M&E drawings in Islington
M&E drawings in Islington have to answer a Local Plan that asks every application, including a loft or basement, for a sustainability statement. Our drawings place the fans, circuits, alarms and routes so the statement, the installer and building control all read one set. Only 16.3 per cent of households live in a house here, so most jobs are flats, maisonettes and tall terraces. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on m&e drawings
Four steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Islington's Local Plan rules for M&E drawings in Islington
The sustainable design policy of the adopted Islington Local Plan asks for a Sustainability Design and Construction Statement with every application, loft conversions and basements included. The thresholds are recorded as 100 sq m; 500 sq m BREEAM: larger minor extensions need energy, adaptive design, landscape, water and operational content, while smaller ones need proportionate information. A residential extension above the upper threshold also needs a BREEAM Domestic Refurbishment pre-assessment.
The overheating policy sets its own test. Its entry reads Majors: future-climate modelling, and it expects the cooling hierarchy to be followed, with active cooling accepted only where passive measures cannot work. In a top-floor flat under a flat roof, that means shading, cross-ventilation and a fan with a night purge setting go on the M&E plan before any air conditioning is proposed.
The water and drainage policy comes next. The council sets the runoff requirement at 8 l/s/ha; 1:100 + 40% for major schemes, and its water efficiency target is 105 l/person/day. A single house is not a major scheme, but the water figure is the one we mark against taps, showers and appliances on the services sheet, because it is cheap to meet at design stage.
The practical result is that an Islington services drawing does two jobs. It tells the installer what to fit, and it gives whoever writes the sustainability statement a plan to quote from, with the fans, the cooling choices and the water fittings already placed. Writing the statement afterwards from a vague sketch is where projects lose weeks.

Local figures for Islington
| Measure | Value | Period | Source |
|---|---|---|---|
| Policy S2: every application needs a Sustainable Design and Construction Statement (including basements, roof extensions and loft conversions). Majors, minor new build and 'larger minor extensions' of 100 sq m or more must include Energy Strategy, Adaptive Design, Landscape Design, Integrated Water Management and Operational Sustainability; smaller extensions need proportionate information. Validation list also requires a BREEAM Domestic Refurbishment pre-assessment of 'Excellent' for residential extensions over 500 sq m gross or five or more dwellings. | 100 sq m; 500 sq m BREEAM | — | islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S2 B-C, p.188; paras 6.16-6.18, p.189; validation item 4.8, pp.24-25 |
| Policy S6: all developments except smaller minor extensions (under 100 sq m) must show how the design reduces overheating following the cooling hierarchy; majors must submit internal temperature modelling under projected future summer temperatures; smaller extensions are encouraged to use hierarchy levels 1-3 and active cooling will not be accepted unless higher levels cannot work. | Majors: future-climate modelling | — | islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S6 A-E, p.207 |
| Policy S9: majors must reach greenfield run-off (8 l/s/ha in Islington) where feasible, storing the 1-in-100-year plus 40% climate-change volume, and submit the London Surface Water Drainage Pro-forma; minor new build of one unit or more must reduce existing run-off as far as possible or at least maintain it. | 8 l/s/ha; 1:100 + 40% | — | islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S9 F-I, p.223; para 6.147, p.226; validation item 4.8(e), pp.25-26 |
| Policy S9 K and M: all developments must show water efficiency through the SDCS; residential development must achieve mains water consumption of 105 litres or less per head per day (excluding up to 5 litres external); non-residential to achieve all BREEAM Wat 01 credits. | 105 l/person/day | — | islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S9 K and M, p.224; para 6.152, p.226 |
| Households living in a house | 16.3 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Average price, terraced | 1,151,398 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Average price, flat | 560,124 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Owner-occupied households | 26.7 % of households owner-occupied (owned outright or with mortgage/loan) | Census 2021 | nomisweb.co.uk |
| Conservation areas | 41 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 1,050 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Grade I listed entries | 12 list entries | — | planning.data.gov.uk |
| Grade II* listed entries | 34 list entries | — | planning.data.gov.uk |
