sure the pump, the chamber and the cable to them are shown together.

    Heat networks deserve a word. Where a scheme is near one, the council expects connection to be considered, and a home that connects needs a plant room position, a pipe route and a heat interface unit in a cupboard with ventilation and power. We show those items when they apply, and we say so plainly when they do not.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for Newham

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Energy Assessment (within Sustainability Statement or standalone) must show compliance with Local Plan SC1/SC2, London Plan SI 2 CO2 targets and heat-network connection (SC2, INF4, SI 3); carbon reductions on site as far as possible, otherwise offsetting.On-site first; offset otherwise—newham.gov.uk, Newham Planning Application Requirements (December 2024), PDF p.29 (printed p.28)
    Surface Water Drainage Strategy required for all majors, applications requiring a Flood Risk Assessment, any development in a local Critical Drainage Area and all new-build; Local Plan SC3, London Plan SI12/SI13.Majors, CDAs, new-build—newham.gov.uk, Newham Planning Application Requirements (December 2024), p.8 table; PDF p.30
    Population376,542mid-2025nomisweb.co.uk
    Owner-occupied households30.8 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Average price, terraced458,668 GBP2026-07publicdata.landregistry.gov.uk
    Average price, semi-detached502,633 GBP2026-07publicdata.landregistry.gov.uk
    Average price, flat325,381 GBP2026-07publicdata.landregistry.gov.uk
    Average price change over 12 months-5 %12 months to 2026-07publicdata.landregistry.gov.uk
    Households living in a house47.1 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder decisions388 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted86.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time97.2 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Larger home extension prior approvals granted6 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Larger home extension prior approvals refused23 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Lawful development certificate applications (PS1)281 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Mayoral CIL rate (indexed)30.3 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Conservation areas9 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries125 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Grade I listed entries4 list entries—planning.data.gov.uk
    Heritage at Risk entries21 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Registered parks and gardens2 registered parks and gardens intersecting the LPA boundary (Historic England)—planning.data.gov.uk
    Domestic gardens share of land (GLUD 2005)16.9 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.115 l/s—gov.uk
    AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.130 l/s—gov.uk
    AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.1719 l/s—gov.uk
    AD F Vol 1 (2021), Table 1.2 continuous extract high rates, PDF p.18; 2026 edition Table 1.213 l/s—gov.uk
    Building Regulations 2010 reg.12(6A) and (9); AD P (2013) para 2.5, PDF p.14new circuit; consumer unit replacement; additions or alterations to circuits in a special location—legislation.gov.uk
    AD P (2013) paras 3.4, 3.6 and 3.730 days—gov.uk
    AD S (2021) para 6.2, PDF p.357 kW—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Newham
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Terraces, conversions and new homes

    The average terraced house in Newham sold for £458,668, a semi for £502,633 and a flat for £325,381, with prices moving -5 per cent in twelve months. Lower values than in many boroughs make conversions and new builds attractive, and they raise the cost of a services mistake as a share of the budget.

    47.1 per cent of households live in a house, and many of those houses are terraces that have been divided or extended. A divided house needs separate metering, separate consumer units, fire-rated routes between floors and alarms linked to the strategy, and we show each on its own sheet so the building notice is clear.

    New homes in the borough are often infill on small plots. A charge point, a bin store and a soakaway all compete for the same strip of front garden, so the services sheet shows cable and drain routes against the site plan to stop the paving, the planting and the pipes being drawn by three different people.

    Planning figures and what they imply for programmes

    Newham decided 388 householder applications in its latest year, granting 86.9 per cent and deciding 97.2 per cent in time. Larger home extension prior approvals stood at 6 granted and 23 refused, and the council handled 281 lawful development certificate applications. We use these only as programme context.

    The Mayoral CIL rate for the borough is £30.3 per square metre in indexed terms this year. It applies to new floor area and sits beside the services budget in the cost plan, so we mention it when a client weighs an extension against a conversion.

    Householder decisions here are made quickly, which gives a short window between consent and start. A services set that is ready on the day of consent lets building control and the builder move at the same pace.

    Heritage, green space and plant locations

    Newham has 9 conservation areas, 125 listed building entries, 4 of them at Grade I, 21 Heritage at Risk entries and 2 registered parks and gardens. That is a lighter heritage load than in many inner boroughs, so most M&E plans are not constrained by conservation rules, though a flue near a listed building still needs care.

    Gardens are small. Domestic gardens cover 16.9 per cent of the borough's land, which makes the location of a heat pump, a flue terminal or a vent a real design problem. We show each external item with its distance to the boundary and to the neighbour's windows.

    Figures we draw to

    Approved Document F sets a bathroom at 15 l/s, a utility room at 30 l/s and a one-bedroom home at 19 l/s for the whole dwelling. Continuous ventilation uses 13 l/s as the high rate for a kitchen.

    Electrical work in a dwelling is notifiable for new circuit; consumer unit replacement; additions or alterations to circuits in a special location, and the certificate follows within 30 days. A new dwelling's charge point is at least 7 kW.

    Scope, fee and linked pages

    A Newham set holds power and lighting plans, ventilation, alarms, consumer unit schematics and drainage layout. There is no published starting price, so we run a free constraints check and quote a fixed fee.

    Read the borough overview at architectural drawings in Newham, the national guide at M&E drawings and the wider service at MEP design. A neighbouring borough is covered at M&E drawings in Redbridge.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does a Newham new build need a drainage strategy?

    The application requirements ask for one at the scope Majors, CDAs, new-build, which includes all new-build.

    What does Newham ask for on energy?

    The energy assessment must show On-site first; offset otherwise, together with heat network connection where it applies.

    How fast must an electrician certify work?

    Certification follows within 30 days of completing notifiable work.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.