Structural calculations for a Hackney home start at £295 including VAT. Hackney's building control lists calculations for full plans and, in a building notice, only where necessary, so the first question is which route suits your job.

From £295 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Hackney's building control routes for structural calculations

    On its application types page, Hackney says that a full plans submission should include plans, specifications and calculations sufficient to show the work complies. For a building notice the same page lists the form, fee and site plan, noting if necessary structural calculations.

    In practice the difference is timing. With full plans the examiner checks the structure before you start. With a building notice you begin sooner but the checking happens on site, and a missing calculation can stop work. For a load-bearing opening or a loft we usually advise having the calculation in hand either way.

    The council's current schedule of fees gives building notice charges for structural work. Its table lists Through lounge GBP 339.15; loft GBP 763.35; basement GBP 1,356.60 (inc VAT, building notice). These are the council's charges, separate from our fee.

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Local figures for Hackney

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Full plans stage one should include sufficient detailed plans, specifications and calculations to show the works comply with the Regulations.plans, specifications and calculations—hackney.gov.uk, Building control application types, Full plans
    Building notice: application form, fee and site plan, listed with '(and if necessary structural calculations)'.if necessary structural calculations—hackney.gov.uk, Building control application types, Building notice
    Table B (Hackney Schedule of Fees, effective 1 April 2025): Through Lounge building notice 339.15 inc VAT; Loft up to 40 m2 763.35; new or extended basement incl underpinning up to 60 m2 1,356.60; underpinning of terrace property up to 60 m2 848.40.Through lounge GBP 339.15; loft GBP 763.35; basement GBP 1,356.60 (inc VAT, building notice)—docs.google.com, Hackney Schedule of Fees and Charges, effective 1 April 2025, Table B
    Structural Survey required only for demolition or conversion of a listed building, or demolition of an identified heritage asset; no basement-specific structural statement or Basement Impact Assessment row appears in the checklist.Listed/heritage only—docs.google.com, Hackney Planning Service, Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, row 'Structural Survey'
    SPD paras 1.40-1.42: structural alterations such as loft conversions require Building Regulations approval; applicants must ensure the proposal can be built in compliance with the Building Regulations. The SPD sets no structural survey or basement structural statement requirement.Building Regulations for structural alterations—drive.google.com, Hackney Residential Extension and Alterations SPD, December 2025, Paras 1.40-1.42, printed p.11
    Flood Risk Assessment is required for 'major development and basement development in Critical Drainage Areas and areas with a high risk of surface water flooding or an elevated risk of groundwater flooding in flood zone 1', and for development in Flood Zones 2 and 3.Basement development in CDAs / elevated groundwater risk—docs.google.com, Hackney Planning Application Validation Checklist (Google Doc linked from hackney.gov.uk/submit-planning-application), Local Requirements table, row 'Flood Risk Assessment', item (iv)
    Residential Extension and Alterations SPD ch.7 (adopted December 2025, in effect January 2026): basements should be single storey, with minimum 2.15 m headroom, less than 1.5 times the host building footprint, no more than 50% of garden depth/area, with at least 1 m of suitable soil above any part beyond the building footprint, SuDS, and careful consideration of trees and root protection areas; loss of entire front gardens to lightwells is resisted.Single storey; <1.5x footprint; 1 m soil cover; 2.15 m headroom—drive.google.com, Hackney Residential Extension and Alterations SPD, December 2025, Chapter 7 Basements, printed p.60; ch.8 p.63
    Households living in a house18.8 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households24.6 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Householder applications granted84.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Conservation areas37 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions77 Article 4 directions published by the council—planning.data.gov.uk
    AD A title pageApproved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hackney
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Terraces, flats and the Article 4 streets

    Only 18.8 per cent of Hackney's 106,081 households live in a house or bungalow, and 24.6 per cent own their home. Structural work here is often inside a flat or a converted terrace, where a lease sets conditions on the wall you want to open.

    The borough has 37 conservation areas and 77 Article 4 directions, mapped as 197 separate areas. Article 4 limits permitted development on some elevations and roofs, so structure and appearance should be decided together.

    Hackney's householder decisions give a sense of scale: the council decided 415 in its latest year and granted 84.6 per cent. Those figures cover every kind of householder project, so they say little about a beam, but they show how much householder work the council handles.

    In a Victorian terrace, a rear opening between kitchen and dining room may also mean taking out the chimney breast. Each of those means support for the stack and a beam sized for the span.

    What the December SPD says about structure

    Hackney's Residential extensions and alterations SPD, adopted in December and in effect from January, says in its paragraphs on structure that alterations such as loft conversions need Building Regulations approval, and that you must show the proposal can be built to comply. We use that as the working rule: Building Regulations for structural alterations.

    The planning checklist says little about structure. It asks for a structural survey in one case, recorded as Listed/heritage only, and for air quality and waste information where demolition and construction are significant: Significant demolition/construction.

    The council also publishes a Retrofit SPD. Insulation can change wall thicknesses and loads at the edges of a floor, so a retrofit alongside a structural alteration is worth coordinating on one survey. Our survey records wall build-up, floor depth and what sits above each opening, and the same notes serve the structural calculation and the retrofit design.

    Before the calculation is issued, a second technologist checks each figure against the layout. A beam that is correct in the working but drawn one size smaller on the plan is exactly the error an examiner or a builder will find, and we would prefer to find it first.

    Basements in Hackney

    Hackney asks for a flood risk assessment for Basement development in CDAs / elevated groundwater risk. The SPD then sets design limits for a basement: Single storey; <1.5x footprint; 1 m soil cover; 2.15 m headroom.

    The beam calculation for the house above is only part of the structural case for a basement. Underpinning and excavation need an engineer and a ground investigation, and we say so when the brief includes one. If you are only altering the ground floor, none of this applies.

    Hackney price and the set you get

    Structural calculations start at £295 including VAT, fixed after the constraints check. You receive the calculations, a beam and padstone schedule and a layout drawing, normally about a week after the survey. A technologist who did not draft the set checks it, and we revise at no charge if the examiner asks.

    The calculations feed our building regulations drawings in Hackney, and the planning drawings in Hackney when an application is needed.

    Nearby pages

    See architectural drawings in Hackney for the borough, or the structural calculations service page. Across the border, structural calculations in Haringey shows how that council words its requirements.

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    Brick house being extended, with a wide new opening supported over the ground floor
    Load take-down
    Brush across the bars.

    Questions

    Does Hackney need structural calculations?

    For full plans, yes: the council lists plans, specifications and calculations. For a building notice the council adds: if necessary structural calculations.

    How much do structural calculations cost in Hackney?

    From £295 including VAT, fixed up front. Hackney's building control fees are separate.

    Does Hackney need a structural survey for planning?

    Rarely. The checklist records the requirement as Listed/heritage only: demolition or conversion of a listed building, or demolition of a heritage asset.

    Are there limits on basements in Hackney?

    Yes. The December SPD records: Single storey; <1.5x footprint; 1 m soil cover; 2.15 m headroom.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.