020 7864 7245Request a fixed quote

Hackney, London

Electrical design drawings in Hackney

Electrical design drawings in Hackney set out the consumer unit, circuits, lighting and charge point of a flat or terrace on one plan. Hackney's validation checklist asks for an energy strategy for any scheme that adds a home, and an overheating risk assessment even for minor applications. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on electrical design drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    House extension under construction with scaffolding, new glazed doors and building materials

    Hackney's checklist: why electrics are part of the application

    The council's planning application validation checklist asks for an Energy Strategy Statement on all majors and on any application providing one or more homes. Our data records the threshold as "1+ dwellings". A Sustainability Impact Assessment follows at a lower bar, recorded as "1+ dwellings; 1,000 sq m; 0.5 ha; 1 ha", so a single new flat triggers it.

    The third line matters most for electrics. An Overheating Risk Assessment is required for all majors and for all minor applications, and the checklist's own example is fitting mechanical ventilation such as an air-conditioning unit. Our data reads "All majors and minors".

    The consequence for electrical design is direct. A flat conversion that adds a cooling unit is asked to explain why, and the circuit for that unit should match that explanation. We draw the unit, its protective device and the route, and we show the passive measures alongside, so the application is not undermined by the wiring.

    Brick house being extended, with a wide new opening supported over the ground floor

    Local figures for Hackney

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Energy Strategy Statement is required for all major applications, for any application providing 1 or more residential units, and for non-residential development creating additional floorspace.1+ dwellings—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, row 'Energy Strategy Statement'
    Sustainability Impact Assessment required for buildings of 1,000 sq m GIA or more, any residential development of 1 or more units, residential sites of 0.5 ha or more, and any site of 1 ha or more. BREEAM pre-assessment only for non-residential schemes creating 100 sq m or more.1+ dwellings; 1,000 sq m; 0.5 ha; 1 ha—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, rows 'Sustainability Impact Assessment' and 'BREEAM Pre Assessment'
    Overheating Risk Assessment is required for all major applications and for all minor applications (the list gives installation of mechanical ventilation such as air-conditioning units as an example).All majors and minors—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, row 'Overheating Risk Assessment'
    Households living in a house18.8 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households24.6 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Article 4 directions77 Article 4 directions published by the council—planning.data.gov.uk
    Article 4 direction areas197 Article 4 direction area polygons published by the council—planning.data.gov.uk
    Conservation areas37 named conservation areas published by the council—planning.data.gov.uk
    Heritage at Risk entries40 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Householder applications granted84.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    AD P (2013) paras 3.4, 3.6 and 3.730 days—gov.uk
    AD S (2021) para 6.2, PDF p.357 kW—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hackney
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Electrical design drawings in Hackney: terraces, conversions and new flats

    Hackney has 106,081 households and just 18.8 per cent of homes are houses, so most drawings are for flats in converted Victorian terraces or purpose-built blocks. Only 24.6 per cent of homes are owner-occupied, so many clients are landlords or housing providers handling several units.

    We therefore draw each unit with its own consumer unit schedule and a clear division between the flat's supply and the landlord's common circuits. Separate supplies, fire detection links and emergency lighting are shown on one plan, and the same set can go to building control with the building regulations drawings in Hackney.

    Retrofit and the borough's guidance

    Hackney publishes a "Retrofit SPD" and a "Residential extensions and alterations SPD". The retrofit document matters to electrics because retrofit means heat pumps, solar panels and battery storage, and each needs a supply that an old terrace board may not have spare capacity for.

    Before specifying anything, we mark the existing board, its age and the number of free ways, then draw the upgrade: a new consumer unit if needed, a dedicated circuit for the heat pump, a generation meter position for solar. We say clearly where an installer must check supply capacity with the network operator.

    Article 4 and heritage in Hackney

    Hackney has 77 Article 4 directions covering 197 areas, with 37 conservation areas and 555 listed building entries. 40 entries are on the Heritage at Risk Register.

    Those designations bear on the visible edge of electrical work: boxes, cables and charge points on front elevations and on roof slopes. We keep fittings to rear and inner faces and mark any exception for a decision.

    Application record and local plan

    Hackney decided 415 householder applications in the latest figures, granting 84.6 per cent and deciding 91.3 per cent in time. The local plan in force is the "Hackney Local Plan 2033 (LP33)", adopted in 2,020.

    If your electrics belong to a flat conversion, construction drawings in Hackney share the same model.

    Part P certificates and charging

    Part P certificates for notifiable work are due within 30 days of completion. A charge point on a new dwelling is specified at a nominal output of at least 7 kW.

    We draw positions and routes. Installers calculate, test and certify. The national electrical design drawings page lists the rules.

    Checking the board before you commit

    Many Hackney flats have a board that predates the equipment now plugged into it. Before you add a heat pump, an induction hob or a charge point, find out how much spare capacity the supply really has.

    We start by recording the main fuse rating where visible, the number of free ways and the type of protection on each circuit. We draw an upgrade where one is needed, with a note that the network operator must confirm the supply, since that is a decision for them.

    It is a simple step that avoids a late surprise, and it gives the application's energy strategy a credible electrical basis.

    Next steps

    Send a plan, tell us whether the work adds a home and we check Hackney's list before pricing. See also electrical design drawings in Haringey for the borough to the north.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does Hackney want an overheating assessment for a minor application?

    Yes. The checklist asks for one on all minor applications as well as majors, and gives mechanical ventilation as an example.

    Do I need an energy strategy for one new flat?

    The checklist asks for an Energy Strategy Statement on any application providing one or more homes.

    Can I add a heat pump to a Hackney terrace?

    Often yes, but the board may need upgrading. We mark capacity and say what the installer must confirm.

    Who issues the electrical certificate?

    The registered installer or building control body, within 30 days of completion.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.