Southwark, London
Construction drawings in Southwark
Construction drawings in Southwark give your builder the dimensions, junctions, structure and fire detail behind a permitted scheme. Southwark is mostly flats, heavily mapped for heritage and thick with Article 4 directions, so the sheets spend as much time on what must not change as on what will. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on construction drawings
Five steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Construction drawings in Southwark under hundreds of Article 4 directions
Southwark's data lists 480 Article 4 directions, mapped as 480 areas, together with 53 conservation areas and 919 Historic England list entries. Where a direction applies, changes to windows, doors, roofs and frontages that are normally permitted need an application.
That reaches into the technical set. A specification that would be routine elsewhere, such as swapping a sash for a casement or a slate for a concrete tile, may be a breach here. The sheets name the product for every visible element and show that it matches the permission, because that is what a compliance officer checks.
Only 21.8 per cent of Southwark's 130,818 households live in a house and 28.9 per cent own their home, so many projects here are a flat, a maisonette or a house split into several units, where the neighbours' interests must be drawn into the detail.

Local figures for Southwark
| Measure | Value | Period | Source |
|---|---|---|---|
| Article 4 directions | 480 Article 4 directions published by the council | — | planning.data.gov.uk |
| Article 4 direction areas | 480 Article 4 direction area polygons published by the council | — | planning.data.gov.uk |
| Conservation areas | 53 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 919 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Households living in a house | 21.8 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder applications granted | 94.8 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 2 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Average price, terraced | 838,160 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Approved Document B Vol 1, paras 1.1-1.2 | All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604 | — | gov.uk |
| Approved Document B Vol 1, 2019 ed. incl. 2026 amendments, para 2.10 | Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Flats, floors and fire between homes
In a converted building, fire and sound are the quiet headline of every construction set. When a floor is lifted, the new build-up is drawn in section with its insulation and ceiling, so the standard between dwellings still holds. Services that pass through the floor are drawn with their fire stopping.
Detection and escape are written onto the plans: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. For a bedroom above the ground floor, the opening must meet Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor.
A freeholder or managing agent will often ask for the drawings before consent to alter is given. The same set serves them, building control and the contractor, so nobody works from a different version.
What Southwark's planning figures tell an owner
The council decided 558 householder applications in its latest published year, granted 94.8 per cent and decided 95.3 per cent in time. Its Householder development SPD sets the design test. Whatever the rate, the technical set follows the permitted drawings without improvisation, because conditions are checked against them.
The statistics for large rear extension notifications are small by comparison: 7 granted and 2 refused. With so few houses, that route is rarely the main one. Planning drawings in Southwark usually come first.
Energy, stairs and ventilation in older Southwark buildings
Southwark's older buildings force compromises on energy and access. New elements still have to meet New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. In a solid-walled terrace, we draw the insulation on the inside face with a vapour strategy, so the wall can dry.
Stairs in a Victorian terrace are often steep and narrow. If a loft is added, the new stair has to meet Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm, and the section shows whether it can sit over the old one. Ventilation is set out too: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s.
Fee, checks and nearby boroughs
Terraced houses average £838,160 in Southwark. The fee is fixed after a free constraints check, and every sheet is checked by a second chartered technologist. Where a house is converted, we also draw the shared parts, since a stair or hall used by several households has its own fire and lighting requirements. The same set can be submitted as building regulations drawings in Southwark, with structural calculations in Southwark behind the beams. The borough overview is architectural drawings in Southwark, and the same service is available in Lambeth and Lewisham.
What you receive


Related pages
Other services in Southwark
Questions
What does an Article 4 direction mean for construction drawings in Southwark?
It can remove permitted rights, so visible elements must match the permission. The set names the exact product for windows, doors and roofs.
Can one set serve my freeholder, building control and my builder?
Yes. We draw it so each can read the same sheets, which avoids versions drifting apart.
Do I need construction drawings for a flat in Southwark?
For structural changes, new layouts and drainage work you will need technical information, and the lease may require it before consent.
How much do construction drawings in Southwark cost?
It is a fixed quote after a free constraints check, because the fee depends on the size and complexity of the building.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- southwark.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.