020 7864 7245Request a fixed quote

Tower Hamlets, London

Construction drawings in Tower Hamlets

Construction drawings in Tower Hamlets are the technical set for flats, converted warehouses and heritage terraces: structure, fire, sound, insulation and drainage in a form a builder can price. Few of the homes are houses. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Construction drawings in Tower Hamlets: a borough of flats

    Just 12 per cent of Tower Hamlets' 120,539 households live in a house, and 23.1 per cent own their home. Most construction sets here therefore concern space inside a building owned by someone else or shared with neighbours: a flat refitted, a warehouse unit divided, a ground floor reorganised.

    The council's High Density Living SPD and Central Area Good Growth SPD reflect that density. They are about the quality of homes and the shape of growth, and the technical set cannot repeat them. What it does is turn the permitted layout into floor build-ups, partitions, services and escape routes that a contractor can price.

    Density sets the order of work. Hoists, deliveries and noisy hours are often limited, so we draw what can be prefabricated or ordered in advance and mark the sequence on the sheets, which saves time when access is tight. A warehouse conversion adds another layer: old floors are rarely level, and structure above and below may belong to someone else. We survey levels carefully and draw screed depths and thresholds to suit what is there.

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Local figures for Tower Hamlets

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas59 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions64 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries916 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Grade I listed entries21 list entries—planning.data.gov.uk
    Households living in a house12 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households23.1 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Householder applications granted92.7 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Average price, flat430,120 GBP2026-07publicdata.landregistry.gov.uk
    Approved Document B Vol 1, paras 1.1-1.2All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604—gov.uk
    Approved Document B Vol 1, 2019 ed. incl. 2026 amendments, para 2.10Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Tower Hamlets
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Heritage in Tower Hamlets: listed terraces, directions and world heritage

    Historic England lists 916 entries here, 21 at Grade I and 39 at Grade II*. The borough has 59 conservation areas, 64 Article 4 directions and 2 World Heritage Sites in its heritage data.

    For a listed terrace, the set records materials, mortar, lime-based finishes and window sections as design choices. It also shows how new elements reach the energy standard: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Where full compliance would damage the building, the reasoning is stated on the sheet.

    Where a scheme needs consent first, planning drawings in Tower Hamlets cover it, and the technical set follows what is permitted.

    Fire, escape and sound in dense buildings

    In a shared building the question is always what happens next door. Detection is drawn as All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604, with the interlinks shown. Where a bedroom is above the ground, the opening is Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor.

    Floors and party walls carry noise between homes. When a floor is replaced or a layout changes, the new build-up is given on a section with the product named, so nothing thinner can be substituted on site.

    Kitchens and bathrooms are drawn with extract rates, since the figures are: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s. A flat with an internal bathroom needs a duct route that works with the structure above.

    What the planning figures say

    Tower Hamlets decided 191 householder applications in its latest published year, a small number in line with how few houses there are, and granted 92.7 per cent, with 95.8 per cent decided in time. Large rear extension notifications are rarer still: 3 granted and 4 refused.

    Flats average £430,120 here. A refit of a flat is a large sum against that, and the set protects it by removing the unknowns before a builder starts. We list the items that the lease and the freeholder usually care about, such as noise, waterproofing and the position of soil pipes, so they can be agreed once.

    Fee, checks and neighbouring boroughs

    The fee is fixed after a free constraints check, and every sheet is checked by a second chartered technologist. The set can be submitted as building regulations drawings in Tower Hamlets, with structural calculations in Tower Hamlets behind any new opening. The borough overview is architectural drawings in Tower Hamlets, and we also draw in Newham and Southwark.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need construction drawings for a flat in Tower Hamlets?

    For structural changes, new layouts, bathrooms and kitchens with drainage changes you will need them, and a freeholder commonly asks for them before consent.

    How do listed buildings in Tower Hamlets affect the drawings?

    They carry more material detail and a written reason for any departure from the energy standard, because the conservation officer reads them.

    Can construction drawings help with limited site access?

    Yes. They show what can be ordered or prefabricated in advance, so deliveries and noisy work are kept short.

    How much do construction drawings in Tower Hamlets cost?

    It is a fixed quote after a free constraints check, because the fee depends on the size and complexity of the building.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.