020 7864 7245Request a fixed quote

Tower Hamlets, London

Electrical design drawings in Tower Hamlets

Tower Hamlets is a borough of flats, warehouse conversions and dense terraces, where very few homes are houses and most are rented. Our electrical design drawings in Tower Hamlets show the supply, circuits and lighting for a conversion, extension or new flat, and give the overheating and water policies the electrical facts they depend on. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on electrical design drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Two-storey rear extension under construction on a semi-detached house

    Overheating, water and electrical design drawings in Tower Hamlets

    The Local Plan treats overheating as a design duty. The overheating policy requires new development to avoid overheating and minimise air conditioning, and major schemes must show compliance in the design and access statement, using overheating analysis against Majors: 2030s mid-range climate analysis. The London Plan cooling hierarchy applies throughout.

    That affects electrical design in a plain way. Heat from lighting, appliances and equipment is part of the model, so our drawings give the circuit watts and equipment schedule that the analyst needs. We also avoid placing hot equipment, such as a boiler cupboard or an electric hob extract, in single-aspect rooms where it can be moved.

    Water is covered by a separate policy. New residential development has to meet 105 l/person/day, and refurbishment must meet BREEAM water credits. The electrical sheet records the shower type, pumped supplies and any water-heating equipment, so the figure can be checked against what is fitted.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for Tower Hamlets

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Policy D.ES10 Overheating: new development must avoid overheating and minimise air conditioning; majors evidence compliance in the design and access statement including overheating analysis against a mid-range 2030s climate scenario; London Plan cooling hierarchy applies.Majors: 2030s mid-range climate analysis—towerhamlets.gov.uk, Tower Hamlets Local Plan 2031 (adopted 15 January 2020), Policy D.ES10, paras 14.72-14.74, PDF p.174
    Policy D.ES6: new residential must achieve maximum water use of 105 litres per person per day; refurbishment and non-domestic to meet BREEAM water credits; major development must show water supply and sewerage capacity.105 l/person/day—towerhamlets.gov.uk, Tower Hamlets Local Plan 2031 (adopted 15 January 2020), Policy D.ES6 parts 1 and 3; PDF p.166-167
    Households living in a house12 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households23.1 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Domestic gardens share of land (GLUD 2005)7.4 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Conservation areas59 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries916 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    worldHeritageSites2 World Heritage Sites intersecting the LPA boundary—planning.data.gov.uk
    Householder applications granted92.7 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    AD P (2013) paras 3.4, 3.6 and 3.730 days—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Tower Hamlets
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    A borough of flats, rented homes and shared supplies

    Only 12 per cent of Tower Hamlets households live in a house, and 23.1 per cent are owner-occupiers. Electrical work here usually happens in a flat, with a landlord, a managing agent or a freeholder involved.

    We therefore write for more than one reader. A freeholder needs to see loads and any change to a riser, a managing agent wants a clear scope and a contractor needs a priced schedule. The drawing shows all three on one sheet, with the existing intake and any shared supply marked.

    Gardens are scarce, covering only 7.4 per cent of land, so outbuilding work is rare and roof terraces, balconies and lofts take its place. A terrace charger or a rooftop supply needs a cable route that does not cross a neighbour's property.

    Heritage and where fittings show

    The borough has 59 conservation areas, 916 listed building entries and 2 World Heritage Sites. Officers made 191 householder decisions in the latest year, with 92.7 per cent granted.

    In Spitalfields, Bethnal Green and the Wapping warehouses, original brick, timber and plaster are what buyers pay for. We draw surface-mounted routes and concealed risers where they protect that fabric, and mark any cut for the heritage officer. Our architectural drawings in Tower Hamlets page lists the designations in full.

    Working in a flat, a warehouse or a roof terrace

    A warehouse conversion has high ceilings, exposed brick and few places to hide cable. We design the routes first: surface containment where it is part of the look, concealed risers where the brick is protected, and dedicated lighting tracks that the occupier can reconfigure without touching the wiring.

    On a roof terrace the question is weather and safety. External sockets, lighting and a charger need weatherproof enclosures, residual current protection and a route that does not cross another leaseholder's space. Our drawing shows each piece at the position the contractor will fix it, with the isolator where it can be reached.

    For a flat extension, we fix the supply capacity at the start, because an overloaded riser found after work has begun can hold the project up.

    A last practical point concerns access. In a block with a managing agent, work on a riser or the landlord's supply needs a method statement and a booking, so our scope note lists which tasks touch shared plant and which stay inside the flat. That lets the agent approve the job in one read and keeps the programme moving.

    National rules and what we issue

    Part P work is certified within 30 days of completion, fixed lighting must meet 75 lumens per circuit watt now and 105 later, and new dwellings with parking need a charge point of at least 7 kW.

    Each issue contains a plan per floor, a schematic and a schedule, checked by a second technologist. See also the MEP design service in Tower Hamlets, your building regulations drawings and the electrical design drawings hub.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does Tower Hamlets require overheating analysis for a flat extension?

    The overheating policy requires it for major schemes, with Majors: 2030s mid-range climate analysis. A smaller scheme must still avoid overheating, and we advise on what evidence is proportionate.

    What water limit applies to new homes?

    The water policy sets 105 l/person/day for new residential development.

    Can you draw electrics when the freeholder controls the riser?

    Yes. We mark the shared riser and show only the changes the freeholder must approve.

    How much do electrical design drawings cost in Tower Hamlets?

    Fixed quote after a free constraints check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.