020 7864 7245Request a fixed quote

Havering, London

Wraparound extension drawings in Havering

Wraparound extension drawings in Havering begin with a map check, because Green Belt covers 53% of the borough while only 11 conservation areas exist. We are MCIAT chartered architectural technologists, and the drawings start at £1,195 including VAT. The council decided 97.8% of householder applications on time in the latest twelve months.

From £1,195 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on wraparound extension drawings

    Nine steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    8. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    9. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Two-storey rear extension under construction on a semi-detached house

    Havering: Green Belt first, conservation second

    Over half of Havering's land area is mapped as Green Belt, which is unusual for a London borough, so the first question for a wraparound is not the design but the address. Inside the Green Belt, the council asks whether an extension is proportionate to the original dwelling, so a house that has already been extended carries less room.

    Conservation areas are the lesser constraint here, only 11 of them, and 146 list entries across the whole borough. Most Havering homes can therefore be tested against the ordinary design guidance instead of a heritage regime.

    The guide is the Residential Extensions and Alterations SPD, read alongside the current local plan, Havering Local Plan 2016-2031, which the council adopted in 2,021. A separate Heritage SPD applies where a heritage asset is involved.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for Havering

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas11 named conservation areas published by the council—planning.data.gov.uk
    Green Belt share of the council area53 % of council area covered by green-belt polygons—planning.data.gov.uk
    Listed building entries146 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Householder decisions985 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted85.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time97.8 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Households living in a house76.7 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Average house price448,648 GBP2026-07publicdata.landregistry.gov.uk
    Domestic gardens share of land (GLUD 2005)19.5 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Supplementary planning documentResidential Extensions and Alterations SPD2011havering.gov.uk
    Mayoral CIL rate (indexed)30.3 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Householder: alterations/extensions to a single dwellinghouse, from 1 Apr 2026548 GBP—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Havering
    Single-storey rear extension: the permitted development limitsDepth beyond the original rear wall: 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey. Maximum height: 4 m. Within the zone near the boundary: Eaves no higher than 3 m where within 2 m of the curtilage boundary. Larger extension under prior approval: 6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSIABCD

    Single-storey rear extension: the permitted development limits

    The house in section with a rear extension; the dashed lines mark the zone near the boundary.

    A · Depth beyond the original rear wall
    3 m (attached) / 4 m (detached) beyond the original rear wall, single storey
    B · Maximum height
    4 m
    C · Within the zone near the boundary
    Eaves no higher than 3 m where within 2 m of the curtilage boundary
    D · Larger extension under prior approval
    6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSI

    A borough of semis and owners

    76.7% of households live in a house or bungalow, and 69.5% own their home, which makes Havering a strong match for wraparound work. The typical project is a semi or a bungalow with room at the side and a long garden behind.

    With an average price of £448,648, the extra floor area has to be balanced against build cost more carefully than in an inner borough. We often show two versions: a full wraparound, and a trimmed one with a shorter side arm, so you can price both before committing.

    Domestic gardens account for 19.5% of the borough's land, and plenty of plots have depth to spare. That depth is why a rear arm is rarely the problem here; the side arm and the roof are.

    How Havering decides applications

    The council made 985 householder decisions and granted 85.9%, with 97.8% decided in time. That record suggests most applications get an answer inside the statutory window, which makes a precise submission even more valuable.

    Larger home extension prior approvals show a more mixed picture, with 21 granted and 27 refused in the latest return year. A wraparound with a side element would usually go through a full householder application, with a council fee of £548.

    If the design sits inside the permitted limits, a Lawful Development Certificate is an option, and Havering handled 578 of them in its latest return year.

    Building a Havering wraparound: access and structure

    The side arm of a wraparound closes the passage that builders normally use, so the site plan needs a working route. Where there is no side access we plan deliveries through the house or over a neighbour's drive by agreement, which should be settled in the party wall conversation, not on the first morning of the build.

    Structure matters too. Opening a whole rear and side wall means a steel frame carrying the upper floors, and many Havering semis and chalet bungalows have roof loads that need care. Sizing the steel at drawing stage also leaves room for a later loft conversion, which saves a second round of calculations.

    The energy rules cap glazing in an extension, and a corner room with sliding doors on two sides tests that cap quickly. We show the glazed area on the elevations and check it against the limit, so the design does not fail on a calculation after the planning stage.

    Levy, drawings and what you receive

    The Mayoral CIL sits in band 3 at £30.3 per square metre indexed this year, the lowest band. The levy generally applies to larger additions, so most single-storey wraparounds fall outside it, and we confirm that on the measured floor area.

    The set has existing and proposed plans, elevations and sections, a roof plan, a location plan and a block plan. If you are weighing alternatives, see rear extension drawings in Havering and side return extension drawings in Havering.

    Neighbours will receive party wall notices for the shared boundary, and our wider service is described on architectural drawings in Havering. If the council asks for changes, we redraw them free of charge until it decides.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every side considered
    Flick across the turntable to spin it.

    Questions

    How much of Havering is Green Belt?

    About 53% of the borough's area is covered by Green Belt polygons, so check the address before planning a wraparound.

    Which guidance applies to house extensions?

    The Residential Extensions and Alterations SPD, with Havering Local Plan 2016-2031.

    How quickly does Havering decide householder applications?

    97.8% were decided within eight weeks or an agreed extension in the latest twelve months.

    Can builders reach the garden once the side arm is built?

    Not through the passage, so we plan access through the house or by agreement with a neighbour before work begins.

    Do I need a structural engineer?

    Yes, for the steel that opens the rear and side walls. We size it at drawing stage so a later loft conversion does not need the work redone.

    How much do the drawings cost?

    From £1,195 including VAT. The council fee is £548.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.