Bromley, London
Electrical design drawings in Bromley
Electrical design drawings in Bromley show the circuits, consumer unit, lighting and charge point of a house on one plan. The housing in Bromley is 68.6 per cent houses, so most jobs are extensions and rewires in suburban streets, some inside its 47 conservation areas. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on electrical design drawings
Four steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Bromley's validation rules and the electrics behind them
Bromley's validation guidance asks for an energy strategy only on major development, and the entry in our data reads "majors; SI 4B". The accompanying energy hierarchy expects communal low-temperature heating in Heat Network Priority Areas, and our record of that requirement is "majors only". Both are therefore irrelevant to a single house unless the house is part of a larger scheme.
For ordinary homes, the two London Plan rules still apply by condition: water use of "105 l/p/d (+ up to 5 l external)" and the cooling hierarchy, summarised as "cooling hierarchy, 6 steps". They tell a designer to cut heat gain first and add active cooling last, which is why an air-conditioning circuit on a modest extension needs a reason.
In practice, this means Bromley's planners rarely read the electrical plan. Building control and the installer do. The drawing is for them, and for you, to settle the number and position of circuits before the walls are boarded.

Local figures for Bromley
| Measure | Value | Period | Source |
|---|---|---|---|
| The energy strategy for major development must show how internal overheating and reliance on air conditioning are reduced following the SI 4B cooling hierarchy. | majors; SI 4B | — | bromley.gov.uk, Bromley Validation Guidance and List of Requirements - Planning Applications (agreed 12 December 2024), p.28, 'Energy Strategy' |
| London Plan Policy SI 5C(1): development proposals should, through planning conditions, limit mains water use to the Building Regulations optional requirement, 105 litres or less per head per day for residential development, excluding an allowance of up to 5 litres for external use. Applies in every London borough. | 105 l/p/d (+ up to 5 l external) | — | london.gov.uk, The London Plan 2021 (GLA, March 2021), p.356, Policy SI 5 part C(1) |
| London Plan Policy SI 4B: major development must show through an energy strategy how internal overheating and reliance on air conditioning are reduced, following the six-step cooling hierarchy (reduce heat entering; minimise internal heat generation; manage heat with thermal mass; passive ventilation; mechanical ventilation; active cooling). Para 9.4.1 says the principles can also be applied to minor development. | cooling hierarchy, 6 steps | — | london.gov.uk, The London Plan 2021 (GLA, March 2021), p.354, Policy SI 4 part B and para 9.4.1 |
| Energy Strategy required for Major developments, following the London Plan energy hierarchy, zero-carbon target, Be Seen reporting, whole life-cycle carbon for referable schemes, and communal low-temperature heating in Heat Network Priority Areas (three areas partly or wholly in Bromley). | majors only | — | bromley.gov.uk, Bromley Validation Guidance and List of Requirements - Planning Applications (agreed 12 December 2024), pp.28-29, 'Energy Strategy' |
| Conservation areas | 47 named conservation areas published by the council | — | planning.data.gov.uk |
| Article 4 directions | 108 Article 4 directions published by the council | — | planning.data.gov.uk |
| Listed building entries | 412 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Heritage at Risk entries | 25 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Householder applications granted | 78.6 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 89.1 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| AD P (2013) paras 3.4, 3.6 and 3.7 | 30 days | — | gov.uk |
| AD S (2021) para 6.2, PDF p.35 | 7 kW | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Electrical design drawings in Bromley: suburban houses and what they need
Bromley has 135,827 households and 68.5 per cent are owner-occupied, so the typical client lives in the house and plans to stay. That tends to mean larger projects: a kitchen extension that doubles the socket count, a loft room with its own lighting circuit, a garden office fed from the main board.
Our sheets give each of these its own circuit and label, show the consumer unit with spare ways, and add the route for a charge point on the drive. Combined with construction drawings in Bromley, the builder gets a single set.
Conservation areas, Article 4 and listed buildings
With 47 conservation areas, 108 Article 4 directions and 412 listed building entries, Bromley carries a real heritage load, and 25 entries appear on the Heritage at Risk Register. Article 4 directions remove some permitted development rights where they apply.
Inside that framework, outward-facing electrical items such as cabinets, cameras and flood lights are where a planner may take interest. We draw them on the elevation and keep fixings and cable routes out of historic fabric. For a listed building, a separate consent route applies.
How Bromley decides household applications
Bromley decided 1,609 householder applications in the latest figures, granting 78.6 per cent and deciding 89.1 per cent on time. That grant rate is lower than in neighbouring Bexley, at 94.6 per cent, which is one reason to draw carefully before applying.
The council's only supplementary document in our data is the "Urban Design Guide SPD", so an extension is judged largely against the local plan and the borough's own habits. We draw both extension and circuits so they hold together.
Part P, certificates and charging
Notifiable work must be certified within 30 days of completion. A charge point on a new dwelling carries a nominal output of at least 7 kW.
We draw positions and routes; the installer calculates, tests and certifies. Read our electrical design drawings guide for the lighting and solar assumptions behind current guidance.
A kitchen extension, from the electrical side
A rear kitchen extension is the commonest reason a Bromley owner asks for electrical drawings. The extension brings underfloor heating, an island with sockets, several light zones and often a new door to the garden with an outdoor supply.
We draw each of those on its own circuit, with the underfloor heating thermostat positions, the island supply route in the floor void and a switch plan that suits the way the room is used. Outdoor sockets and lights are shown with the protection they need, and we leave room in the consumer unit for what you may add later.
The sheets sit beside the structural and architectural drawings, so the builder sees the cable route and the beam in the same view before either is built.
Quote and next steps
Send plans, say what is changing and we check Bromley's rules before pricing. Bordering boroughs follow the same method, for instance electrical design drawings in Croydon, and the wider package starts at Bromley's architectural drawings page.
What you receive


Related pages
Other services in Bromley
Questions
Does a Bromley householder need an energy strategy?
No. The validation guidance asks for one only on major development.
Do Article 4 directions in Bromley stop electrical work?
They do not stop internal wiring. They limit external changes that would otherwise be permitted development.
Can I put a charge point on my front wall?
Often, but a conservation area or Article 4 direction may change the answer. We mark the position and flag the risk.
When is the Part P certificate due?
It is due within 30 days of completion.
Sources and dates
- bromley.gov.uk, retrieved
- london.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- bromley.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.