020 7864 7245Request a fixed quote

Lambeth, London

Electrical design drawings in Lambeth

Lambeth is dense with converted Victorian houses, purpose-built flats and conservation areas. Our electrical design drawings in Lambeth show the circuits, lighting and supply for the flat, extension or conversion you are building, and record the facts the council's energy and water requirements rely on. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on electrical design drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    House extension under construction with scaffolding, new glazed doors and building materials

    Lambeth's energy and water requirements, and electrical design drawings in Lambeth

    Lambeth's Local Information Requirements list is firm about energy on large schemes. The list requires an Energy Strategy, including an overheating assessment, for every major development, showing a reduction on site of 35% on-site reduction; majors only. A single flat conversion falls well below that threshold, though a large block of new flats may not, and the strategy leans on the loads and lighting that our electrical sheets record.

    The second rule covers water. A sustainability statement must demonstrate the targets in the London Plan water policy, which our rule sheet records as Water: London Plan SI 5C targets. Non-residential schemes should also address overheating. The electrical link is less obvious than it looks: low-flow fittings are specified with instantaneous showers, and an electric shower or a boosted supply needs its own circuit, which we draw and size.

    Putting the two together, our approach is simple. We total the lighting watts and the appliance loads, mark heat pump and solar provision, and leave the sustainability consultant with a clean set of electrical facts instead of estimates.

    Brick house being extended, with a wide new opening supported over the ground floor

    Local figures for Lambeth

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Local List item 28: all Major development needs an Energy Strategy (including overheating assessment) showing a minimum 35 per cent on-site reduction beyond Building Regulations, with 10 per cent (residential) or 15 per cent (non-residential) from energy efficiency, under Lambeth EN3/EN4 and London Plan SI 2-SI 4.35% on-site reduction; majors only—lambeth.gov.uk, Lambeth Local Information Requirements (the Local List) 2024, item 28, PDF p.32 (printed p.31)
    Sustainability supporting statement must show the water consumption targets in London Plan SI 5 Part C are met, with water efficiency under Lambeth Policies EN6 and Q7; non-residential applications should address overheating.Water: London Plan SI 5C targets—lambeth.gov.uk, Lambeth Local Information Requirements (the Local List) 2024, PDF p.66-67 (printed p.65-66)
    Households living in a house24.8 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households33 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Supplementary planning documentLambeth Design Guide SPD Part 5: Basements2023lambeth.gov.uk
    Lawful development certificate applications (PS1)401 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Conservation areas64 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries953 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    AD P (2013) paras 3.4, 3.6 and 3.730 days—gov.uk
    AD S (2021) para 6.2, PDF p.357 kW—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Lambeth
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Converted houses and the flats within them

    Only 24.8 per cent of Lambeth households live in a house, and 33 per cent own their homes. A large part of our work here is therefore inside converted houses, where the original supply arrives at one point and several flats share it. Rewiring one flat without understanding the shared intake is how a landlord ends up with tripped fuses on every floor.

    We record the existing meter positions, tails, consumer units and any shared supplies, then draw new circuits so each flat can be isolated alone. Where a basement or loft flat is added, the load calculation is checked against the incoming supply, and the borough's design guide is read alongside it: the Lambeth Design Guide SPD Part 5: Basements matters where the new space goes below ground.

    Lawful development certificates are common here, with 401 applications in the latest reporting year. A clear electrical layout, dated and drawn, is the kind of evidence that sits well in a file when a use or an alteration has to be shown to be lawful.

    Conservation areas, listed buildings and visible fittings

    Lambeth has 64 conservation areas and 953 listed building entries. In an area so heavily designated, a visible fitting is more than a detail. A meter cabinet on a stucco front, a surface-mounted conduit on a brick elevation or a charge point on a terrace forecourt should be sited with the elevation in mind.

    Internally we mark every chase and every floor lifting point where a historic ceiling or staircase is involved. Our architectural drawings in Lambeth set out the designations, and the electrical sheet is drawn so the consent officer can see which fabric is cut and which is untouched.

    Survey first: wiring in a converted Lambeth house

    Converted houses hold surprises. A flat on the second floor may be fed from the ground-floor meter cupboard, a loft room may hang off the bathroom lighting circuit, and an old fuse board may still serve a basement. Our survey sheet records each of those facts, with photographs where they help.

    With the survey in hand we can say honestly which parts of the installation can be extended and which should be replaced. That honesty is the point: a quote built on a guess comes back as a variation, and a landlord's budget does not like variations.

    National rules and what we issue

    Notifiable work must be certified within 30 days, fixed lighting must achieve 75 lumens per circuit watt, and a new dwelling's charge point must offer 7 kW. We build all of it into the issue.

    Each pack has a plan per floor, a consumer unit schematic and a fittings schedule, checked by a second technologist. The set joins your building regulations drawings in Lambeth and SAP calculations, and a neighbouring borough's version is at electrical design drawings in Southwark. The electrical design drawings hub covers the service in full.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does a Lambeth flat conversion need an Energy Strategy?

    The council requires one for major development, with a minimum on-site reduction of 35% on-site reduction; majors only. Smaller conversions fall below that, but we check against your scheme.

    Can new circuits in a converted house affect the other flats?

    They can, if the supply is shared. We record the intake and draw circuits that isolate each flat.

    Can an electrical drawing support a lawful development certificate?

    It can help, as dated evidence of what exists. The certificate application itself is a separate service.

    How much do electrical design drawings cost in Lambeth?

    Fixed quote after a free constraints check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.