Lewisham, London

Structural engineering in Lewisham

Lewisham mixes Victorian terraces in Brockley and Deptford with interwar semis in Catford and Downham, and each needs its structure designed in a different way. Fixed quote after a free constraints check. We engineer the beams, foundations and roof steel for your plans.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on structural engineering

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Lewisham's structural survey rule and where it applies

    Lewisham keeps its structural requirements for planning to historic buildings. The minor applications checklist asks for a structural survey where there are substantial alterations to a listed building or a non-designated heritage asset, with the council's own wording as Listed / heritage assets. The survey must describe condition, structural problems, repair options and cost.

    The major applications list repeats the idea at larger scale. Its item for significant works to existing, mainly historic buildings reads Includes basements, which pulls basements into the same requirement. For a family home that is neither listed nor a heritage asset, neither list asks for engineering at the planning stage.

    That does not mean the structure can wait. Building control examiners ask for the same sums a few weeks later, and a loft or opening designed without them can need redrawing. We therefore engineer the structure alongside the planning drawings, so that nothing drawn at consent has to move.

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Local figures for Lewisham

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Minor list item 32: Structural Survey for applications involving substantial alterations to a Listed building or non-designated heritage asset; describes condition, structural problems, repair options and cost and a demolition methodology, prepared by a suitably qualified professional.Listed / heritage assets—consultation.lewisham.gov.uk, Lewisham Validation Checklist: Planning Permission for Minor Development (July 2022), item 32, p.24
    Major list item 39: Structural Survey required for significant works to existing buildings (primarily historic) including basements.Includes basements—lewisham.gov.uk, Lewisham Validation Checklist: Major Applications Local List (July 2022), item 39, p.13
    Households living in a house42.2 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households41.9 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Conservation areas30 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries367 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Article 4 directions57 Article 4 directions published by the council—planning.data.gov.uk
    Heritage at Risk entries21 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Householder applications granted89.4 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    AD A para 2C236 m—gov.uk
    AD A paras 0.1-0.2, PDF p.8, and 2C3, PDF p.15Where the work falls outside the AD A Section 2 tables, or uses beams, steelwork, underpinning or removed load-bearing walls and chimney breasts—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Lewisham
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Two kinds of Lewisham house, two kinds of structure

    About 42.2 per cent of Lewisham households live in a house or bungalow, and 41.9 per cent own their home. That shows in the work: lofts, rear extensions and garage conversions are common, not only flat refits.

    Victorian terraces, as in Brockley and Lewisham Park, have solid brick walls, timber floors and a cut roof. A rear opening needs a beam that bears on a padstone in an old wall, and the chimney stack above must be held. Interwar semis in Catford and Grove Park are lighter. Their cavity walls and thin ground slabs suit a side or rear extension, but a loft needs the roof strengthened with steel because the original timbers were sized for tiles alone.

    Approved Document A limits floor spans onto simplified-rule walls to 6 metres. Beyond that, or where the work uses steel, a removed wall or underpinning, the guidance says calculations are needed: Where the work falls outside the AD A Section 2 tables, or uses beams, steelwork, underpinning or removed load-bearing walls and chimney breasts.

    Heritage, Article 4 and the shape of the borough

    Lewisham has 30 conservation areas, 367 listed buildings and 57 Article 4 directions that cover 89 mapped areas. Its heritage list shows 21 assets at risk, and the borough contains 1 world heritage site within its boundary. Roofs and front elevations in the Article 4 areas are the places where structure and appearance meet.

    If you live in one of those streets, a loft needs a clear view of what the direction restricts before the steel is sized, because the roof shape you can build decides the ridge beam and the floor loading. Our loft conversion drawings in Lewisham carry that planning check, and the structural design follows what they allow.

    Our house extension drawings in Lewisham deal with the rear and side additions that make up most of the other work.

    Garage conversions in the interwar suburbs raise one more structural point. The garage door opening has to be closed with a wall that can carry the lintel's load, and the footing under the new wall must be deep enough to avoid movement against the old slab. We draw the infill wall, the new foundation and the floor build-up on one sheet, so the builder is not left to work them out on site.

    Decisions, timing and building control

    Lewisham decided 578 householder applications in its latest year, granted 89.4 per cent and decided 95.2 per cent in time. Planning is quick enough that the structural design is often the pacing item, so we start it as soon as the layout is settled.

    Full plans for building control are decided within 5 weeks. Where a shared wall is involved, a neighbour who does not appoint a surveyor within 10 days of a request lets the other owner appoint one, so serving notices early keeps the programme moving. A structural drawing attached to the notice gives the surveyors something definite to assess, and it shortens the exchange that follows. Our building regulations drawings in Lewisham put the engineer's work into the submission.

    Quote and next step

    Send the address, photographs of the walls and roof, and any drawings you hold. We check heritage status and neighbours, then quote a fixed fee. For a single beam, see structural calculations in Lewisham, and for the borough as a whole read architectural drawings in Lewisham.

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    Brick house being extended, with a wide new opening supported over the ground floor
    Load take-down
    Brush across the bars.

    Questions

    Does Lewisham ask for a structural survey with my planning application?

    Only for substantial work to a listed building or heritage asset, where the council's list says Listed / heritage assets.

    Do basements need a survey in Lewisham?

    On major applications the council's list says Includes basements.

    Can an interwar semi take a loft without new steel?

    Rarely. The original roof timbers carried tiles only, so a conversion normally needs steel and checked supports below.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.