Westminster, London
Electrical design drawings in Westminster
Electrical design drawings in Westminster show the circuits, consumer unit, lighting and charge point of a flat, mews house or townhouse on one plan. With 4,015 listed building entries and 56 conservation areas, almost every job here is a careful alteration, not a new build. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on electrical design drawings
Four steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Westminster City Plan: what it says about energy and electrics
Westminster's validation list and City Plan require major developments to submit an Energy Strategy and a Cooling Strategy. Our data records the requirement as "Major: Energy Strategy + Cooling Strategy". Its environmental policy goes further and says all developments must be designed to minimise the risk of internal overheating, not only the major ones.
The plan's water paragraph sets the optional efficiency level, recorded as "105 l/p/d", secured by condition. It follows the London Plan rule and does not alter how a circuit is drawn.
The practical reading for a house or flat is short. A refurbishment is not a major development, so no Energy Strategy is demanded, but the overheating principle still applies. Fitting a new comfort-cooling unit in a mansion flat is the kind of electrical change that attracts a question, and we draw it with the reason for it written beside the circuit.

Local figures for Westminster
| Measure | Value | Period | Source |
|---|---|---|---|
| Item L15 and City Plan Policy 40: major developments need an Energy Strategy showing net zero carbon via the Mayor's energy hierarchy, including a Cooling Strategy (London Plan cooling hierarchy) to limit overheating. Policy 40E: all developments must be designed and operated to minimise the risk of internal overheating. | Major: Energy Strategy + Cooling Strategy | — | westminster.gov.uk, Westminster City Plan 2019-2040 (as revised, adopted 21 January 2026), Policy 40 clauses B and E, p.163-164; list p.11, item L15 |
| City Plan para 42.10: residential development should meet the optional water efficiency requirement of 105 litres or less per person per day (London Plan SI5), secured by condition. | 105 l/p/d | — | westminster.gov.uk, Westminster City Plan 2019-2040 (as revised, adopted 21 January 2026), Para 42.10, p.174 |
| Listed building entries | 4,015 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Conservation areas | 56 named conservation areas published by the council | — | planning.data.gov.uk |
| Article 4 directions | 10 Article 4 directions published by the council | — | planning.data.gov.uk |
| Households living in a house | 10.2 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Households | 94,815 | Census 2021 (21 March 2021) | nomisweb.co.uk |
| Householder applications granted | 82 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 79 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| AD P (2013) paras 3.4, 3.6 and 3.7 | 30 days | — | gov.uk |
| AD S (2021) para 6.2, PDF p.35 | 7 kW | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Electrical design drawings in Westminster: mansion blocks, mews and townhouses
Westminster has 94,815 households, and just 10.2 per cent of homes are houses. That is a low share, so the typical drawing is for a flat in a mansion block or a converted terrace, where the supply is a riser, the meter is fixed and the managing agent wants a plan.
Mews houses are the exception, and the council publishes a guide for them, listed in our data as "Mews: a guide to alterations SPG". Their small footprints and close-knit frontages mean external electrical items such as lamps, cameras and charge points are treated with unusual care. We draw each one and its fixing.
Roof alterations are the other typical heritage item, covered by "Roofs: a guide to alterations and extensions on domestic buildings SPG". A rooftop plant room or PV array may be assessed against it, and the electrical route to it has to be hidden.
Heritage load: listed buildings and Article 4
The borough holds 4,015 listed entries, of which 3,419 are Grade II, and 10 Article 4 directions. Listed building consent applies to internal work that affects special interest, so rewiring behind historic plasterwork or cornices is a real question.
We draw cable routes to avoid cutting ornamental plaster or timber, using floor voids, skirting trunking and existing risers. We identify items that may need consent and leave the application itself to you or the council's process. We also note where an old installation is part of the building's character and should not be removed.
How Westminster decides household applications
The council decided 4,802 applications of all kinds in the latest figures, among them 366 householder cases. It granted 82 per cent of those and decided 79 per cent in time. Those are historical outcomes, not a promise.
Where electrical alterations sit inside a wider scheme, we draw both together. Building regulations drawings in Westminster pick up the same model and take it to building control.
Part P and charging
Notifiable work needs a certificate within 30 days of completion. A new dwelling with parking needs a charge point of at least 7 kW nominal output; in a mews house with a garage, we draw the cable route and the board way.
See the electrical design drawings hub for the national figures.
Hiding the wiring in a period house
In a Westminster townhouse the best wiring is the wiring nobody sees. That calls for a different habit from a new build: route through existing voids, reuse historic socket positions where they work, and put new equipment behind joinery that can be removed.
We draw the route of every new cable, mark where the floor can be lifted, and show where the consumer unit and any new riser can sit without cutting a historic wall. If a decorative switch plate or period light fitting is staying, the plan says so and designs around it.
It is slower than an anonymous rewire, but it keeps the listed fabric intact and gives the installer a clear method.
Getting started
Send plans, say whether the building is listed and name the managing agent if there is one. We confirm Westminster's requirements and give a fixed quote. Next door, electrical design drawings in Camden face a very similar heritage load.
What you receive


Related pages
Other services in Westminster
Questions
Does Westminster require an energy strategy for a flat refurbishment?
No. It is demanded of major developments. The overheating principle applies to all, so a new cooling unit may draw questions.
Do I need listed building consent to rewire?
Not always, but work that harms historic plaster, panelling or joinery can need it. We draw routes that avoid those areas.
Does the mews guide affect electrical fittings?
It affects visible items such as external lamps, cameras and charge points. Internal work is unaffected.
Who certifies the work?
The registered installer or building control body, within 30 days of completion.
Sources and dates
- westminster.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- westminster.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.