020 7864 7245Request a fixed quote

Islington, London

Electrical design drawings in Islington

Most Islington homes are flats or tall Georgian and Victorian terraces, where cables run through party walls, shared risers and listed fabric. Our electrical design drawings in Islington show the consumer unit, circuits, lighting and any charge point or solar panel, and note how they fit the council's sustainable design policy. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on electrical design drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Islington's sustainable design policy and electrical design drawings in Islington

    Islington's Local Plan is blunt: every application needs a Sustainable Design and Construction Statement, and that includes basements, roof extensions and loft conversions. The policy divides applicants by size. The thresholds in the rule are 100 sq m; 500 sq m BREEAM, the first being the size at which an extension must supply an Energy Strategy, adaptive design and water-management information, and the second the point at which the validation list asks for a BREEAM Domestic Refurbishment pre-assessment.

    Smaller extensions still need to say something, but proportionately. That is where the electrical drawing helps. A one-page power and lighting schedule shows fixed-lighting efficiency, the absence of electric resistance heating, any heat pump circuit and the spare way for a charger, which gives the officer concrete evidence instead of a paragraph of intent.

    Overheating is the neighbouring rule. The overheating policy is summed up as Majors: future-climate modelling. Under the cooling hierarchy, active cooling is a last resort, so we avoid specifying air conditioning circuits unless the lower steps cannot work. Our layout keeps heat-producing equipment out of single-aspect rooms where we can.

    Two-storey rear extension under construction on a semi-detached house

    Local figures for Islington

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Policy S2: every application needs a Sustainable Design and Construction Statement (including basements, roof extensions and loft conversions). Majors, minor new build and 'larger minor extensions' of 100 sq m or more must include Energy Strategy, Adaptive Design, Landscape Design, Integrated Water Management and Operational Sustainability; smaller extensions need proportionate information. Validation list also requires a BREEAM Domestic Refurbishment pre-assessment of 'Excellent' for residential extensions over 500 sq m gross or five or more dwellings.100 sq m; 500 sq m BREEAM—islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S2 B-C, p.188; paras 6.16-6.18, p.189; validation item 4.8, pp.24-25
    Policy S6: all developments except smaller minor extensions (under 100 sq m) must show how the design reduces overheating following the cooling hierarchy; majors must submit internal temperature modelling under projected future summer temperatures; smaller extensions are encouraged to use hierarchy levels 1-3 and active cooling will not be accepted unless higher levels cannot work.Majors: future-climate modelling—islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S6 A-E, p.207
    Households living in a house16.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households26.7 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Average price, terraced1,151,398 GBP2026-07publicdata.landregistry.gov.uk
    Conservation areas41 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries1,050 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Registered parks and gardens3 registered parks and gardens intersecting the LPA boundary (Historic England)—planning.data.gov.uk
    Supplementary planning documentIslington Urban Design Guide SPD2017islington.gov.uk
    Building Regulations 2010 reg.12(6A) and (9); AD P (2013) para 2.5, PDF p.14new circuit; consumer unit replacement; additions or alterations to circuits in a special location—legislation.gov.uk
    AD P (2013) paras 3.4, 3.6 and 3.730 days—gov.uk
    AD L Vol 1 (2021 incl 2023) para 6.58, PDF p.60; AD L Vol 1 (2026) paras 5.57 and 5.59, PDF p.65105 lm/W—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Islington
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    A borough of flats: the wiring consequences

    Only 16.3 per cent of Islington households live in a house, and just 26.7 per cent own their home. The typical client is therefore a leaseholder, a landlord or a freeholder converting a building, and the electrical work usually touches things other people own: a shared riser, a landlord's supply, a neighbour's ceiling void.

    We begin with a survey of the existing intake, meter positions and consumer unit, and we mark which equipment serves your flat alone. New circuits are drawn so each can be isolated without losing the whole flat, and loads are added up so a leaseholder can show the freeholder the supply is not being overdrawn. Where a licence to alter is needed, the same sheets go in the application.

    Terraced houses are rarer but valuable: the average terraced price is £1,151,398, and at that level a full rewire is planned as a project, with the existing lath-and-plaster walls and cornices protected where cable routes would otherwise cut across them.

    Conservation areas, listed buildings and the visible electrics

    Islington has 41 conservation areas, 1,050 listed building entries and 3 registered parks and gardens. Internally, listed status limits where chases and boxes can go: cables cannot be buried through decorative plaster, and surface trunking has to be justified.

    In conservation areas the external items are the focus: a meter cabinet on a front wall, a charge point on a street frontage, a camera or security light. We draw each on the elevation so it can be placed, sized and finished to suit. Our architectural drawings in Islington page covers the designations and the borough's design guide, the Islington Urban Design Guide SPD.

    The Part P and lighting rules we draw to

    Part P covers new circuit; consumer unit replacement; additions or alterations to circuits in a special location, and certification is due within 30 days of completion. The lighting standard is 75 lumens per circuit watt today and 105 under the later edition, so we specify fittings that already meet the higher figure and the drawing does not date.

    The set joins your building regulations drawings in Islington and your SAP calculations, which use the same lighting and heating data. For the full scope, see the electrical design drawings hub.

    A sensible order of work in an Islington flat

    Start with the survey. In a flat above a shop or in a converted townhouse, the first visit establishes where the intake enters, who owns the meter, whether the earth bonding is in place and what the previous owner left behind. Those findings go on the front sheet as assumptions, so the contractor prices from the same facts we drew from.

    Next comes the layout. We fix the kitchen and bathroom plans before placing a single socket, then group circuits by use rather than by floor, so a fault on the cooker never takes the fridge with it. Finally the schedule and the schematic are cross-checked against each other, and a second technologist reads the set cold.

    How the sheets reach site

    After a free constraints check we confirm what is changing, run the survey, draw the sheets and have a second technologist check them against the architectural set. The pack contains a plan for each floor, a schematic and a schedule. You receive a fixed quote before any drawing starts.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    House extension under construction with scaffolding, new glazed doors and building materials
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does an Islington loft conversion need a Sustainable Design and Construction Statement?

    Yes, the council applies that policy to roof extensions and loft conversions as well as larger schemes. Smaller ones need proportionate information, and our electrical schedule supplies part of it.

    Can I run new cables in a listed Islington flat?

    Possibly, but routes through decorative fabric need consent. We draw every chase so the heritage officer can see it.

    How soon after completion must Part P work be certified?

    Within 30 days, by the installer or building control body.

    How much do electrical design drawings cost in Islington?

    Fixed quote after a free constraints check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.