Lambeth's terraces in Brixton, Clapham and Stockwell need structural design for almost every serious alteration, and the council's basement guidance sets out who must certify it and how far ground movement can reach. Fixed quote after a free constraints check. We design the structure to meet those tests.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on structural engineering
Four steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
How Lambeth wants structural work certified
Lambeth's Local Plan is direct about competence. Structural methodology statements for basements must be certified by a chartered engineer, and the plan records it as MICE or MIStructE certifies; CARE for listed. It adds that the council has no in-house expertise, so the applicant pays for independent assessment of any basement impact assessment that goes beyond the first stage.
The Design Guide SPD Part 5 then describes what has to be shown. A basement application needs structural stability assessment required for basements, and the design team should include qualified hydrologists and engineers, with the council noting chartered civil engineer; pre-application neighbour consultation. Applicants are encouraged to talk to neighbours before applying, because those neighbours will read the structural statement closely.
Where a listed building is involved the bar is higher again. The SPD asks for structural survey for basements affecting/adjoining listed buildings, and a conservation-accredited engineer should be consulted. We ask whether the building is listed at the first call.

Local figures for Lambeth
| Measure | Value | Period | Source |
|---|---|---|---|
| Structural methodology statements for basements must be prepared and certified by a Chartered Civil Engineer (MICE) or Structural Engineer (MIStructE), and a geo-hydrologist where appropriate; for listed buildings the engineer should be CARE accredited. The Council has no in-house expertise and applicants pay for independent assessment of any BIA beyond Stage 1. | MICE or MIStructE certifies; CARE for listed | — | lambeth.gov.uk, Lambeth Local Plan 2020-2035 (adopted September 2021), Supporting text para 10.137, PDF p.232 (printed 226) |
| Policy EN5 supporting text: for basement and underground development the Council requires an assessment of the impact on drainage, flooding, groundwater conditions and structural stability, and the proposal must not cause ground instability. | structural stability assessment required for basements | — | lambeth.gov.uk, Lambeth Local Plan 2020-2035 (adopted September 2021), Para 9.44, PDF p.176 (printed 170) |
| Basement works affecting or adjoining a listed building need a structural survey. Specialist conservation engineers should be consulted, and the impact on the listed building assessed in the BIA and the Construction Management Plan, with a contractor or consultant experienced in historic structures involved. | structural survey for basements affecting/adjoining listed buildings | — | lambeth.gov.uk, Lambeth Design Guide SPD Part 5: Basements (2023), Para 5.70, PDF p.16 |
| A draft Construction Management Plan is required with the planning application and a finalised CMP as a pre-commencement condition. The CMP is separate from the BIA and must cover ground and structural stability and groundwater: monitoring and contingency plans, detailed method statements, evidence of the contractor's and designers' relevant experience, temporary and permanent support, and a suitably qualified engineer to inspect and monitor critical temporary and permanent works. | draft CMP at application; final CMP pre-commencement | — | lambeth.gov.uk, Lambeth Design Guide SPD Part 5: Basements (2023), Paras 5.148-5.150, PDF p.33 |
| Basement construction causes ground movement that can affect an area up to about four times the excavation depth away; damage risk is categorised using the Burland Scale (category 0 negligible, 1 very slight, rising to 5 very severe). | zone of influence about 4 x excavation depth; Burland Scale | — | lambeth.gov.uk, Lambeth Design Guide SPD Part 5: Basements (2023), Paras 5.120-5.122, PDF p.26 |
| Local List item 23: a Demolition Method Statement is required for all applications for demolition (Local Plan Policy T8). | Demolition Method Statement for all demolition | — | lambeth.gov.uk, Lambeth Local Information Requirements (the Local List) 2024, Item 23, PDF p.28 (printed p.27) |
| Households living in a house | 24.8 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Owner-occupied households | 33 % of households owner-occupied (owned outright or with mortgage/loan) | Census 2021 | nomisweb.co.uk |
| Conservation areas | 64 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 953 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Tree preservation orders | 339 tree preservation orders published by the council | — | planning.data.gov.uk |
| Householder applications granted | 83.4 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Ground movement, damage categories and the construction plan
The SPD gives a useful rule for neighbours: zone of influence about 4 x excavation depth; Burland Scale. A basement dug in one house can therefore move the ground under houses several doors away, and the Burland categories rank the likely damage from negligible to very severe. Designing to the lowest categories means stiffer retaining walls and a careful underpinning sequence.
Construction management has its own two-stage test. The council wants draft CMP at application; final CMP pre-commencement, and its Local List widens the circle: draft CMP for majors and nuisance-causing minors incl. basements. A demolition proposal needs separate treatment, since the Local List requires Demolition Method Statement for all demolition.
For listed buildings the Local List goes further: schedule of works + method statement for all LBC. That is a paperwork task as well as an engineering one, and our drawings are laid out room by room so that the schedule can be cross-referenced to them.
The Lambeth house and the work it needs
About 24.8 per cent of Lambeth households live in a house, and 33 per cent own their home. A large share of structural work is therefore inside converted Victorian houses where each flat has its own owner, and where a beam under one floor sits in the ceiling of the next.
The borough has 64 conservation areas, 953 listed buildings, 12 Article 4 directions covering 223 mapped areas, and 339 tree preservation orders. Street trees limit where piles and trial pits can go, and Article 4 directions limit changes visible from the street.
A typical project is a rear and side-return extension that removes the back of the ground floor. The engineering is a steel frame set on new strip or trench-fill foundations, plus a check on the old party walls that will now carry more load. Our rear extension drawings in Lambeth cover the planning route for that work, and our loft conversion drawings in Lambeth cover the roof.
Flats bring a different set of questions. Opening a wall inside a first-floor flat may load a beam onto a wall in the flat below, and the freeholder will want the calculations before a licence is signed. We write the structural note so that it can go straight to a managing agent, with load paths drawn through every floor affected, not only the one being altered.
Timing, notices and building control
The Building Regulations require notice 2 days before work starts, and a party wall neighbour has 14 days to respond to a notice before a dispute is deemed. Both clocks should be running before a contractor mobilises.
Lambeth decided 595 householder applications in its latest year and granted 83.4 per cent, with 93.4 per cent decided in time. Planning is therefore predictable enough to plan around, and the structural package can be finished while the application is with the council. Our building regulations drawings in Lambeth then put the finished design to an inspector.
Quote and next step
Send the address, photographs of the structure you want to change and any plans. We check the listing, trees, neighbours and ground, then quote a fixed fee. If only the beam needs sizing, structural calculations in Lambeth is the narrower service, and architectural drawings in Lambeth gives the borough overview.
What you receive


Related pages
Other services in Lambeth
Questions
Who must certify a Lambeth basement structural statement?
A chartered engineer. The council's plan records it as MICE or MIStructE certifies; CARE for listed.
How far can a basement affect neighbouring houses in Lambeth?
The SPD gives the working rule as zone of influence about 4 x excavation depth; Burland Scale.
Do I need a demolition method statement for a knock-down?
Yes. Lambeth's Local List requires Demolition Method Statement for all demolition.
Sources and dates
- lambeth.gov.uk, retrieved
- lambeth.gov.uk, retrieved
- lambeth.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.