| Heritage at Risk entries | 33 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Householder decisions | 337 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 92.6 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 98.8 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Lawful development certificate applications (PS1) | 141 certificates | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Average price change over 12 months | -4.9 % | 12 months to 2026-07 | publicdata.landregistry.gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 15 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.1 intermittent extract, PDF p.16; 2026 edition Table 1.1 | 6 l/s | — | gov.uk |
| AD F Vol 1 (2021), Table 1.2 continuous extract high rates, PDF p.18; 2026 edition Table 1.2 | 13 l/s | — | gov.uk |
| AD F Vol 1 (2021) para 1.24 and Table 1.3, PDF p.18; 2026 edition para 1.20 and Table 1.3, PDF p.17 | 19 l/s | — | gov.uk |
| Building Regulations 2010 reg.12(6A) and (9); AD P (2013) para 2.5, PDF p.14 | new circuit; consumer unit replacement; additions or alterations to circuits in a special location | — | legislation.gov.uk |
| AD P (2013) paras 3.4, 3.6 and 3.7 | 30 days | — | gov.uk |
| AD L Vol 1 (2021 incl 2023) para 6.58, PDF p.60; AD L Vol 1 (2026) paras 5.57 and 5.59, PDF p.65 | 75 lm/W | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Tall terraces, flats and shared services
A terraced house in Islington sold for an average of £1,151,398, and the average flat for £560,124. With owner-occupiers holding only 26.7 per cent of households, many drawings are commissioned by landlords or by leaseholders who need freeholder consent. We note which services are shared and which belong to the flat, so that consent request is specific.
In a four-storey terrace the long vertical run is the challenge. A bathroom extract on the top floor, a kitchen two floors below and a basement utility room all want a path to the open air. We trace each duct up through the building, test it against the structure, and keep it clear of floor joists and party walls before the first fan is chosen.
Basements need separate thought. A lower ground floor kitchen or a new basement room cannot always drain by gravity, so a pump or a non-return valve may be needed, and both need power and an alarm on a dedicated circuit. We draw those items with the electrical layout so the drainage designer and the electrician are not discovering each other on site.
Heritage stock and the outside of the building
The borough has 41 conservation areas and 1,050 listed building entries, with 12 at Grade I and 34 at Grade II*. Another 33 entries appear on the Heritage at Risk register. Outside terminals, flues and condensers on the street side are hard to justify in a Georgian or Victorian street, so the drawings push them to rear closets, roof valleys and lightwells.
Where a home is listed, the services route itself may need listed building consent, since drilling a chimney breast or lifting a floor changes historic fabric. We mark every penetration so that the heritage statement can describe it, rather than leaving it for a builder to improvise.
Planning context and certificates
The council decided 337 householder applications in its latest year and granted 92.6 per cent, deciding 98.8 per cent in time. It also handled 141 lawful development certificate applications. Those are planning statistics, and we use them to judge how tight a programme can be, not to promise any outcome.
House prices moved by -4.9 per cent over twelve months, so owners are improving homes they intend to keep. That is when a services upgrade, a new consumer unit or a heat pump is likely to be part of the work, and an early drawing keeps it within budget.
Numbers we draw to
Approved Document F sets a bathroom extract at 15 l/s and a separate toilet at 6 l/s. Where ventilation runs continuously, a high-rate kitchen is 13 l/s. A one-bedroom flat needs 19 l/s for the dwelling as a whole, and the sheet shows how the fans add up to it.
Part P notification covers new circuit; consumer unit replacement; additions or alterations to circuits in a special location, with certification within 30 days. Lighting in the fittings schedule is checked against 75 lumens per circuit watt.
Scope, fee and linked pages
An Islington set normally has power and lighting plans per floor, a ventilation layout with each fan duty, alarm positions, a consumer unit schematic and a schedule. There is no published starting price, so we start with a free constraints check and quote a fixed fee.
More on the borough is at architectural drawings in Islington. The national guide is M&E drawings, and the design side sits under MEP design. For a loft, the services also join the building regulations drawings.
What you receive


Related pages
Other services in Islington
Questions
Does an Islington loft conversion need a sustainability statement?
The sustainable design policy applies to every application, loft conversions included. The thresholds are recorded as 100 sq m; 500 sq m BREEAM, and smaller jobs need proportionate content.
What water use does Islington expect in new homes?
The Local Plan sets 105 l/person/day. We mark the fittings that deliver it.
Can I add air conditioning to an Islington flat?
The overheating policy follows the cooling hierarchy, and active cooling is accepted only where higher measures cannot work. We draw passive options first.
Sources and dates
- islington.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.