020 7864 7245Request a fixed quote

Southwark, London

Electrical design drawings in Southwark

Southwark grants most of the householder applications it decides, but its Plan sets high standards on energy and water. We produce electrical design drawings in Southwark for extensions, conversions and new builds, with every circuit, fitting and plant supply drawn so the carbon and water figures hold up on site. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on electrical design drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    Energy, water and electrical design drawings in Southwark

    The Southwark Plan pushes carbon down hard. The energy policy requires all development to follow Be lean, Be clean and Be green, and the rule summary reads Majors net zero; major residential 100% on 2013 Regs. The reasons text for the neighbouring overheating policy adds that highly glazed or poorly ventilated buildings carry an overheating risk.

    For a house the standard is more modest, but the direction is clear: efficient fittings, no direct electric heating where a heat pump is workable, and renewable provision wherever the roof allows. Our electrical sheets show each of those choices, so an officer reading the energy statement can match each claim to a circuit.

    Water is the second rule. The water policy requires residential development to reach 105 l/person/day, excluding a small external allowance. Hot-water appliances are where that figure meets electrics: a shower pump, a hot-water cylinder and an immersion element all appear on our schedule so the water designer and the electrician agree.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Southwark

    Figures with their unit, period and source
    MeasureValuePeriodSource
    P70 Energy: all development follows Be lean, Be clean, Be green; major development must be net zero carbon with Be seen monitoring, and major residential must reduce on-site carbon by 100% on 2013 Building Regulations. P69 reasons note overheating risk in highly glazed or poorly ventilated buildings.Majors net zero; major residential 100% on 2013 Regs—services.southwark.gov.uk, Southwark Plan 2022: Development Management Policies (adopted 23 February 2022), P70, PDF p.102 (printed p.207); P69 reasons 4
    P67: residential development must achieve safe-to-drink water use of no more than 105 litres per person per day (excluding up to 5 litres external); major development to assess water supply infrastructure.105 l/person/day—services.southwark.gov.uk, Southwark Plan 2022: Development Management Policies (adopted 23 February 2022), P67, PDF p.99 (printed p.204)
    Supplementary planning documentHouseholder development SPD2025southwark.gov.uk
    Householder decisions558 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted94.8 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Households living in a house21.8 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households28.9 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Average price, terraced838,160 GBP2026-07publicdata.landregistry.gov.uk
    Conservation areas53 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries919 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Scheduled monuments9 scheduled monuments intersecting the LPA boundary (Historic England)—planning.data.gov.uk
    AD P (2013) paras 3.4, 3.6 and 3.730 days—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Southwark
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Southwark's householder rules and the house types we see

    The borough's Householder development SPD governs most extensions and roof alterations, and officers decided 558 householder applications in the latest year, granting 94.8 per cent. Electrical sheets rarely sway that outcome, but they help building control as much as the planning file.

    Only 21.8 per cent of households live in a house, and 28.9 per cent are owner-occupiers, so many clients are leaseholders or landlords. The terraced average of £838,160 shows why: a house here is a major asset, and the electrics are a part of it that buyers' surveyors check.

    A converted Victorian terrace in Camberwell or Peckham often has an original supply, a patched-up consumer unit and a loft that was added without a drawing. Our survey sheet records what exists and flags anything that needs a competent person before new circuits are added.

    Conservation areas, listed buildings and Article 4

    Southwark has 53 conservation areas, 919 listed building entries and 9 scheduled monuments. Heritage also shapes which electrical items are visible. A box or charger on a conservation-area frontage is judged against the character of the street, and an Article 4 direction can remove permitted rights for small external alterations.

    The borough's size, from the riverside to the Dulwich edge, means the constraints change quickly from street to street. Our architectural drawings in Southwark page lists the designations, and the MEP design service in Southwark shows how the electrical drawing fits with ventilation and heating.

    A worked example: an extension and a heat pump in one house

    Take a terraced house in Southwark with a rear extension, a loft room and a plan to replace the gas boiler. The old consumer unit has no spare ways, the new kitchen brings an induction hob and a dishwasher, and the heat pump needs a dedicated feed. A drawing set that treats each as a separate job will leave the house short of capacity.

    We draw them together: one new consumer unit sized for the whole project, circuits labelled by room, the heat pump on its own way with a local isolator, and a spare way reserved for a charger. The lighting schedule lists each fitting against the efficacy floor, and the sheets show where heat gains come from for the energy statement.

    Seen as a whole, the electrics become a short list of decisions rather than a pile of surprises, and the officer, the building control surveyor and the electrician read the same document.

    Part P, lighting efficacy and what we issue

    Part P work must be certified within 30 days, and the lighting floor is 75 lumens per circuit watt now, rising to 105 in the later edition. A new dwelling needs a charge point of at least 7 kW.

    We issue a plan per floor, a consumer unit schematic and a schedule, checked by a second technologist. The set joins your building regulations drawings in Southwark, and the electrical design drawings hub covers the service.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Two-storey rear extension under construction on a semi-detached house
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    What does Southwark expect of new homes on carbon?

    The energy policy, summarised: Majors net zero; major residential 100% on 2013 Regs. For a house extension the test is proportionate, and we advise before you commit.

    What water limit applies in Southwark?

    The water policy sets 105 l/person/day for residential development, excluding a small external allowance.

    Do you check the existing wiring in an old terrace?

    We record what we can see and flag anything that needs a competent person to inspect before new circuits are added.

    How much do electrical design drawings cost in Southwark?

    Fixed quote after a free constraints check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.