Hackney, London

M&E drawings in Hackney

Hackney's validation list asks a lot of small residential schemes: an energy statement for a single new home, an overheating assessment for minor applications and a sustainability assessment from one unit upwards. We draw M&E drawings for Hackney houses and flats that give those documents something solid to refer to. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on m&e drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Hackney's validation checklist and M&E drawings in Hackney

    Hackney publishes its local requirements as a checklist, and several rows reach small projects. The energy strategy statement is listed against 1+ dwellings, so a new home or conversion into one needs it. The sustainability impact assessment comes in at 1+ dwellings; 1,000 sq m; 0.5 ha; 1 ha, so even a small residential scheme falls inside it.

    Overheating is the row owners tend to notice. The checklist asks for an overheating risk assessment for All majors and minors, and its own example is the installation of mechanical ventilation such as an air-conditioning unit. A householder proposing a ventilation or cooling unit should therefore expect the question, and our drawings show the unit, its duct route and its power supply so that the assessment has a design to test.

    Drainage is risk-led. A drainage strategy goes with major schemes, and flood risk work applies to Majors; basements in CDAs. Basements in Critical Drainage Areas are the classic trigger; for those, the M&E sheet shows pumps, alarms and their supply on a dedicated circuit.

    Two-storey rear extension under construction on a semi-detached house

    Local figures for Hackney

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Energy Strategy Statement is required for all major applications, for any application providing 1 or more residential units, and for non-residential development creating additional floorspace.1+ dwellings—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, row 'Energy Strategy Statement'
    Sustainability Impact Assessment required for buildings of 1,000 sq m GIA or more, any residential development of 1 or more units, residential sites of 0.5 ha or more, and any site of 1 ha or more. BREEAM pre-assessment only for non-residential schemes creating 100 sq m or more.1+ dwellings; 1,000 sq m; 0.5 ha; 1 ha—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, rows 'Sustainability Impact Assessment' and 'BREEAM Pre Assessment'
    Overheating Risk Assessment is required for all major applications and for all minor applications (the list gives installation of mechanical ventilation such as air-conditioning units as an example).All majors and minors—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, row 'Overheating Risk Assessment'
    Sustainable Drainage Strategy including SuDS proforma is required for all major developments. A Flood Risk Assessment is also required for basement development and major development in Critical Drainage Areas or areas of high surface-water or elevated groundwater risk, and for all development in a Critical Drainage Area in flood zone 1.Majors; basements in CDAs—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, rows 'Sustainable Drainage Strategy including SuDS proforma' and 'Flood Risk Assessment'
    Conservation areas37 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions77 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries555 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Heritage at Risk entries40 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Households living in a house18.8 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted84.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hackney
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Terraces, conversions and the way services run

    Hackney has 106,081 households, and just 18.8 per cent of them live in a house. Owner-occupation is 24.6 per cent. Our Hackney jobs therefore tend to be a leasehold flat, a house converted into flats or a warehouse conversion, where an M&E layout often matters more than the plans.

    Semi-detached homes average about £1,193,876, and a flat about £524,885. Refits at those values usually include a new electrical installation and a new bathroom, and every new bathroom needs a fan that delivers 15 l/s. In a warehouse conversion, where the fan is far from any outside wall, the duct run is the main design problem.

    Older buildings often carry old wiring. We note what the electrician finds on site and mark any circuit that must be replaced rather than extended, so the new work meets current requirements and not just the room being altered.

    Where a Hackney house is being converted to flats, each unit needs its own consumer unit and meter position, and the communal supply has to be separated and labelled. We draw the incoming supply, the cut-outs and the riser so that the utility companies and the electrician start from the same picture. Smoke and heat alarms are interlinked within each flat, with the shared hall and stairs treated as a separate circuit.

    Conservation areas, Article 4 directions and visible plant

    Hackney has 37 conservation areas and publishes 77 Article 4 directions, covering 197 separate areas. The borough also holds 555 listed building entries and has 40 entries on the Heritage at Risk register. Visible services are the touchy point: a flue through a front roof slope or a unit on a front wall is exactly what an Article 4 direction is written to control.

    We look the address up before we draw. Where the front is protected, the plant goes at the back or inside, and where nothing can be hidden the drawing says so and the planning route is reviewed. Our architectural drawings in Hackney page covers the design drawings behind that decision.

    The council decided 415 householder applications in its latest year and granted 84.6 per cent.

    What we issue for a Hackney project

    The set contains a power and lighting plan for each floor, a ventilation plan with each fan's duty, a consumer unit schematic and an alarm layout. Part P notifiable work includes new circuit; consumer unit replacement; additions or alterations to circuits in a special location, and the electrician certifies the work within 30 days.

    Because Hackney asks for several supporting documents on small residential schemes, we sequence the M&E drawings early. The energy and overheating consultants then work from fixed plant positions rather than sketches, which helps reduce revisions.

    We can also supply information for the overheating and energy documents that Hackney asks for, though the assessments themselves come from a specialist. For the thermal and heating design behind the layouts, see our MEP design service, and for the Building Regulations set see building regulations drawings.

    Send us the address and plans. We run a free constraints check and give a fixed quote.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    House extension under construction with scaffolding, new glazed doors and building materials
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does Hackney need an overheating assessment for a minor scheme?

    The checklist lists minor applications too, with mechanical ventilation as its example. We show the unit and its routes so that the assessment can be done.

    Is an M&E set the same as an energy statement?

    No. An energy statement is a calculation-led report. The M&E set is the drawn layout it refers to.

    How much do M&E drawings cost in Hackney?

    Fixed quote after a free constraints check, based on the rooms and systems.

    Sources and dates