Construction drawings in the City of London

Homes in the Square Mile are few, mostly flats, and often listed, so a City construction set is closer to a technical file than a house-extension pack. We draw the build-ready detail, with the Barbican guidance in mind where it applies. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    Construction drawings in City of London: the Barbican guidelines and beyond

    The City of London Corporation is the planning authority for the Square Mile, and its local plan dates from 2,015: the City of London Local Plan 2015. For homes, the document we follow most closely on detail is the Barbican Estate Listed Building Management Guidelines: Volume I Introduction and Volume II Residential (SPD). It sets out what residents of the estate may alter and how.

    That matters because the guidelines work at the level of the individual flat: window frames, balcony treatment, internal changes that touch listed fabric. Our drawings are written to match them. Where an alteration needs listed building consent, that is a separate application, but the technical detail we draw is what the consent officer reads.

    Elsewhere in the borough, the same discipline applies in smaller doses. Outside the Barbican, a project still needs drawings a builder can price, whatever route it takes. Our planning drawings in City of London cover the cases that need consent.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for City of London

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Households4,914Census 2021 (21 March 2021)nomisweb.co.uk
    Households living in a house2 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Conservation areas28 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions1 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries637 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Scheduled monuments53 scheduled monuments intersecting the LPA boundary (Historic England)—planning.data.gov.uk
    Planning applications granted, all types (PS2)97 % of decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Lawful development certificate applications (PS1)16 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Mayoral CIL charging band1 MCIL2 charging band (1-3)—london.gov.uk
    Approved Document B Vol 1, paras 1.1-1.2All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering City of London
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    A residential area measured in a few thousand homes

    The City's resident population is tiny. 4,914 households live there, and only 2 per cent of them in a house. The rest are flats, so almost every project involves a freeholder, a managing agent and neighbours above and below.

    Heritage controls are heavy for such a small area. The council publishes 28 conservation areas, and there is 1 Article 4 direction. Historic England lists 637 entries, and 53 scheduled monuments lie inside the boundary. Work that digs, even for a service run, may meet archaeology.

    Small flats, tight fire rules

    In a compact flat, escape and alarm rules shape the plan. For an upper-floor bedroom: Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor. For detection: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604.

    Ventilation is the other trade-off. Windowless bathrooms and kitchens rely on fans: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s. We show each fan and its duct route on the plan, because in a high block the route to an outside wall may run through another owner's property or a protected ceiling.

    Where the building is listed, the choice of product matters as much as its performance. We offer options, not a single answer, so the consent officer can pick what suits the fabric.

    How the City's planning figures read

    The City's figures need care. Across all application types, the council granted 97 per cent in its latest published year. Householder applications are almost absent: the latest return holds 1 decision, which is too few to say anything about a typical case.

    The council also processed 16 lawful development certificate applications. We therefore rely on the individual case officer's pre-application advice, not on borough percentages. Treat any ratio drawn from a single decision with suspicion.

    Working in a managed estate or listed block

    Many City homes sit in a managed block with its own rules: a managing agent, a service charge, hours for noisy work and a licence for alterations. Those rules are in the lease, not in planning law, and a perfectly lawful alteration can still breach them. We ask for the lease and the licence conditions before pricing.

    Our drawings are written so that the freeholder's surveyor can read them quickly: a clear existing and proposed layout, a note of every structural or service change, and a specification that names the products.

    Where a listed building is involved, we separate the work that touches historic fabric from the work that does not, so a decision on one part does not hold up the other.

    Costs, levy and next steps

    We quote a fixed fee after the free check. Where work adds new residential floor area, the levy is £251.05/m² (Riverside); £159.00/m² (Rest of City) [schedule rates £150 and £95], and the Mayoral band is 1; both depend on measured area, so we survey carefully.

    If structure changes, structural calculations in City of London will be needed, and for the regulatory submission, building regulations drawings in City of London. The borough summary is architectural drawings in City of London. Neighbouring services run in Westminster and Camden.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need consent to alter a Barbican flat?

    Often. The estate is listed, and the council's Barbican guidelines say what residents may change. Ask us before you commission anything; we check the guidance and the lease.

    How many homes are there in the City of London?

    The ONS household count is 4,914, which is why the planning statistics for householder work are thin.

    Does archaeology affect construction drawings in the City?

    Where work goes below ground, yes. With 53 scheduled monuments in the area, we ask early whether the council wants an archaeological condition.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.